HomeMy WebLinkAbout0103870-BuildngOSHKOSH
ON THE WATER
.lob ,Address 103 W 16TH AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner DOLORESMSCHROEDER
Contractor DAN V BINDER CONSTRUCTION
Category 140 - Interior Remodeling
No 103870
Create Date 09/03/2003
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence ~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation (~) Poured Concrete (~) Floating Slab (~) Pier O Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/Convert a 6x8 portion of front porch into a bathroom.
of Work
HVAC Contractor Plumbing Contractor D.R. HANSEN PLBG.
Electric Contractor SLIM'S ELECTRIC, INC.
Fees: Valuation $1,800.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00
Issued By: Date 09/03/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1224 W SOUTH PARK AVE OSHKOSH WI 54902 - 0000 Telephone Number 231-2114
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.