HomeMy WebLinkAbout0103934-Building #3344 (patio)OSHKOSH
ON THE WATER
Job Address 3344 ISAAC LN
Designer
Category 142 - Decks, Patios, Ramps
Type · Building (~ Sign
Zoning
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. Ft.
Garage 0 Sq. Ft.
Foundation
· Poured Concrete (~) Floating Slab
O Concrete Block (~) Post
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner PATRIARCHS SUBDIVISION LLC Create Date
Contractor GARRY H DECKER & CO
Plan
No 103934
09/03/2003
Occupancy Permit
Park Dedication
Not Required
(~)Canopy (~) Fence (~ Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
(~) Pier (~) Other
(~) Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures 0
Size
[] Projection
Canopies
Signs
0
0
Use/Nature
of Work
IONDO/LATE PERMIT/ Installing a 12'x17' patio using 1' square concrete pavers.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
Plumbing Contractor
$500.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication $0.00
Date 09/05/2003 FinallO.P. 00/00/0000
[] Permit Voideda
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder{a) andrto s.e..cpre any ngcessary approvals befor~ startin~such activity, q .1~ '"~ '~'h
~'- '*~ ' Agent/Owner
Address 1113 OREGON ST OSHKOSH WI 54902 - 6484 Telephone Number 235-8035, M 379-803
To Schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.