Loading...
HomeMy WebLinkAboutWatershed_Study_MapOAKS TR pvt HAZEL ST N MAIN ST EVANS ST BOWEN ST GROVE ST GRAND ST MERRITT AVE E NEVADA AVE E MURDOCK AVE E IRVING AVE BALDWIN AVE MENOMINEE DR E PARKWAY AVE BOYD ST E NEW YORK AVE HARRISON ST BROAD ST EASTMAN ST POWERS ST E CUSTER AVE MONROE ST STERLING AVE SIEWERT TR E MELVIN AVE DIVISION ST JEFFERSON ST OAK ST PRATT TR DOEMEL ST E TENNESSEE AVE E LINCOLN AVE HURON AVE MT VERNON ST E BENT AVE CLIFFVIEW DR FULTON AVE FAIRVIEW ST NORTHPOINT STASHLAND ST DALE AVE HICKORY ST GRABER ST WHITE SWAN DR CHESTNUT STE MURDOCK ST CLEVELAND AVE OXFORD AVE HUDSON AVE LINDE STMADISON ST LAWNDALE ST PYLE AVE PLEASANT ST HURON CT ROCK PL FLUOR CT GEHRES CT STEVENS CT MARSTON PL MT VERNON ST BROAD ST BROAD ST JEFFERSON ST OAK ST E TENNESSEE AVE E LINCOLN AVEDIVISION ST POWERS ST MONROE ST FULTON AVE E MELVIN AVE MONROE ST HURON AVE JEFFERSON ST OAK ST E CUSTER AVE MT VERNON ST I:\Engineering\Maps\Steve Gohde\Menominee Park\Watershed Study Map.pdf Chestnut Nevada LawndaleEast New York Baldwin Melvin Siewert Lincoln Irving Parkway Merritt MenomineeParkCentral MENOMINEE PARKAREA STORMWATERDRAINAGE BASINS µ0 1,000500Feet Studies ConductedChestnut St (41.43 Acres) Upgraded Outfall: From Metal to ConcreteNevada Ave (94.79 Acres) Existing Pump StationLawndale St (8.91 Acres) Upgraded Outfall: From 18 to 21 inchEast New York Ave (51.72 Acres) Upgraded Outfall: From 30 to 42 inchBaldwin Ave (121.99 Acres) New Detention Basin in 2008 Upgraded New York Ave Storm Sewer: 24 to 60 inchMelvin Ave (105.81 Acres) New Pump Station in 2010 Upgraded Storm Sewer: 42 inch to 4' x 8' Box CulvertParkway Ave (108.65 Acres) Upgraded Outfall: From 42 to 54 inch No Studies ConductedLincoln Ave (25.97 Acres)Siewert Trail (14.05 Acres)Merritt Ave (63.52 Acres)Menominee Park Central (9.21 Acres)Irving Ave (95.11 Acres)* (*Note - Scheduled for 2012) NDB = New Detention Basin MAP CREATED: JULY - 2010 NDB