HomeMy WebLinkAbout25-03 CO #1 (FINAL)_3-20-26TO: Vinton Construction Company CHANGE ORDER #1 (FINAL)
1322 33rd Street
Two Rivers, WI 54241
Your present contract with the City of Oshkosh, Contract No. 25-03, awarded September 9, 2025, is hereby amended
and changed as follows:
NET DECREASE TO SECTION I: ($90,022.77)
NET INCREASE TO ADDITIONAL WORK:$19,800.00
NET DECREASE TO CONTRACT ($70,222.77)
SECTION I TOTALS
BID TOTAL $824,321.63 $824,321.63
CO #1 ($70,222.77)($70,222.77)
CONTRACT TOTAL $754,098.86 $754,098.86
CITY OF OSHKOSH
BY:
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Approved as to form:
City Attorney
DATE: MARCH 20, 2026
______________________________
Comptroller
______________________________
Contractor
______________________________
Approved and accepted:
______________________________
City Manager
City Clerk
______________________________
Docusign Envelope ID: 176F4ADA-9455-4EA8-A310-3865802136C2
25-03 CHANGE ORDER #1 (FINAL)
25-03
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1010
Clearing; complete as
specified
Lump
Sum 1.00 1.00 $1,500.00
1020
Grubbing; complete as
specified
Lump
Sum 1.00 1.00 $1,500.00
1050
Mobilization; complete as
specified
Lump
Sum 2.00 1.85 -0.15 $40,500.00 ($5,999.99)
1120
Removing concrete and
asphalt sidewalk and
driveway; complete as
specified
Square
Feet 2,000.70 2,527.20 526.50 $1.86 $979.29
1200
Unclassified excavation;
complete as specified
Lump
Sum 1.00 1.00 $43,000.00
1309
7" concrete pavement HES
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
and traffic control; complete
as specified
Square
Yards 1,667.90 1,253.80 -414.10 $109.78 ($45,459.90)
1360
Adjust manholes and inlets;
complete as specified Each 7.00 7.00 $450.00
1370
Turf restoration; complete as
specified
Square
Yards 1,191.20 650.96 -540.24 $18.54 ($10,016.05)
1500
4" concrete sidewalk with 3"
CABC and grading;
complete as specified
Square
Feet 1,000.00 2,527.30 1527.30 $12.50 $19,091.25
1550
No. 4 reinforcing rods -
deformed; epoxy-coated;
complete as specified
Linear
Feet 480.00 0.00 -480.00 $1.00 ($480.00)
1560
Drilled No. 4 sidewalk tie
bars - deformed; epoxy-
coated; complete as
specified Each 80.00 64.00 -16.00 $6.00 ($96.00)
2001
Furnish and install 8" storm
sewer; complete as specified
Linear
Feet 1,254.00 1,242.50 -11.50 $52.84 ($607.67)
2004
Furnish and install 12" RCP
Class III storm sewer;
complete as specified
Linear
Feet 14.00 15.00 1.00 $104.57 $104.57
2201
Furnish and install standard
storm sewer manhole (4'
diameter); complete as
specified
Vertical
Feet 10.00 4.10 -5.90 $846.05 ($4,991.69)
2205
Furnish and install standard
storm sewer manhole (8'
diameter); complete as
specified
Vertical
Feet 10.00 9.88 -0.12 $2,911.31 ($349.36)
Page 2 of 4
Docusign Envelope ID: 176F4ADA-9455-4EA8-A310-3865802136C2
25-03 CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
2235
Furnish and install Type 1
inlet (with 18" sump);
complete as specified Each 2.00 2.00 $2,954.44
2237
Furnish and install Type 3
inlet (with 18" sump);
complete as specified Each 1.00 1.00 $2,445.40
2408
Furnish and install storm
sewer lateral inlet; complete
as specified Each 18.00 18.00 $2,104.75
2500
Furnish; install; maintain;
and remove Type A inlet
protection; complete as
specified Each 22.00 22.00 $135.00
2506
Furnish; install; maintain;
and remove Type D inlet
protection; complete as
specified Each 4.00 4.00 $135.00
2512
Furnish; install; maintain;
and remove stone tracking
pad; complete as specified Each 1.00 1.00 $2,000.00
2514
Furnish; install; maintain;
and remove silt fence;
complete as specified
Linear
Feet 1,626.00 1,626.00 $2.35
2600
Furnish and install topsoil 6"
depth; complete as specified
Square
Yards 13,704.00 13,314.24 -389.76 $5.86 ($2,283.99)
2620
Furnish and install turf grass;
complete as specified
Square
Yards 13,704.00 13,704.00 $0.75
2632
Furnish and install Class I;
Urban; Type A erosion
control mat; complete as
specified
Square
Yards 13,704.00 258.50 -13,445.50 $1.75 ($23,529.63)
2804
Remove 30" and smaller
storm sewer; complete as
specified
Linear
Feet 14.00 14.00 $30.89
2812
Remove storm sewer
manholes and inlets;
complete as specified Each 2.00 2.00 $541.75
2850
Connect to existing storm
sewer main; complete as
specified Each 4.00 5.00 1.00 $961.81 $961.81
3200
Furnish and install 8" x 4"
sanitary sewer factory wyes
or tees; complete as
specified Each 18.00 10.00 -8.00 $699.03 ($5,592.24)
3230
Furnish and install 4"
sanitary sewer laterals
(new); complete as specified
Linear
Feet 543.00 552.50 9.50 $69.59 $661.11
3236
Furnish and install sanitary
sewer lateral marker balls;
complete as specified Each 36.00 36.00 $87.07
Page 3 of 4
Docusign Envelope ID: 176F4ADA-9455-4EA8-A310-3865802136C2
25-03 CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
3238
Furnish and install clay
dams; complete as specified Each 18.00 18.00 $322.22
3300
Furnish and install
connection to existing 8"
sanitary sewer mains;
complete as specified Each 36.00 20.00 -16.00 $655.07 ($10,481.12)
4042
Furnish and install 1" water
service (new); complete as
specified
Linear
Feet 1,117.00 1,088.50 -28.50 $67.83 ($1,933.16)
4048
Furnish and install 1"
corporation and stop box;
complete as specified Each 18.00 18.00 $1,475.11
4055
Furnish and install water
service clay dams; complete
as specified Each 18.00 18.00 $322.22
SECTION I (BID ITEMS 1010 - 4055) - SUBTOTAL: $21,798.03 ($111,820.80)
NET DECREASE TO SECTION I: ($90,022.77)
ADDITIONAL WORK REQUIRED: FUTURE CO #1
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1-20000
Furnish and install 12" pvc;
complete as specified
Linear
Feet 0.00 0.00 $102.00
1-30000
Furnish and install 10" x 4"
wye; complete as specified Each 0.00 8.00 8.00 $960.00 $7,680.00
1-30001
Furnish and install
connection to 10" sanitary
sewer main; complete as
specified Each 0.00 16.00 16.00 $690.00 $11,040.00
1-30002
Furnish and install 10"
sanitary sewer; complete as
specified
Linear
Feet 0.00 0.00 $255.00
1-60000
Remove chain link fence;
complete as specified
Linear
Feet 0.00 108.00 108.00 $10.00 $1,080.00
$19,800.00 $0.00
$19,800.00
($90,022.77)
$19,800.00
NET DECREASE TO CONTRACT: ($70,222.77)