Loading...
HomeMy WebLinkAboutItem 4 PLAN COMMISSION STAFF REPORT FEBRUARY 3, 2026 ITEM 4: General Development Plan for a New High School Located at the Northeast Corner of Vinland Street and West Fernau Avenue (Valley Christian School) Owner/Applicant: Valley Christian/Wisconsin Independent Christian Schools Action Requested: The applicant requests approval of a General Development Plan (GDP) for a new high school. Applicable Ordinance Provisions: Planned Development standards - Section 30-387 Property Location and Background Information: The subject site consists of three vacant parcels and public right-of-way that is in the process of being vacated at the northeast corner of Vinland Street and West Fernau Avenue, approximately 33.4 acres. The southern parcel has frontage on recently dedicated West Fernau Avenue right-of-way and is zoned Institutional District with a Planned Development Overlay (I-PD). The two northern parcels are currently zoned Multi-family Residential-12 District (MR-12). Per the subsequent item, the applicant has requested rezone of the two northern parcels to I-PD to provide consistent zoning for all three subject properties. The surrounding area consists primarily of residential and vacant land uses. The 2040 Comprehensive Land Use Plan has the subject properties slated for Mixed Use. Adjacent Land Use and Zoning Existing Uses Zoning North Residential SR-5 South Vacant Town of Oshkosh East Vacant/Residential/Commercial MR-20 PD & Town of Oshkosh West Residential Town of Oshkosh Use/Site Design: The applicant is proposing to use the site for a new private high school. As proposed, the initial phase will be for a 39,000 sq. ft. school with a 318-stall parking lot. Future phases will include an additional building area, athletic fields, and additional parking. The applicant anticipates approximately 300 students and 40 employees with the initial development. The proposed indoor institutional use is a conditional use in the Institutional District (I). A neighborhood meeting was held on October 1, 2025. Neighbors in attendance were generally supportive of the proposed development, but had questions/concerns related to traffic, pedestrian access, parking, and storm water drainage. A Plan Commission workshop was held on October 21, 2025. Plan Commission was supportive of the project, but voiced concerns related to traffic during peak pick-up and drop-off times. A Certified Survey Map (CSM) will be used to combine Valley Christian’s three lots into one and will also dedicate a cul-de-sac bulb at the south end of Eichstadt Road for a vehicle Page 1 ITEM 4: GDP – Valley Christian School turnaround. The proposed site will have two driveway accesses off West Fernau Avenue, with a third driveway off of Vinland Street as part of a future phase for access to additional parking. The plan meets setback requirements for all building areas, paved areas, and athletic fields. Code requires a minimum of one parking space per two employees, plus 30% of maximum student enrollment for secondary schools. The plan shows a total of 318 parking stalls for the initial development to meet parking requirements for students and staff. The plan also shows approximately 400 additional parking stalls to the east of the initial parking lot and north of the building. Parking needs for future building expansions will be determined by the number of additional students and staff. Parking requirements will be reviewed as part of the Specific Implementation Plan (SIP) request for each development phase. Requirement Provided Front Setback (Vinland St.) 30 ft. minimum 52 ft. +/- Street Side Setback (E. Fernau Ave.) 25 ft. minimum 34.67 ft. Side Setback (north) 7.5 ft. minimum 30 ft.+/- Side Setback (west) 7.5 ft. minimum 40 ft. +/- Rear Setback (east) 25 ft. minimum 75 ft. +/- Building Height 45 ft. maximum 123.33 ft. Parking spaces 110 spaces 318 spaces (Phase I) Signage: The proposed site plan includes a ground sign along both frontages and the submitted building elevations include wall signage. Signage plans will be addressed during the Specific Implementation Plan (SIP) phases. Page 2 ITEM 4: GDP – Valley Christian School Landscaping: Code requires building foundation, paved area, street frontage, yard and bufferyard landscaping requirements to be met for the proposed site. The applicant has provided a landscaping plan for the initial phase of the development. Landscape Plan Page 3 ITEM 4: GDP – Valley Christian School Building Foundation: A minimum of 40 landscaping points per 100 linear feet of building foundation is required for the building. The landscape plan is meeting the building foundation planting requirement for the initial phase. Paved Area: A minimum of 50 landscaping points per ten parking stalls or 10,000 sq. ft. of paved area is required. The code further specifies 30% of all points will be devoted to tall trees and 40% will be devoted to shrubs. The landscaping plan shows a combination of trees and shrubs around the parking lot to meet the requirement for the initial phase. Street Frontage: Code requires 100 landscaping points per 100 feet of right-of-way. Code further specifies that 50% of the required points shall be devoted to medium trees. The landscaping plan meets this requirement along both street frontages. Code requires street frontage landscaping to be placed so that at maturity, the plant’s drip line will be within 10’ of the public right-of-way. The applicant is requesting a Base Standard Modification (BSM) to allow some of the street frontage landscaping to be placed further than 10’ from the public right-of-way due to drainage features that run along the right-of-way line. Staff is supportive of a BSM to allow the proposed street frontage landscaping placement as it is necessary to accommodate storm water management. Yards: Code requires 20-yard landscaping points per 1,000 sq. ft. of gross floor area. The landscaping plan meets the yard landscaping requirement for the initial development. Bufferyards: Code requires a 0.2 opacity bufferyard for Institutionally zoned properties abutting Single Family Residentially zoned properties. Bufferyard landscaping is not required for the initial phase of development as it exceeds bufferyard setbacks. Bufferyard landscaping may be required for future phases of development due its proximity to the residentially zoned properties. Bufferyard landscaping will be addressed as part of future SIP requests. Storm Water Management: The applicant has been in contact with the Department of Public Works regarding storm water management for the subject area. The final storm water management plans will be approved during the Site Plan Review process. Site Lighting: The applicant has submitted a photometric plan for the initial development phase. The plan utilizes 20 foot tall light poles on three foot tall bases, which is within the maximum light fixture height for the I District. Lighting levels meet the minimum requirement of 0.4 fc for all parking and drive areas and do not exceed the maximum of 0.5 fc at the property lines and 1.0 fc at the public right-of-way. Building Facades: The City’s Exterior Building Design Standards do not apply to new institutional land uses. The applicant has provided building elevations for the initial phase of the school. The elevations include a combination of split-faced CMU, concrete brick, and glazing. Final building elevations will be reviewed as part of the SIP phases. Page 4 ITEM 4: GDP – Valley Christian School Findings: (a) The proposed Planned Development project is consistent with the overall purpose and intent of the Zoning Ordinance as the proposed indoor institutional use of the site will not have a negative impact on the public because it is an appropriate (conditional) use for the I District and is compatible with neighboring residential and vacant land uses. (b) The proposed Planned Development project is consistent with the City’s Comprehensive Plan as the proposed indoor institutional use is consistent with the 2040 Comprehensive Land Use Plan recommendation of Mixed Use. (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts because the indoor institutional use of the property is compatible with neighboring residential and vacant land uses and the proposed plan meets applicable setback and parking requirements. Recommendation/Condition: Staff recommends approval of the General Development Plan with the findings listed above and the proposed following condition: 1. All requested Base Standard Modifications will be addressed as part of the Specific Implementation Plan applications. Page 5 Page 6 Page 7 Page 8 December 19, 2025 GDP-SIP Project Narrative Project: Valley Christian School Vinland Ave/Fernau Ave Oshkosh, WI 54901 Wisconsin Independent Christian Schools dba Valley Christian School is requesting General Development Plan (GDP) and Specific Implementation Plan (SIP) review and approval for a new high school located on the future Fernau Ave extension (Parcel IDs: 91250190000, 91250210000, and 91250200000), just east of Vinland Street. The parcels are proposed to be combined via CSM that is submitted concurrently with project approvals. The property is undeveloped farmland currently. The property is 34.40 acres (after CSM) and is zoned Institutional w/ PUD Overlay. Valley Christian School currently operates three (3) different campuses with two (2) located in Oshkosh and one (1) located in Neenah. The main campus is located at 3450 Vinland Street and is where the high school is located. The new high school is needed to allow enrollment increases of all school ages. The proposed project will include a 1-story, 39,000 square feet facility, associated parking (318 stalls, including 14 handicap accessible stalls) and utilities to serve the campus. A waste enclosure integrated into the building is proposed on the northeast side of the proposed building. Future proposed expansions to the property also include additional building expansion areas, athletic fields and associated improvements, and additional parking. Exterior materials are represented in the attached elevations and will consist single width CMU. The waste enclosure will match the building aesthetics. Landscaping will be provided in an approach that ensures species resiliency and complementary aesthetics while meeting the intent of City code. Base standard modifications are requested along areas of development that are currently buffered by existing vegetation and/or within future expansion areas. The landscaping requested base standard modifications will not negatively affect the project site’s appearance as the west side of the site is visually restricted from the west with existing vegetation. Site lighting will also meet the City ordinance in a fashion that provides appropriate light intensity levels for safety while at the same time limiting light trespass onto adjacent properties. Access to the site will be new access connections the proposed Fernau Ave extension and coordinated with city personnel during construction between the two concurrently constructed projects (City and Valley Christian). The proposed development will drain stormwater southerly to the proposed regional stormwater facility that will be constructed as part of the city improvements. The city’s stormwater management pond will reduce peak flows and treat stormwater to meet local and state requirements. New utility services (water, electric, gas, fiber, sanitary, storm, etc.) are proposed to connect to existing public infrastructure along the public street frontages. Always a Better Plan 100 Camelot Drive | Fond du Lac, WI 54935920.926.9800 | excelengineer.comPage 9 GDP/SIP Narrative Requirements: • Specific themes and images o Valley Christian’s exterior approach was thoughtfully designed to feel like a Christian school with a timeless strategy. The use of masonry and warm gray tones throughout the façade provides a permanent impression. The entrance has been identified by a gable roofed canopy. Signage on the building has been intentionally placed to address traffic along both frontages. • Specific mix of land uses o Proposed land use includes an institutional facility with future outdoor recreational facilities. • Specific nonresidential intensities o The proposed facility will be approximately 39,000 sf. The proposed site will include 11.5% impervious surface and 89.5% landscape/open space upon completion of the first phase and recording of the proposed CSM. The future buildout of the property is expected to remain below a total 60% lot coverage to meet stormwater and city code requirements. • Specific treatment of natural features o The existing property is vacant farmland. A wetland delineation was completed by an assured wetland delineator. The wetland complex located on the property that is being disturbed has been permitted as a wetland exemption by the Wisconsin DNR and was approved on September 13, 2024 (EXE-NE-2024-71-03052). • Specific relationship to nearby properties and public streets o The proposed project will be compatible with the future commercial properties along the Fernau Ave commercial corridor. Residential zoning exists to the north and west of the proposed development. The parking lot is proposed to be located on the southeast side of the site and provide roughly a 250’ buffer to the existing residential properties. The property will have access to the proposed Fernau Ave extension that will be constructed concurrently by the City. • Statistical data on minimum lot sizes in the development, the precise areas of all development lots and pads; density/intensity of various parts of the development; building coverage, and landscaping surface area ratio of all land uses; proposed staging; and any other plans required by Plan Commission. o The project includes only (1) 34.40-acre lot after the proposed CSM is recorded. The phasing of the project includes the construction of the 39,000 square foot building with 318 parking stalls. proposed site will include 11.5% impervious surface and 89.5% landscape/open space upon completion of the first phase and recording of the proposed CSM. Future phasing proposes to outdoor recreational facilities and additional parking. The future buildout of the property is expected to remain below a total 60% lot coverage to meet stormwater and city code requirements. Always a Better Plan 100 Camelot Drive | Fond du Lac, WI 54935920.926.9800 | excelengineer.comPage 10 • General relationship of the project to the Comprehensive Plan or other areas o The City Comprehensive Plan currently delineates the main campus parcel (Parcel ID: 91250210000) as Mixed Use. The northern parcels (Parcel IDs: 91250190000 and 91250200000) that are being combined via CSM are currently listed as Light Density Residential. A comprehensive plan amendment was submitted in November 2025 to change the Light Density Residential to Mixed Use to allow the concurrent rezone and CSM submittals to be completed. Permitting will run concurrently with project approvals. The proposed use is compatible with this use category. • Phasing Schedule o The phasing of the project proposes to begin construction in early 2026 with an anticipated completion date for the fall 2027 school year. Timing of the future phasing is unknown at this time. • A statement of rationale as to why PD zoning is proposed. This statement shall list the standard zoning requirements that, in the applicant’s opinion, would inhibit the development project and the opportunities for community betterment that are available through the proposed PD project. o The proposed development will fit into the proposed commercial corridor. The school has been working with the City on this project the property was annexed into the City with the Institutional w/ PUD Overlay zoning with the complexities constructing a school could have brought. The school will bring new opportunities for Valley Christian and the community to allow other opportunities for education that the public sector may not offer. For this project, PD zoning is requested to allow development to proceed with the following requested exceptions from the Zoning Ordinance. • Proposed exceptions from the requirements of the Zoning Ordinance Info below pulled from different projects o Section 30-175(E) – Maximum Number of Required Off-street Parking Spaces ▪ Parking Exceeds the Maximum • Code requires one (1) per two (2) employees + 30% of max student enrollment. Anticipated for phase 1 is 40 employees and 300 students for a total of 110 parking spaces required. Code allows max 125% of code for a total of 137 stalls allowed. 318 stalls are proposed for school activities, student drivers, and staff. Max lot coverage is 60%. The proposed lot coverage is 11.5%. Landscaping is provided based on the proposed parking lot area. There are no adverse impacts for the additional parking area that is provided in excess of city code. o Section 30-175(M)(5)– Curbing ▪ Curbing around parking area. • Code requires a minimum 6-inch-high curb around all parking areas and internal landscape islands. The project proposed to provide 6-inch high curb in all required areas other than areas along future parking expansion areas (east side of parking lot) & allow the south side curbing Always a Better Plan 100 Camelot Drive | Fond du Lac, WI 54935920.926.9800 | excelengineer.comPage 11 of the parking lot and along the main entrance to be mountable for snow plowing and drainage. o Section 30-253(A) – Figure 30-253d– Building Foundations ▪ Public Right of way entrance landscaping not provided on Vinland Street. • Existing tree/shrub line is proposed to remain along Vinland Street until future expansion / development occurs on the West side of the property. The existing treeline will provide visual buffer to the residential properties on the West side of Vinland Street. The west side of the building is largely future expansion. Landscaping will be provided at time of future expansion along the west side of the building. The request will not negatively affect the project site’s appearance as the west side of the site is visually restricted from the west with existing vegetation. o Section 30-253(C)– Street Frontages ▪ Street Trees not provided along Vinland Street • Existing tree/shrub line is proposed to remain along Vinland Street until future expansion / development occurs on the West side of the property. The existing treeline will provide visual buffer to the residential properties on the West side of Vinland Street. The request will not negatively affect the project site’s appearance as the west side of the site is visually restricted from the west with existing vegetation. Always a Better Plan 100 Camelot Drive | Fond du Lac, WI 54935920.926.9800 | excelengineer.comPage 12 30' BUILDING/PAVEMENT SETBACK 7.5' BUILDING/PAVEMENT SETBACK 30 ' B U I L D I N G / P A V E M E N T S E T B A C K 7.5' BUILDING/PAVEMENT SETBACK 25 ' B U I L D I N G / P A V E M E N T / R E C R E A T I O N A L S E T B A C K 25' RECREATIONAL SETBACK PHASE I SCHOOL 38,530 SF CIVIL F.F.=777.00 ARCH. F.F.=100'-0" NO BELOW GRADE SPACE 30 ' B U I L D I N G / P A V E M E N T S E T B A C K BUS DROP-OFF / PICK-UP ONLY OH D O O R STAKEOUT INFORMATION:VERIFY STATION FOR INLET LOCATION. REFER TO STAKEOUT POLICY FOR STAKEOUT LOCATION AND OFFSETS. MA T C H L I N E A MA T C H L I N E A MA T C H L I N E A MATCHLINE B MATCHLINE B MATCHLINE B ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST FERNAU AVE EXTENSION (BY CITY) LIMITS OF DISTURBANCE (TYP) 30' BUILDING/PAVEMENT SETBACK PROPOSED EICHSTADT ROWDEDICATION. SEE CSM. PROJECT INFORMATION PROFESSIONAL SEAL COLLABORATION SHEET NUMBER JOB NUMBER 2220360 PR O P O S E D N E W H I G H S C H O O L F O R : VA L L E Y C H R I S T I A N S C H O O L FE R N A U A V E N U E ● O S H K O S H , W I SHEET DATES ISSUED FOR APPROVAL C1.1A CIVIL SITE PLAN - OVERALL IFA DEC. 19, 2025 IFA JAN. 15, 2026 60'0 60'120' SCALE: 1"= 60' NORTH FUTURE (TYP) FUTURE BUILDING EXPANSION(TYP) FUTURE (TYP) FUTURE BUILDING EXPANSION(TYP) FUTURE OUTDOOR RECREATIONAL AREA IMPROVEMENTS(TYP) Page 13 INDUSTRIAL AV FREEDOM AV L O G A N D R CHRISTIAN DR EICHSTADT RD FERNAU CT VINLAND ST W FERNAU AV Oshkosh Oshkosh City City Limit Limit Oshkosh City LimitOshkosh City Limit Oshkosh OshkoshCity Limit City Limit Oshkosh City LimitOshkosh City Limit Oshkosh City Limit Oshkosh City Limit Oshkosh City LimitOshkosh City Limit J:\GIS\Planning\Plan Commission Site Plan Map Template\2023 Plan Commission Site Plan Map Template.mxd User: katrinam Prepared by: City of Oshkosh, WI Printing Date: 1/12/2026 1 in = 500 ft1 in = 0.09 mi¯Notice Map City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer Page 14 FREEDOM AV EICHSTADT RD FERNAU CT VINLAND ST FREEDOM AV EICHSTADT RD FERNAU CT W FERNAU AV VINLAND ST Oshkosh City Limit Oshkosh City Limit Oshkosh City LimitOshkosh City Limit HI I I-PD MR-20-PD SR-5 J:\GIS\Planning\Plan Commission Site Plan Map Template\2023 Plan Commission Site Plan Map Template.mxd User: katrinam Prepared by: City of Oshkosh, WI Printing Date: 1/12/2026 1 in = 300 ft1 in = 0.06 mi¯Zoning & Aerial Map City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer Page 15