Loading...
HomeMy WebLinkAbout0103879-Building (windows/doors/front porch)OSHKOSH ON THE WATER Job Address 1015 CHERRY ST Designer Category 141 - Exterior Remodeling Type · Building (~) Sign CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner BRIAN & MELLISA PIZON Contractor OWNER Canopy (~) Fence (~ Raze No 103879 Create Date 09/03/2003 Plan Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Finished/Living 0 Sq. Ft. Bedrooms 0 Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete (~) Floating Slab (~) Pier O Concrete Block (~ Post (~ Treated Wood Occupancy Permit Not Required Flood Plain __ Park Dedication # Dwelling Units Use/Nature of Work Height Stories Other 0 Ft. Size [] Projeclion I Canopies Signs 0 0 Height Permit 0 # Structures 0 {ENTAL/Installing 20 replacement windows and 4 exterior doors (same size and location). Reconstructing a 7'xl 4' front porch that will lot extend beyond the setbacks of the house. The roof of the porch will be removed. A minimum of 48" of frost protection is required. HVAC Contractor Electric Contractor Fees: Valuation Issued By: ~ Plumbing Contractor $8,000.00 Plan Approval $0.00 Permit Fee Paid [] Permit Voided~ $55.00 Park Dedication $0.00 Date 09/03/2003 Finat/O.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to sene.any neces, sary apjprov, al~ before starting such activity. ~ ' -¢ Agent/Owner ( Address 2400 HERITAGE CT OSHKOSH WI 54904 - 5802 Telephone Number 420-7253 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the tirade the project is ready.