Loading...
HomeMy WebLinkAbout26-08 CO #1 (FINAL)_3-31-26TO: DE GROOT, INC. CHANGE ORDER #1 (FINAL) 4201 CHAMPION ROAD GREEN BAY, WI 54311 Your present contract with the City of Oshkosh, Contract No. 26-08, awarded December 9, 2025, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($24,996.76) NET DECREASE TO CONTRACT ($24,996.76) SECTION I TOTALS BID TOTAL $496,141.55 $496,141.55 CO #1 ($24,996.76)($24,996.76) CONTRACT TOTAL $471,144.79 $471,144.79 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney DATE: MARCH 31, 2026 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ Docusign Envelope ID: 0014F172-2B7A-8551-8148-723A7AC98228 26-08 CHANGE ORDER #1 (FINAL) 26-08 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1010 Clearing; complete as specified Stations 0.80 1.00 0.20 $1,590.75 $318.15 1011 Clearing; complete as specified Inch Diameter 60.00 65.00 5.00 $31.82 $159.10 1020 Grubbing; complete as specified Stations 0.80 1.00 0.20 $1,590.75 $318.15 1021 Grubbing; complete as specified Inch Diameter 60.00 65.00 5.00 $31.82 $159.10 1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $5,075.25 1200 Unclassified excavation; complete as specified Cubic Yards 25.00 0.00 -25.00 $20.20 ($505.00) 1360 Adjust manholes and inlets; complete as specified Each 4.00 3.00 -1.00 $858.50 ($858.50) 1370 Turf restoration; complete as specified Square Yards 275.00 0.00 -275.00 $24.36 ($6,699.00) 1700 Sawing existing pavement; complete as specified Linear Feet 30.00 30.00 $6.06 2055 Furnish and install 38" x 60" HERCP Class III storm sewer; complete as specified Linear Feet 50.00 16.00 -34.00 $308.21 ($10,479.14) 2061 Furnish and install 53" x 83" HERCP Class III storm sewer; complete as specified Linear Feet 575.00 576.00 1.00 $549.50 $549.50 2225A Furnish and install storm sewer junction chamber M-1; complete as specified Each 1.00 1.00 $33,258.39 2225B Furnish and install storm sewer junction chamber M-2; complete as specified Each 1.00 1.00 $32,720.28 2225C Furnish and install storm sewer junction chanmber M- 3; complete as specified Each 1.00 1.00 $32,720.28 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 15.00 6.00 -9.00 $85.85 ($772.65) 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 17.00 0.00 -17.00 $35.35 ($600.95) 2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 2.00 1.00 -1.00 $1,515.00 ($1,515.00) 2514 Furnish; install; maintain; and remove silt fence; complete as specified Linear Feet 150.00 100.00 -50.00 $3.03 ($151.50) Page 2 of 3 Docusign Envelope ID: 0014F172-2B7A-8551-8148-723A7AC98228 26-08 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 10.00 0.00 -10.00 $20.20 ($202.00) 2524 Furnish; install; maintain; and remove dewatering tank system; complete as specified Each 1.00 0.00 -1.00 $1,010.00 ($1,010.00) 2806 Remove 33" - 60" storm sewer; complete as specified Linear Feet 875.00 862.00 -13.00 $15.15 ($196.95) 2812 Remove storm sewer manholes and inlets; complete as specified Each 3.00 2.00 -1.00 $505.00 ($505.00) 2850 Connect to existing storm sewer main; complete as specified Each 5.00 4.00 -1.00 $1,818.00 ($1,818.00) 2920 Remove chain link fence; complete as specified Linear Feet 100.00 86.00 -14.00 $26.51 ($371.14) 2921 Remove and replace chain link fence; complete as specified Linear Feet 150.00 153.00 3.00 $64.69 $194.07 2950 Excavation special (storm); complete as specified Tons 50.00 0.00 -50.00 $20.20 ($1,010.00) SECTION I (BID ITEMS 1010 - 2950) - SUBTOTAL: $1,698.07 ($26,694.83) NET DECREASE TO SECTION I: ($24,996.76) ($24,996.76) NET DECREASE TO CONTRACT: ($24,996.76) NET DECREASE TO SECTION I: Page 3 of 3 Docusign Envelope ID: 0014F172-2B7A-8551-8148-723A7AC98228