Loading...
HomeMy WebLinkAbout0103874-Building (garage/driveway)OSHKOSH ON THE WATER Job Address 1133 FILLMORE AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner GREGORY F POSTL Create Date Contractor READY BUILDERS INC No 103874 09/03/2003 Category 149 - Raze detached garage, construct detached garage Type · Building Zoning Unfinished/Basement Finished/Living Garage Foundation Sign 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. Baths O Poured Concrete (~ Floating Slab O Pier (~ Concrete Block (~ Post Occupancy Permit Park Dedication (~ Canopy (~ Fence Class of Const: Rooms 0 Height Bedrooms 0 Stories 0 Other Plan O Raze 0 Ft. (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Size [] Projection Canopies 0 Signs 0 IFPJ Raze old garage and construct a new 24' x 30' detached garage and driveway. Elevation of finished floor shall be above the 100 yrl cod elevation. Use/Nature of Work HVAC Contractor Electric Contractor Fees: Valuation $15,500.00 Issued By: ~ Plan Approval $0.00 Permit Fee Paid [] Permit Voided Plumbing Contractor $83.00 Park Dedication $0.00 Date 09/03/2003 Final/O.P. 00/00/0000 in the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit applicaflon within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to ¢¢cure any necessary aDFroyais ~ starting such activity. Agent/Owner Address 1133 FILLMORE AVE OSHKOSH ,W~ 54~902 - 3409 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKMST JOB LOCATION: PROPERTY OWNER/CONTRACTOR: CONSTRUCTION DATA: New Construction · TYPE OF CONSTRUCTION: (i.e. fence, pool, paddng lot, sign, etc.) ZONING, Addition COMPLIANCE CHECKLIST Alteration DEFICIENT COMMENTS Use Lot Width Lot Area Lot Ama Per Family Floodplain Front Yard · Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with p.C. or BZA Conditions of Approval Signage Standards Drainage Plan REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. u~"~APPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEVVED BY: ~ DATE: