Loading...
HomeMy WebLinkAbout0112603 B(~ CITY OF OSHKOSH OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1225 PHEASANT CREEK DR Owner MICHAEL A/JENNI VILLENEUVE Designer Contractor OWNER Category 140 - Interior Remodeling No 112603 Create Date 02/08/2005 Plan Type 10 Building ~ Sign ~ Canopy ~ Fence ~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Remodeling the basement to create a family room, office area, and bathroom. A minimum of 7' is required for finished ceiling height. of Work Combustion air will be required for the utility room. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $7,250.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $62.00 Park Dedication $0.00 Date 02/05/2005 Final/O.P. 00/00/0000 Parcel Id # 1342503900 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1225 PHEASANT CREEK DR Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.