HomeMy WebLinkAbout0103869-Buildnig (roof)OSHKOSH
ON THE WATER
Job Address 838 FREDERICK ST
Designer
Category
Type · Building (~ Sign
141 - Extedor Remodeling
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner TODD L/JAMES R LEVENDUSKY Create Date
Contractor OBY CONSTRUCTION LLC
Plan
Zoning
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. Ft.
Garage 0 Sq. Ft.
Foundation · Poured Concrete O Floating Slab
(~ Concrete Block (~ Post
Occupancy Permit Not Required
Park Dedication
No 103869
09/03/2003
(~) Canopy ~ Fence
Class of Const:
Rooms 0 Height
Bedrooms 0 Stories
Baths 0
(~ Pier ~) Other
(~ Treated Wood
Flood Plain
# Dwelling Units 0
Raze
0 Ft.
Size
[] Projection
Canopies 0
Signs 0
Height Permit
# Structures 0
Use/Nature RENTAL/PER PROP ORDERS/Re-roofing the house (complete tear off) and replacing some damaged siding. The siding will match the
of Work existing siding on the house. NO STRUCTURAL WORK.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
$5,225.00 Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid $45.00 Park Dedication $0.00
Date 09/03/2003 Final/O.P. 00/00/0000
[] Permlt Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder s) and to secure aJ~y.necessar'~_approvals before starting st~ activity.
Signature ~.~ ~"~,~4-, (',~.~.~ ~C~z~'-~.~ ~ Date~:)~ ~ ~ ~- ~,') ~
[- AgentJO.~r
Address 838 FREDERICK ST OSHKOSH WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.