Loading...
HomeMy WebLinkAbout0103869-Buildnig (roof)OSHKOSH ON THE WATER Job Address 838 FREDERICK ST Designer Category Type · Building (~ Sign 141 - Extedor Remodeling CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner TODD L/JAMES R LEVENDUSKY Create Date Contractor OBY CONSTRUCTION LLC Plan Zoning Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation · Poured Concrete O Floating Slab (~ Concrete Block (~ Post Occupancy Permit Not Required Park Dedication No 103869 09/03/2003 (~) Canopy ~ Fence Class of Const: Rooms 0 Height Bedrooms 0 Stories Baths 0 (~ Pier ~) Other (~ Treated Wood Flood Plain # Dwelling Units 0 Raze 0 Ft. Size [] Projection Canopies 0 Signs 0 Height Permit # Structures 0 Use/Nature RENTAL/PER PROP ORDERS/Re-roofing the house (complete tear off) and replacing some damaged siding. The siding will match the of Work existing siding on the house. NO STRUCTURAL WORK. HVAC Contractor Electric Contractor Fees: Valuation Issued By: $5,225.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $45.00 Park Dedication $0.00 Date 09/03/2003 Final/O.P. 00/00/0000 [] Permlt Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder s) and to secure aJ~y.necessar'~_approvals before starting st~ activity. Signature ~.~ ~"~,~4-, (',~.~.~ ~C~z~'-~.~ ~ Date~:)~ ~ ~ ~- ~,') ~ [- AgentJO.~r Address 838 FREDERICK ST OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.