HomeMy WebLinkAboutWatershed_Study_MapOAKS TR pvt
HAZEL ST
N MAIN ST
EVANS ST
BOWEN ST
GROVE ST
GRAND ST
MERRITT AVE
E NEVADA AVE
E MURDOCK AVE
E IRVING AVE
BALDWIN AVE
MENOMINEE DR
E PARKWAY AVE
BOYD ST
E NEW YORK AVE
HARRISON ST
BROAD ST
EASTMAN ST
POWERS ST
E CUSTER AVE
MONROE ST
STERLING AVE
SIEWERT TR
E MELVIN AVE
DIVISION ST
JEFFERSON ST
OAK ST
PRATT TR
DOEMEL ST
E TENNESSEE AVE
E LINCOLN AVE
HURON AVE
MT VERNON ST
E BENT AVE
CLIFFVIEW DR
FULTON AVE
FAIRVIEW ST
NORTHPOINT STASHLAND ST
DALE AVE
HICKORY ST
GRABER ST
WHITE SWAN DR
CHESTNUT STE MURDOCK ST
CLEVELAND AVE
OXFORD AVE
HUDSON AVE
LINDE STMADISON ST
LAWNDALE ST
PYLE AVE
PLEASANT ST
HURON CT
ROCK PL
FLUOR CT
GEHRES CT
STEVENS CT
MARSTON PL
MT VERNON ST
BROAD ST
BROAD ST
JEFFERSON ST
OAK ST
E TENNESSEE AVE
E LINCOLN AVEDIVISION ST
POWERS ST
MONROE ST
FULTON AVE
E MELVIN AVE
MONROE ST
HURON AVE
JEFFERSON ST
OAK ST
E CUSTER AVE
MT VERNON ST
I:\Engineering\Maps\Steve Gohde\Menominee Park\Watershed Study Map.pdf
Chestnut
Nevada
LawndaleEast New York
Baldwin
Melvin
Siewert
Lincoln
Irving
Parkway
Merritt
MenomineeParkCentral
MENOMINEE PARKAREA STORMWATERDRAINAGE BASINS
µ0 1,000500Feet
Studies ConductedChestnut St (41.43 Acres) Upgraded Outfall: From Metal to ConcreteNevada Ave (94.79 Acres) Existing Pump StationLawndale St (8.91 Acres) Upgraded Outfall: From 18 to 21 inchEast New York Ave (51.72 Acres) Upgraded Outfall: From 30 to 42 inchBaldwin Ave (121.99 Acres) New Detention Basin in 2008 Upgraded New York Ave Storm Sewer: 24 to 60 inchMelvin Ave (105.81 Acres) New Pump Station in 2010 Upgraded Storm Sewer: 42 inch to 4' x 8' Box CulvertParkway Ave (108.65 Acres) Upgraded Outfall: From 42 to 54 inch
No Studies ConductedLincoln Ave (25.97 Acres)Siewert Trail (14.05 Acres)Merritt Ave (63.52 Acres)Menominee Park Central (9.21 Acres)Irving Ave (95.11 Acres)* (*Note - Scheduled for 2012) NDB = New Detention Basin
MAP CREATED: JULY - 2010
NDB