Loading...
HomeMy WebLinkAbout0112563 POSHKOSH ON THE WATER .lob Address 460 N WESTHAVEN DR Contractor FIELDS PLUMBING Bathtub 0 Shower 2 Whirlpool 0 Floor Drain 1 Lavatory 2 Lndry Tray 0 Toilet 2 Lndry Stndp 0 Res. Sink 1 Disposal 0 Bar Sink 0 Dishwasher 0 Water Heater 0 Sump Pump 0 Site Drain 0 Classrm Sink 0 Roof Drain 0 Breakrm Sink 0 CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner EDWARD R/JUDY M POLLEX Category 410 - Residential-Interior No 112563 Create Date 01/12/2005 Plan Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work SFR/ Adding a 18' x 20'-6" addition master bathroom. off the rear of the house, finishing the basement to include a full bathroom and a den and remodeling the Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Valuation $7,000.00 Plan Approval $0.00 Permit Fees $56.00 ~ Permit Voided Issued By Parcel Id # 1622700000 Date 02/03/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1939 SOUTHLAND LN NEW LONDON WI 54961 - 0000 Telephone Number 920-982-5813 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.