Loading...
HomeMy WebLinkAbout0103881 BOSHKOSH ON THE WATER .lob.Address 944 OSBORN AVE Designer Category CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner DOROTHYWWOLLER LIFE ESTATE Contractor OWNER 162 - Wrecking Residential Accessory Structures No 103881 Create Date 09/03/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete (~ Floating Slab (~ Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Razing the existing detached garage, off street parking was already established outside of the garage as the garage is unsafe. New of Work Owner is Jeff Fillmore. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $500.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 09/03/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 944 OSBORN AVE Agent/Owner OSHKOSH WI 54902 - 6358 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. OSHKOSH ON THE WATER Job Address 944 OSBORN AVE CITY OF OSHKOSH No 103881 BUILDING PERMIT - APPLICATION AND RECORD Owner DOROTHY W WOLLER LIFE ESTATE Create Date 09/03/2003 Designer Contractor OWNER Category 162 - Wrecking Residential Accessory Structures Plan Type O Building (~ Sign (~ Canopy (~ Fence · Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq, Ft. Rooms 0 Height 0 Ft. [] Projection Finished/Living 0 Sq. Ft, Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation · Poured Concrete (~ Floating Slab O Pier (~ Other O Concrete Block O Post (~ Treated Wood Occupancy Permit Flood Plain __ Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature ~FPJ Razing the existing detached garage, off street parking was already established outside of the garage as the garage is unsafe. of Work 4ew Owner is Jeff Fillmore. HVAC Contractor Electric Contractor Fees: Valuation Issued By: (~ $500.00 Plan Approval $0.00 Permit Fee Paid ~[~ Permit Voided~ Plumbing Contractor $20.00 Park Dedication $0.00 Date 09/03/2003 Final/O.P. 00/00/0000 In the perfon'nance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit~.a~tion within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to .~re any~t~vals before starting such activity. Signature ~....~.~'~ ~7~ Date ~ ~" AgentJOwner Address 944 OSBORN AVE OSHKOSH WI 54902 - 6358 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified othet~Nise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not pe~ormed within two business days from the time the project is ready.