HomeMy WebLinkAboutCampbell_Creek_Watershed_PIM
Campbell Creek Watershed
Storm Water Management Plan
Public Information Meeting
March 19 and March 26, 2008
6:30 p.m. – 9:00 p.m.
Westhaven Golf Course Clubhouse
Campbell Creek Watershed Storm Water Management Plan
Purpose of Meeting
The purpose of tonight’s meeting is to provide you with information about the proposed storm water
management plan for the Campbell Creek Watershed. The Campbell Creek Watershed is a long narrow
drainage area that begins just southwest of the City of Oshkosh along STH 44. The watershed drains in
a northeasterly direction through the Southwest Industrial Park, through the eastern half of the
Westhaven Subdivision, crosses USH 41 and continues to Witzel Avenue just east of Lourdes Academy.
The Campbell Creek Watershed is shown in blue on the Watershed Maps on display. The areas shown
in green on the watershed maps drain to both Campbell Creek and Sawyer Creek depending on the
storm sewer system capacity.
There will be a formal presentation beginning at 7:00 p.m. The remainder of the meeting will be
conducted in an “open house” format. You are invited to inspect the display boards and review the
information included with this handout. Please feel free to ask questions or share your comments with
any of the City staff present.
There is a public input form attached to this handout for your use as well. We appreciate your input and
ask that you take a few moments to complete the form and deposit it in one of the two boxes provided,
or mail it to the Department of Public Works. Public Input boxes are located in the front of the room
and in the entry to the building.
Proposal Information
The City of Oshkosh frequently experiences flooding during rain events. Some of these flooding
incidents are severe, as were the June, 2004 and June, 1993 flood events. Other events are not as severe,
as were experienced in 1996, 1999 (twice), and 2000. The main cause of the flooding during storm
events is the inability of the storm sewer system to effectively convey the runoff.
As development takes place, pervious surfaces are replaced with impervious surfaces. The higher
percentage of impervious surfaces present in a watershed, the greater the amount of runoff generated.
From the beginning of development in the City of Oshkosh until 1990, there was no ordinance in place
to control the effect of storm water runoff from development. In addition to the increased amount of
runoff generated, design requirements have changed dramatically over the past two decades. Previously,
storm sewer systems were designed to convey only very small rainfall events, and the larger events were
left to flood streets. Current design standards require storm sewers to convey larger storm events before
flooding takes place on streets. The combination of lower design standards, increased impervious area
within the watershed, and a lack of storm water management regulations prior to 1990 have caused the
piping systems that were installed prior to the 1990’s to be incapable of conveying the amount of runoff
that is now generated.
The proposed storm water management plan includes a dual use dry detention pond / athletic fields at
Tipler Middle School, a wet detention pond at the National Guard Armory and a nature conservancy /
wet detention pond system at Westhaven Golf Course. In addition to the detention areas, there are
associated storm sewer system upgrades to efficiently convey runoff to the detention facilities. This
management plan effectively manages both the quantity of storm water flowing in the system and the
quality of that storm water prior to discharging to our lakes and river.
The Wisconsin Department of Natural Resources (DNR) has been mandated by the Federal
Environmental Protection Agency (EPA) to administer the requirements of the Clean Water Act (CWA)
in the State of Wisconsin. The DNR has issued permit coverage to all municipalities with a population
greater than 10,000. One part of this permit requires the municipalities to reduce the amount of
pollution in the storm water being discharges to Waters of the State. The DNR has chosen Total
Suspended Solids (TSS) as the pollutant of interest. TSS pollution is sediment, or dirt, that is carried in
storm water runoff. The permit requires the municipalities to reduce that amount of TSS being
discharged by 40%. For the City of Oshkosh, this means that we need to remove 677 tons/year of
sediment from our storm water. Current practices (street sweeping and existing wet detention ponds for
example) remove 309 tons/year. This means that in order to comply with the permit requirement, we
must remove an addition 368 tons of sediment per year. The proposed storm water management plan
will remove 68.1 tons/year in the Westhaven facility. The Armory site has the potential to remove
approximately another 30-35 tons/year if the DNR will permit all the water from Campbell Creek to be
routed through the pond. Typically the DNR does not allow the smaller storm events to be routed out of
the waterway. It is these smaller storms that convey the majority of the pollutants. Further discussion
with the DNR during the permitting process will determine what level of control can be obtained from
the Armory pond.
Public Comments
We encourage you to talk with the staff members that are present tonight and ask any questions you may
have. We also encourage you to complete the Public Input form attached to this handout and drop it in
the boxes provided, or mail it to the Department of Public Works by April 11, 2008.
For more information, please contact:
City of Oshkosh
Department of Public Works
215 Church Avenue
P.O. Box 1130
Oshkosh, WI 54903-1130
Phone: (920) 236-5065
Fax: (920) 236-5068
Email:
Dave Patek, P.E., Director of Public Works: dpatek@oshkoshwi.gov
Steve Gohde, P.E., Assistant Director of Public Works: sgohde@oshkoshwi.gov
James Rabe, P.E., Civil Engineer II: jrabe@oshkoshwi.gov
Campbell Creek Storm Water Management Plan
Public Information Meeting Comments/Questions
Use back of page if more space is required.
Name:
Address:
Phone:
Email:
Send to:
City of Oshkosh - Department of Public Works
215 Church Avenue
P.O. Box 1130
Oshkosh, WI 54903-1130
Attn: James Rabe
Phone: (920) 236-5065
Fax: (920) 236-5068