Loading...
HomeMy WebLinkAbout0112596-HVAC (hvac system) 112596 CITY OF OSHKOSH No OSHKOSHHVAC PERMIT - APPLICATION AND RECORD ON THE WATER NORTHERN TELEPHONE & DATA CORP Job AddressOwner 144 HIGH AVE Create Date02/07/2005 ContractorCENTRAL HEATING SERVICE INCCategory512 - Ind. & Comm-BothPlanN6-103-1204 OilElectric üü GasSolarSolid Fuel üü NewReplaceOther System üü Forced AirRadiantSteamA/CVent ElectricHot WaterSuppl.Con. Burner Chimney TypeChimney AChimney BDirect VentNot Applicable Heat LossAs ApprovedExistingNot ApplicableValue0 As Per PlanVariableOther BTU RateValue Use/Nature Comm/ Install HVAC system as per State Transaction ID # 1103354. · MUN 30-35 (I)(5) All roof top and ground level mechanical equipment and of Work utilities shall be fully screened from view of any street or residential zoning district.Contact Matt Tucker - Associate planner (920) 236-5062 for additional information on screening requirements. All screening shall be properly anchored in place to resist wind loads. Plan Approval$0.00 Fees: Valuation$8,400.00Permit Fee Paid$131.00 Issued By:Date02/07/2005 Permit Voided Parcel Id #0101000000 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. SignatureDate Agent/Owner Address1565 HARRISON STREETOSHKOSHTelephone Number(920) 235-6670 WI54901-0 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.