Loading...
HomeMy WebLinkAboutAGENDApacket__11-11-25_0203_148 OSH KO SH C OMMO N C O UN C I L A GEN DA C O UN C IL C H A MB ER S, C ITY H ALL 215 C H UR C H AVEN UE, RO OM 406 OSH KO SH , W I SC ON SI N No ve m ber 11, 2025 Mission: The City of Oshkosh provides goods and services in pursuit of a safe and vibrant community Vision: A thriving and sustainable community offering abundant opportunities for work and life If anyone requires reasonable ADA accommodations, please contact the office of the City Manager at citymgr@oshkoshwi.gov, or phone 920-236-5002. To send written correspondence to the Council, mail it to the City Manager, place it in the City Hall dropbox, or email it to council@oshkoshwi.gov (prior to the Council meeting). A.CALL TO ORDER (6 :0 0 p.m .) B.ROLL CALL C.INVOCATION - VOTING FIRST Depu ty Mayor Steph en son In v ocation #3 D.PLEDGE OF ALLEGIANCE Fran k lin Elem en tary Sch ool E.PUBLIC STATEMENTS TO COUNCIL Th e pu blic is to address th e Cou n cil on ly. Statem en ts are lim ited to fiv e (5 ) m in u tes. Statem en ts m u st address item s th at: are n ot listed on th e Cou n cil m eetin g agen da; are lim ited to issu es th at h av e an im pact on th e City of O sh k osh an d Com m on Cou n cil m ay address at a fu tu re m eetin g ; an d m u st n ot in clu de en dorsem en ts of an y can didates or oth er election eerin g . Th e Cou n cil can n ot respon d to qu estion s, com m en ts, or rem ark s du rin g th is tim e. It is n ot a discu ssion period, bu t an opportu n ity for you to address th e Cou n cil. F.CONSENT AGENDA ITEMS (Con sen t Ag en da item s are th ose item s of a rou tin e adm in istrativ e n atu re th at are v oted on by th e Cou n cil in a sin gle roll call v ote. Staff recom m en ds approv al of all item s. An y m em ber of th e pu blic or Com m on Cou n cil m ay requ est th at an item be rem ov ed from th e Con sen t Ag en da for discu ssion .) 1.R eport of Bills 2.Septem ber 2 0 2 5 Fin an cial R eport 3.R eceipt an d filin g of claim filed with th e City's in su ran ce com pan y -- Zack ary & Paige Dien er 4.R eceipt an d filin g of claim filed with th e City's in su ran ce com pan y -- Ken Krau se 5.R eceipt an d filin g of claim filed with th e City's in su ran ce com pan y - Jerry Slack Jr. 6.R eceipt an d filin g of claim filed with th e City's in su ran ce com pan y -- Den n is Stron g 7.R eceipt an d filin g of claim filed with th e City's in su ran ce com pan y -- Abby Van s 8.R es 2 5 -5 6 5 Approv e Con dition al Use Perm it requ est for an ou tdoor storag e area at 3 1 1 0 Prog ress Driv e (Plan Com m ission recom m en ds approv al) 9.R es 2 5 -5 6 6 Award bid to Expert Au tom otiv e Serv ices for tow in g/wreck er serv ice for th e Police Departm en t 2 0 2 6 -2 0 2 8 (v ariou s am ou n ts) 10.R es 2 5 -5 6 7 Award Bid to Air O n e Equ ipm en t In c. for SCBA Decon tam in ation Wash er for th e Fire Departm en t ($3 0 ,6 9 5 .0 0 ) 11.R es 2 5 -5 6 8 Approv e Labor Con tract w ith th e O sh k osh Fire Departm en t Ch ief O fficers for Years 2 0 2 4 , 2 0 2 5 an d 2 0 2 6 12.R es 2 5 -5 6 9 Approv e Profession al Serv ices Agreem en t w ith Don oh u e & Associates, In c. for En gin eerin g Serv ices for Wastew ater Treatm en t Plan t Debris Pit R elocation an d Septag e R eceiv in g Im prov em en ts ($2 7 4 ,0 8 0 .0 0 ) 13.R es 2 5 -5 7 0 Approv e Profession al Serv ices Agreem en t w ith Don oh u e & Associates, In c. for En gin eerin g Serv ices for Wash bu rn Water Tow er Vau lt an d Sh orew ood Lift Station Im prov em en ts ($1 1 5 ,7 1 0 .0 0 ) 14.R es 2 5 -5 7 1 Approv e Ch an g e O rder No. 1 for Pu blic Work s Con tract No. 2 4 -0 3 Wastewater Treatm en t Plan t Tertiary Treatm en t Electrical Serv ice Equ ipm en t / Tech Electric Com pan y (+$3 4 ,0 4 7 .0 0 ) 15.R es 2 5 -5 7 2 Approv e Acceptan ce of Waiv er of Special Assessm en t Notices an d Hearin g s for 6 " Storm Sew er Lateral R elatin g to Con tract No. 2 5 -0 9 16.R es 2 5 -5 7 3 Am en d Fin al R esolu tion for Special Assessm en ts for Sidew alk (New an d R eh abilitation ), Driv ew ay Apron s, San itary Sewer Main an d Laterals (New an d R elay), Water Main an d Laterals (New an d R elay), an d Storm Sew er Main an d Laterals (New an d R elay) R elatin g to Con tract 2 5 -0 9 / 5 1 3 West 9 th Av en u e with Sig n ed Waiv er R es 2 5 -5 7 4 Approv e appoin tm en t of altern ate to Tran sportation Com m ittee 17. G.ITEMS REMOVED FROM CONSENT AGENDA H.PENDING ORDINANCES 18.O rd 2 5 -5 7 5 Am en d Section 2 7 A-1 1 of th e O sh k osh Mu n icipal Code pertain in g to park in g reg u lation s on G ran d Street from Merritt Av en u e to Hu dson Av en u e (Tran sportation Com m ittee recom m en ds approv al) I.NEW ORDINANCES 19.O rd 2 5 -5 7 6 Am en d Section 2 7 -6 3 (B) of th e City of O sh k osh Mu n icipal Code to restrict bicycles on sidewalk s or walk w ays wh ere a bu ildin g abu ts th e sidewalk 20.O rd 2 5 -5 7 7 Am en d Section 2 7 -A1 1 of th e City of O sh k osh Mu n icipal Code Pertain in g to Park in g R egu lation s on High Av en u e J.PENDING RESOLUTIONS 21.R es 2 5 -5 7 8 Approv e Determ in ation of Necessity to Acqu ire an d Approv e an d Execu te R elocation O rder for a Storm Sew er Easem en t at 3 8 2 0 Jack son Street (Parcel 9 1 5 2 7 1 9 0 1 0 0 ), 3 8 3 5 Su m m erset Way (Parcel 9 1 5 2 7 3 1 0 0 0 0 ), an d 3 8 4 7 Su m m erset Way (Parcel 9 1 5 2 7 3 2 0 0 0 0 ) 22.Approv e San itary District Ag reem en t with Win n ebago Area San itary District (O ctober 1 , 2 0 2 5 th rou g h Decem ber 3 1 , 2 0 4 5 ) (Win n ebago Area San itary District requ ested th is item be with drawn ) K.NEW RESOLUTIONS 23.R es 2 5 -5 7 9 Adopt th e 2 0 2 6 An n u al Bu dget, m in u s th e G ran d O pera Hou se (0 5 0 1 - 1 0 2 0 ), an d establish th e tax lev y for th e City of O sh k osh 24.R es 2 5 -5 8 0 Adopt th e 2 0 2 6 An n u al Bu dget for th e G ran d O pera Hou se (0 5 0 1 -1 0 2 0 ) 25.R es 2 5 -5 8 1 Approv e fin an cin g for th e 2 0 2 6 Capital Im prov em en t Projects 26.R es 2 5 -5 8 2 Award Bid for Pu blic Work s Con tract No. 2 6 -0 3 to PTS Con tractors, In c. for O h io Street an d West 1 6 th Av en u e R econ stru ction ($7 ,1 6 1 ,2 4 2 .3 5 ) L.COUNCIL DISCUSSION, DIRECTION TO CITY MANAGER & FUTURE AGENDA ITEMS 27.Discussion a nd Direction to City Manag er A.Discu ssion an d direction to staff regardin g th e option s av ailable to address th e storm sewer easem en ts at 3 8 2 0 Jack son Street, 3 8 3 5 Su m m erset Way, an d 3 8 4 7 Su m m erset Way 28.Future Ag end a Items, Meetings, a nd Workshops A.Work sh op - Leag u e of Wiscon sin Mu n icipalities Mu tu al In su ran ce serv ices, Nov em ber 2 5 , 2 0 2 5 (5 :1 5 pm , R oom 4 0 4 ) B.Appoin tm en t to fill Cou n cil v acan cy, Nov em ber 2 5 , 2 0 2 5 (du rin g reg u lar m eetin g at 6 pm ) C.Work sh op - Men om in ee Park train , Jan u ary 1 3 , 2 0 2 6 (5 pm ) M.COUNCIL MEMBER ANNOUNCEMENTS & STATEMENTS N.CITY MANAGER ANNOUNCEMENTS & STATEMENTS 29.City of O sh k osh 2 0 2 5 -2 0 2 6 Strateg ic Plan - 3 Q 2 0 2 5 u pdates 30.Down town plan u pdate 31.Cu rren t in itiativ es O.CLOSED SESSION (R oom 4 0 4 , City Hall): Th e Com m on Cou n cil m ay con v en e in to Closed Session pu rsu an t to Section 1 9 .8 5 (1 )(e) of th e Wiscon sin State Statu tes w h ere com petitiv e barg ain in g reason s requ ire a closed session to discu ss bargain in g option s, strateg y, param eters an d term s related to th e poten tial redev elopm en t an d/or acqu isition of property located at 1 0 1 Com m erce Street an d 2 0 1 Pearl Av en u e in th e City of O sh k osh , com m on ly k n own as City Cen ter. 32.Back g rou n d in form ation for closed session related to City Cen ter P.ADJOURN T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Julie Calmes, Director of Finance D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Report of Bills B a c k g r o u n dBackground Th e item s below are bein g presen ted for approv al by th e O sh k osh Com m on Cou n cil. Th ese item s h av e been properly au dited an d certified by th e City Com ptroller an d are h erew ith su bm itted for you r allow an ce in th e am ou n t of $7 ,5 6 1 ,6 7 1 .1 8 . Bills paid O ctober 2 4 an d 3 1 , 2 0 2 5 $5 ,6 7 2 ,5 4 0 .9 4 Payroll (Miscellan eou s) paid O ctober 2 4 , 2 0 2 5 $4 9 5 .8 7 Payroll paid Nov em ber 7 , 2 0 2 5 $1 ,8 8 8 ,6 3 4 .3 7 A t t a c h m e n t sAttachments 10242025 Check Run 10312025 Check run CHECK NUMBER CHECK DATE VENDOR NAME AMOUNT 14724 10/24/2025 ADVANTAGE POLICE SUPPLY INC 4,134.12 14725 10/24/2025 AIRGAS USA LLC 244.38 14726 10/24/2025 AURORA HEALTH CARE 294.00 14727 10/24/2025 BAKER & TAYLOR BOOKS 73.46 14728 10/24/2025 BROOKS TRACTOR INC 502.79 14729 10/24/2025 CHEMTRADE CHEMICALS US LLC 4,587.70 14730 10/24/2025 CINTAS CORPORATION NO 2 725.25 14731 10/24/2025 CODY RUKAMP 102.99 14732 10/24/2025 CONSTELLATION ENERGY SERVICES 2,661.69 14733 10/24/2025 IMAGE 360 INC 15.50 14734 10/24/2025 DFI SOLUTIONS IN PRINT INC 3,116.09 14735 10/24/2025 EMMONS BUSINESS INTERIORS 1,016.68 14736 10/24/2025 ENERGY SOLUTION PARTNERS LLC 35,880.37 14737 10/24/2025 ENVISIONINK PRINTING SOLUTIONS INC 1,110.45 14738 10/24/2025 CENGAGE LEARNING INC 946.21 14739 10/24/2025 GFL ENVIRONMENTAL 208.20 14740 10/24/2025 GODFREY AND KAHN SC 1,227.00 14741 10/24/2025 GORDON FLESCH COMPANY INC 429.30 14742 10/24/2025 HOLIDAY WHOLESALE 284.02 14743 10/24/2025 JAMES RABE 42.00 14744 10/24/2025 JENNIFER MCCOLLIAN 587.96 14745 10/24/2025 JIM COLLINS 195.05 14746 10/24/2025 LEE BEVERAGE 212.75 14747 10/24/2025 MACQUEEN EQUIPMENT GROUP 780.91 14748 10/24/2025 MCC INC 322.00 14749 10/24/2025 MIDWEST TAPE LLC 239.29 14750 10/24/2025 MILPORT ENTERPRISES INC 8,434.23 14751 10/24/2025 MONROE TRUCK EQUIPMENT 450.12 14752 10/24/2025 NAVIGATE WELLBEING SOLUTIONS 2,166.00 14753 10/24/2025 OSHKOSH CONVENTION AND VISITORS BUREAU INC 100.00 14754 10/24/2025 PACKER CITY SOFT WATER LLC 307.50 14755 10/24/2025 POMP'S TIRE SERVICES INC 5,388.69 14756 10/24/2025 PREMISE HEALTH EMPLOYER SOLUTIONS LLC 56,323.42 14757 10/24/2025 PSYCHOLOGIE CLINIQUE SC 1,300.00 14758 10/24/2025 QUALITY TRUCK CARE CENTER INC 671.72 14759 10/24/2025 RAMAKER & ASSOCIATES INC 2,283.75 14760 10/24/2025 REBECCA GRILL 42.00 14761 10/24/2025 NES ECOLOGICAL SERVICES 39,625.65 14762 10/24/2025 ROGAN'S SHOES 94.99 14763 10/24/2025 UNITED PARCEL SERVICE 132.67 14764 10/24/2025 VENTEK INTERNATIONAL 209.03 14765 10/24/2025 VINTON CONSTRUCTION INC 541,146.77 14766 10/24/2025 WALLY SCHMID EXCAVATING INC 5,400.00 14767 10/24/2025 WISCONSIN CITY COUNTY MANAGEMENT ASSOCIATION 125.00 14768 10/24/2025 WI PUBLIC SERVICE CORP 97,500.51 14769 10/24/2025 WINNEBAGO AREA LITERACY COUNCIL 54.53 14770 10/24/2025 WINNEBAGO COUNTY TREASURER 300.00 14771 10/24/2025 AUGUST WINTER & SONS INC 1,007,617.50 14772 10/24/2025 WOLTER INC 1,122.75 5007249 10/24/2025 4 IMPRINT 3,196.18 5007250 10/24/2025 50 WEST 6TH STREET LLC 8,990.10 5007251 10/24/2025 AARON ROBERTS 37.25 5007252 10/24/2025 ADVANCE CONSTRUCTION INC 573,141.27 5007253 10/24/2025 ALTEC INDUSTRIES INC 1,227.96 5007254 10/24/2025 AMERICAN CONSERVATION & BILLING SOLUTIONS INC 4,161.00 5007255 10/24/2025 AMY ZILLGES 33.00 5007256 10/24/2025 ASCENSION WISCONSIN 345.00 5007257 10/24/2025 AT & T 387.76 5007258 10/24/2025 AT & T 195.00 5007259 10/24/2025 BEEZ ELECTRIC INC 4,339.08 5007260 10/24/2025 BERGSTROM OSHKOSH 6,915.31 5007261 10/24/2025 BETH OSOWSKI 30.00 5007262 10/24/2025 BLACKSTONE AUDIO INC 144.53 5007263 10/24/2025 BOUND TREE MEDICAL LLC 245.86 5007264 10/24/2025 BRANDON C NIELSEN 228.51 5007265 10/24/2025 CENTER POINT LARGE PRINT 480.17 5007266 10/24/2025 IRENE R HORN 516.00 5007267 10/24/2025 MANITOWOC COUNTY TREASURER 9.05 5007268 10/24/2025 CRITERION TRAINING SOLUTIONS LLC 325.00 5007269 10/24/2025 D AND K RENTALS 150.00 5007270 10/24/2025 GOOD TYME MULTIMEDIA 300.00 5007271 10/24/2025 DAVID TENOR CORPORATION 510,659.85 5007272 10/24/2025 DREAMS OF JEANNE LLC 72.00 5007273 10/24/2025 EHLERS 2,712.50 5007274 10/24/2025 EMILLIE CIESLEWICZ 300.89 5007275 10/24/2025 ETHAN MAXSON 197.97 5007276 10/24/2025 FORBES 24.95 5007277 10/24/2025 FOX VALLEY TECH COLLEGE 365.00 5007278 10/24/2025 GALLS LLC 2,669.31 5007279 10/24/2025 GENERAL BEER NORTHEAST INC 2,385.78 5007280 10/24/2025 GERLACH INVESTIGATIONS LLC 120.00 5007281 10/24/2025 GREATAMERICA FINANCIAL SVCS 188.27 5007282 10/24/2025 HEATHER BRICKHAM 37.98 5007283 10/24/2025 HENRY SCHEIN INC 1,533.75 5007284 10/24/2025 IMAGETREND INC 1,885.26 5007285 10/24/2025 INGRAM LIBRARY SERVICES LLC 5,455.70 5007286 10/24/2025 INTOXIMETERS INC 369.50 5007287 10/24/2025 J HIGGINS LTD 8,771.98 5007288 10/24/2025 JACOB M SCHWARTZ 97.70 5007289 10/24/2025 JACYN SAWALL 12.66 5007290 10/24/2025 JASON KONITZER 20.57 5007291 10/24/2025 JEFFREY NAU 411.51 5007292 10/24/2025 JIM KOEPNICK PHOTOGRAPHY LLC 625.00 5007293 10/24/2025 JX ENTERPRISES INC 232.55 5007294 10/24/2025 KIM WALLMULLER 29.32 5007295 10/24/2025 KITZ AND PFEIL INC 98.50 5007296 10/24/2025 KIWANIS CLUB OF OSHKOSH, INC 200.00 5007297 10/24/2025 KLINK HYDRAULICS LLC 343.94 5007298 10/24/2025 KRUEGER INTERNATIONAL INC 5,448.43 5007299 10/24/2025 KYLE ROBERTS 35.22 5007300 10/24/2025 LAWSON PRODUCTS, INC 645.27 5007301 10/24/2025 RELX INC 315.00 5007302 10/24/2025 MARTELLE WATER TREATMENT INC 41,653.92 5007303 10/24/2025 MIND BODY ALIGN LLC 1,900.00 5007304 10/24/2025 MUNICIPAL LAW AND LITIGATION GROUP SC 15,099.00 5007305 10/24/2025 CENTRAL WI AUTO PARTS 483.31 5007306 10/24/2025 ASSURANCE TITLE SERVICES INC 99.60 5007307 10/24/2025 BESSETT 7TH PROPERTY LLC 50.91 5007308 10/24/2025 CARTER MEMORIAL LIBRARY 5.00 5007309 10/24/2025 DANIEL F HICKEY 37.26 5007310 10/24/2025 JACQUELINE R PARISH 115.50 5007311 10/24/2025 KIMBERLY RADTKE 15.00 5007312 10/24/2025 METCALF TAYLOR 124.25 5007313 10/24/2025 PREMIER REAL ESTATE MANAGEMENT LLC 125.29 5007314 10/24/2025 PREMIER REAL ESTATE MANAGEMENT LLC 114.85 5007315 10/24/2025 PREMIER REAL ESTATE MANAGEMENT LLC 52.47 5007316 10/24/2025 QUANDT PLUMBING LLC 30.00 5007317 10/24/2025 REAL PROPERTY MANAGEMENT LAKESHORE 23.58 5007318 10/24/2025 SHERYL FINK 89.00 5007319 10/24/2025 SUNSET POINT SANITARY DISTRICT 60.00 5007320 10/24/2025 TITLE CONSULTANTS INC 79.85 5007321 10/24/2025 VERHALEN INC 2.00 5007322 10/24/2025 WILDFLOWER DEVELOPMENT GROUP LLC 100.00 5007323 10/24/2025 OSHKOSH AREA SCHOOL DISTRICT 4,644.88 5007324 10/24/2025 CITY OF OSHKOSH 1,607.74 5007325 10/24/2025 P F PETTIBONE & CO 343.75 5007326 10/24/2025 PARK 'N PRINT INC 175.00 5007327 10/24/2025 PAUL SCHMIDT 30.00 5007328 10/24/2025 RED POWER DIESEL SERVICE INC 10,296.70 5007329 10/24/2025 RELIANT FIRE APPARATUS INC 187.46 5007330 10/24/2025 RISE LEADERSHIP LLC 5,000.00 5007331 10/24/2025 ROBBIE BAUER 250.00 5007332 10/24/2025 RYAN BUSCHING 123.20 5007333 10/24/2025 SARAH READ 25.96 5007334 10/24/2025 SHARON L TIPTON 150.00 5007335 10/24/2025 STEVE CUMMINGS 30.00 5007336 10/24/2025 THE HOME DEPOT PRO 67.60 5007337 10/24/2025 THOMAS WERBLOW 30.00 5007338 10/24/2025 TIMECLOCK PLUS LLC 5,990.63 5007339 10/24/2025 TITAN PROPERTY MANAGEMENT LLC 1,000.00 5007340 10/24/2025 TKK ELECTRONICS LLC 3,965.87 5007341 10/24/2025 TLB WOOD PRODUCTS LLC 6,540.00 5007342 10/24/2025 TREY JOHNSON 34.85 5007343 10/24/2025 UMS PRINT SOLUTIONS LLC 385.21 5007344 10/24/2025 UNIQUE MANAGEMENT SERVICES 638.60 5007345 10/24/2025 US SIGNAL COMPANY LLC 58.27 5007346 10/24/2025 VERIZON WIRELESS 435.00 5007347 10/24/2025 VON BRIESEN AND ROPER SC 46.20 5007348 10/24/2025 WATERMARK47 INC 1,790.05 5007349 10/24/2025 WINNEFOX LIBRARY SYSTEM 3,070.62 3,089,579.76 CHECK NUMBER CHECK DATE VENDOR NAME AMOUNT 14773 10/31/2025 ADVANTAGE POLICE SUPPLY INC 4,862.52 14774 10/31/2025 AIRGAS USA LLC 6,710.93 14775 10/31/2025 BADGER LAB & ENGINEERNG CO INC 2,436.50 14776 10/31/2025 BELSON CO 472.50 14777 10/31/2025 BROOKS TRACTOR INC 1,739.38 14778 10/31/2025 CHEMTRADE CHEMICALS US LLC 4,560.17 14779 10/31/2025 CINTAS CORPORATION NO 2 693.09 14780 10/31/2025 DIXON ENGINEERING INC 2,050.00 14781 10/31/2025 DORNER INC 373,329.75 14782 10/31/2025 ENVIROTECH EQUIPMENT 813.07 14783 10/31/2025 EVOQUA WATER TECHNOLOGIES LLC 3,501.90 14784 10/31/2025 CENGAGE LEARNING INC 584.78 14785 10/31/2025 GODFREY AND KAHN SC 7,638.40 14786 10/31/2025 GORDON FLESCH COMPANY INC 49.31 14787 10/31/2025 HAROLD CARPENTER AND COMPLETE OVERHEAD 342.50 14788 10/31/2025 JAMES RABE 249.00 14789 10/31/2025 LAKE AND POND SOLUTIONS LLC 287.80 14790 10/31/2025 LINCOLN CONTRACTORS SUPPLY INC 783.99 14791 10/31/2025 MCC INC 29,174.62 14792 10/31/2025 MIDWEST TAPE LLC 386.77 14793 10/31/2025 MONROE TRUCK EQUIPMENT 21,281.14 14794 10/31/2025 NORTHEAST ASPHALT INC 168.00 14795 10/31/2025 NORTHERN LAKE SERVICE INC 1,899.16 14797 10/31/2025 PSYCHOLOGIE CLINIQUE SC 650.00 14798 10/31/2025 QUALITY TRUCK CARE CENTER INC 974.57 14799 10/31/2025 UNITED PARCEL SERVICE 51.45 14800 10/31/2025 VINTON CONSTRUCTION INC 387,667.15 14801 10/31/2025 WI PUBLIC SERVICE CORP 10,822.06 14802 10/31/2025 WINNEBAGO COUNTY TREASURER 76.00 14803 10/31/2025 WINNEBAGO COUNTY TREASURER 128.50 14804 10/31/2025 AUGUST WINTER & SONS INC 4,668.76 14805 10/31/2025 ZOLL MEDICAL CORPORATION 1,960.62 5007350 10/31/2025 NORTHERN METAL AND ROOFING CO 412.00 5007351 10/31/2025 1 N MAIN LLC 375.79 5007352 10/31/2025 AARON DROESSLER 194.11 5007353 10/31/2025 ADVANCE CONSTRUCTION INC 1,416,610.40 5007354 10/31/2025 ALEXANDER CHEMICAL CORPORATION 21,440.04 5007355 10/31/2025 ASSOCIATED APPRAISAL CONSULTANTS INC 12,416.67 5007356 10/31/2025 BEEZ ELECTRIC INC 546.96 5007357 10/31/2025 BERGSTROM CDJR OF OSHKOSH 5,256.73 5007358 10/31/2025 BOUND TREE MEDICAL LLC 152.44 5007359 10/31/2025 BRIAN J BERNIER 4,750.00 5007360 10/31/2025 BRIAN SCHULDES 17.25 5007361 10/31/2025 CRITERION TRAINING SOLUTIONS LLC 325.00 5007362 10/31/2025 DANI HOEPER 146.00 5007363 10/31/2025 DANIEL DEMSKI 619.50 5007364 10/31/2025 DAVIS AND STANTON INC 412.00 5007365 10/31/2025 DEAN M SMITH 220.77 5007366 10/31/2025 DEMCO INC 310.22 5007367 10/31/2025 DTAK LLC 6,600.00 5007368 10/31/2025 FEDERAL EXPRESS CORP 47.51 5007369 10/31/2025 FORENSIC APPRAISAL GROUP LTD 11,056.98 5007370 10/31/2025 FOX CITIES PARTY RENTAL INC 1,625.00 5007371 10/31/2025 GALLS LLC 2,637.45 5007372 10/31/2025 GARTMAN MECHANICAL SERVICES 3,336.11 5007373 10/31/2025 GWIN PEARCE 29.40 5007374 10/31/2025 HASTINGS AIR ENERGY CONTRL INC 1,630.00 5007375 10/31/2025 HEATH FEAVEL 31.64 5007376 10/31/2025 HENRY SCHEIN INC 2,923.48 5007377 10/31/2025 INGRAM LIBRARY SERVICES LLC 3,477.53 5007378 10/31/2025 JACOB J RENNIE 460.38 5007379 10/31/2025 K AND C PEST 255.00 5007380 10/31/2025 KEITH NORKOFSKI 115.00 5007381 10/31/2025 KITZ AND PFEIL INC 71.57 5007382 10/31/2025 KLINK HYDRAULICS LLC 166.80 5007383 10/31/2025 KRUMENAUER CO INC 1,695.00 5007384 10/31/2025 LAWSON PRODUCTS, INC 386.93 5007385 10/31/2025 JERICHO ROAD MINISTRIES INC 2,719.39 5007386 10/31/2025 MATTHEW CHRISTENSEN 53.96 5007387 10/31/2025 MIDWEST ART CONSERVATION CENTER 3,115.00 5007388 10/31/2025 MOUNTAIN BAY SCUBA 402.00 5007389 10/31/2025 MP KELLY PLUMBING BY MIKE GUDDEN LLC 262.45 5007390 10/31/2025 CENTRAL WI AUTO PARTS 216.04 5007391 10/31/2025 NEHER ELECTRIC SUPPLY INC 306.00 5007392 10/31/2025 ANDREA PEDROZA 100.00 5007393 10/31/2025 ASHLEY PATINO ARRIAGA 100.00 5007394 10/31/2025 JAMES STUEBER 12.50 5007395 10/31/2025 KAREN RUIZ BARRERA 100.00 5007396 10/31/2025 KOEPER RACHEL 21.14 5007397 10/31/2025 LESLIE RUBY PATINO ARRIAGA 100.00 5007398 10/31/2025 LIPTOW JESSICA L 87.50 5007399 10/31/2025 NATIONAL MANAGEMENT LLC 7.92 5007400 10/31/2025 OCONNOR JR WALLACE W OR JOANN B 297.67 5007401 10/31/2025 OSHKOSH AREA UNITED WAY 110.00 5007402 10/31/2025 SBA 13,253.66 5007403 10/31/2025 SCHMITT TITLE LLC 112.82 5007404 10/31/2025 SCHMITT TITLE LLC 106.31 5007405 10/31/2025 SCHMITT TITLE LLC 53.43 5007406 10/31/2025 SOUTH PARK TIC GROUP 30.74 5007407 10/31/2025 TASTY THAI 100.00 5007408 10/31/2025 THE WANDERING TABLE 200.00 5007409 10/31/2025 TITAN PROPERTY MANAGEMENT LLC 361.42 5007410 10/31/2025 TRACY JASON 16.73 5007411 10/31/2025 OSHKOSH AREA COMMUNITY FOUNDATION 7,562.75 5007412 10/31/2025 OSHKOSH AREA HUMANE SOCIETY 277.00 5007413 10/31/2025 CITY OF OSHKOSH 775.00 5007414 10/31/2025 CITY OF OSHKOSH 115.00 5007415 10/31/2025 PER MAR SECURITY SERVICES 1,224.00 5007416 10/31/2025 REBECCA KAISER 344.40 5007417 10/31/2025 RED POWER DIESEL SERVICE INC 3,398.97 5007418 10/31/2025 RETTLER CORPORATION 4,425.00 5007419 10/31/2025 SARA RUTKOWSKI 131.10 5007420 10/31/2025 SCHICHTEL'S NURSERY INC 4,139.00 5007421 10/31/2025 SPRING-GREEN LAWN CARE 89.70 5007422 10/31/2025 STERICYCLE INC 252.17 5007423 10/31/2025 STRAVELERS SPORT CENTER 8.95 5007424 10/31/2025 SURE FIRE INC 78,112.00 5007425 10/31/2025 T MOBILE 12,837.83 5007426 10/31/2025 TYLER HUNT 30.00 5007427 10/31/2025 UNIFIDE CST 893.33 5007428 10/31/2025 UNITED STATES ALLIANCE FIRE PROTECTION INC 63,787.00 5007429 10/31/2025 VERIZON WIRELESS 120.03 5007430 10/31/2025 WI DEPT OF ADMIN 950.00 5007431 10/31/2025 WISCONSIN TUBING LLC 151.04 5007432 10/31/2025 WISCONSIN SUPERIOR PAINTING AND COATING LLC 280.00 5007433 10/31/2025 ZILLGES MATERIALS INC 9,044.18 2,582,961.18 D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :September 2025 Financial Report A t t a c h m e n t sAttachments September 2025 Financial Reports Finance Department City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5005 http://www.oshkoshwi.gov November 12, 2025 Honorable Mayor and Members of the Common Council City of Oshkosh, Wisconsin Honorable Mayor and Members of the Common Council, Attached are the Monthly Financial Reports for City for the month of September 2025. Respectfully submitted, Julie Calmes, Finance Director JC/TJ Enc Fund Changes and Amendments Revised Budget Current Year To Date Current Year % of Budget GENERAL FUND $ $ 131,727 55,498,748 $ 34,560,655 62% SENIOR SERVICES REVOLVING FUND - 78,500 48,652 62% CDBG REVOLVING LOAN FUND - 257,000 133,592 52% BUSINESS IMPROVEMENT DISTRICT - 222,110 267,385 120% RECYCLING - 1,221,300 1,221,177 100% GARBAGE COLLECTION & DISPOSAL - 2,060,000 2,079,276 101% POLICE SPECIAL FUNDS - 95,900 506,065 528% STREET LIGHTING FUND - 1,110,600 1,122,061 101% SPECIAL EVENTS - 4,721,956 229,892 5% MUSEUM MEMBERSHIP FUND 38,250 214,350 63,936 30% SENIOR SERVICES - 798,800 641,970 80% FIRE SPECIAL REVENUE 37,337 129,623 110,645 85% AMBULANCE SERVICES 225,500 6,640,200 8,865,758 134% LIBRARY 319,550 5,103,444 4,567,279 89% MUSEUM - 1,343,400 1,132,306 84% MUSEUM COLLECTIONS 3,000 57,500 45,662 79% CEMETERY - 532,900 503,274 94% COMMUNITY DEVEL SPECIAL FUNDS 250,000 250,000 254,821 102% PARKS REVENUE FACILITIES 77,700 478,700 345,120 72% LEACH AMPHITHEATER - 114,500 92,108 80% PUBLIC WORKS SPECIAL FUND (130,000) 750,000 1,184,977 158% POLLOCK WATER PARK - 596,100 525,416 88% RENTAL INSPECTIONS - - 1,142 0% NEIGHBORHOOD IMPROV LOAN PRGRM - - 6,007 0% HEALTHY NEIGHBORHOOD INITIATVE - 85,000 332,273 391% COMMUNITY DEVLP BLOCK GRANT - 801,434 572,026 71% LOCAL GO EDC REV LOAN PROGRAM - 100,000 25,768 26% SENIOR CENTER - - 3,429 0% STREET IMPROVEMENT FUND - - 140,700 0% SPECIAL ASSESSMENT IMPROVEMENT - 3,630,300 2,731,938 75% CONTRACT CONTROL FUND - 28,060,200 287,500 1% ENTERPRISE CAPITAL FUND - 19,391,500 52,000 0% EQUIPMENT FUND 714,000 17,500,250 580,500 3% PARKS IMPROVEMENT - 1,275,000 60 0% PARK SUBDIVISION IMPROVEMENT - 6,000 29,060 484% TREE & BENCH MEMORIAL - 110,000 61,881 56% SPECIAL ASSESSMENT REPLACEMENT - - 3,406,072 0% DEBT SERVICE FUND - 13,650,000 13,999,503 103% GRAND OPERA HOUSE FUND - 170,000 170,015 100% TIF #25 CITY CENTR HOTEL - 156,500 229,281 147% OSHKOSH CONVENTION CENTRE - 2,557,900 1,832,066 72% TIF #26 AVIATION BUS PRK - - (96,135) 0% TIF RESERVE FUND - - 957 0% PARKING RAMP FUND - 120,000 79,158 66% TIF #27 N MAIN IND PARK - 410,000 682,730 167% PARKING UTILITY - 103,900 119,589 115% TIF #28 - BEACH BUILDING REDEV - 53,000 49,307 93% TRANSIT UTILITY - 7,924,836 5,255,672 66% 53,000 7,924,836 120,000 410,000 103,900 2,557,900 - - 13,650,000 170,000 156,500 6,000 110,000 - 19,391,500 16,786,250 1,275,000 - 3,630,300 28,060,200 801,434 100,000 - - - 85,000 114,500 880,000 596,100 532,900 - 401,000 4,783,894 1,343,400 54,500 798,800 92,286 6,414,700 1,110,600 4,721,956 176,100 1,221,300 2,060,000 95,900 78,500 257,000 222,110 City of Oshkosh, WI All Funds Statement of Revenues September 2025 Adopted Budget 55,367,021 $ 75.00% OF THE FISCAL YEAR HAS ELAPSED 11/05/2025 03:51 PAGE: 1 City of Oshkosh, WI All Funds Statement of Revenues September 2025 TIF #29 MORGAN DISTRICT - 19,000 17,922 94% TIF #30 WASHINGTON BUILDING - 55,000 51,212 93% IND PARK LAND ENTERPRISE FUND - 510,000 (36,456) -7% TIF #31 BUCKSTAFF REDEVE - 600,000 405,217 68% TIF #32 GRANARY REDEVELOPMENT - 12,000 12,268 102% TIF #33 LAMICO REDEVELOPMENT - 230,000 220,032 96% TIF #24 OSHKOSH CORP E-COAT - 173,500 238,036 137% TIF #14 MERCY MEDICAL CENTER - 505,000 480,073 95% TIF #15 PARK PLAZA COMMERCE ST - 163,100 310,136 190% TIF #16 100 BLOCK REDEVELOPMNT - 144,600 153,018 106% TIF #19 NW INDUSTRIAL EXPANSN - 274,000 297,015 108% TIF #08 S AVIATION - - 478 0% TIF #17 CITY CENTER REDEVELOP - 231,600 281,572 122% TIF #18 SOUTH WEST INDUSTRIAL - 479,000 554,617 116% TIF #20 SOUTH SHORE REDEVELOP - - 58,715 0% TIF #21 FOX RIVER CORR - 525,000 503,028 96% TIF #12 DIVISION ST - 147,600 156,411 106% TIF #13 MARION RD/PEARL - 315,100 297,108 94% TIF #23 SW IND PARK EXP - 15,000 (73,615) -491% WATER UTILITY 44,200 23,374,200 15,475,317 66% SEWER UTILITY 42,900 21,373,400 16,303,277 76% STORMWATER UTILITY 42,900 16,746,400 12,352,024 74% INSPECTION SERVICES - 1,007,470 1,014,195 101% TIF #34 OSHKOSH CORP HEADQTRS - 1,200,000 1,020,091 85% TIF #35 OSHKOSH AVE CORRIDOR - 590,000 658,110 112% TIF #36 MERGE REDEVELOPMENT - 422,000 395,463 94% TIF #37 AVIATION PLAZA - 167,000 177,604 106% TIF #38 PIONEER REDEVELOPMENT - 11,000 1,392 13% TIF #39 CABRINI SCHOOL REDEV - 44,000 40,485 92% TIF #40 MILES KIMBALL REDEVEL - 30,000 22,473 75% TIF #41 SMITH SCHOOL REDEVELOP - 11,000 10,376 94% TIF #42 MORGAN CROSSING II - 500 30 6% TIF #43 MILL ON MAIN - - (1,619) 0% TIF #44 - NW OSHKOSH EXPANSION - - - 0% HEALTH INSURANCE FUND - 13,225,200 9,282,887 70% WORKERS COMPENSATION - 1,011,700 1,011,700 100% FIELD OPS INTERNAL SERVICE - 6,232,800 4,464,313 72% PROPERTY TAXES - - -0% REDEVELOPMENT AUTHORITY - 156,000 285,564 183% Total $ $ 1,797,064 269,698,322 $ 157,375,716 58%267,901,257 $ - 156,000 13,225,200 1,011,700 6,232,800 500 - - 44,000 30,000 11,000 422,000 167,000 11,000 1,007,470 1,200,000 590,000 23,330,000 21,330,500 16,703,500 147,600 315,100 15,000 479,000 - 525,000 274,000 - 231,600 505,000 163,100 144,600 12,000 230,000 173,500 55,000 510,000 600,000 19,000 75.00% OF THE FISCAL YEAR HAS ELAPSED 11/05/2025 03:51 PAGE: 1 Fund Adopted Budget Current Year Budget Current Year To Date Current Year % of Budget GENERAL FUND $ 55,359,021 $ $ 55,691,786 $ 36,854,545 66% SENIOR SERVICES REVOLVING FUND 58,700 68,028 22,426 33% CDBG REVOLVING LOAN FUND 239,411 239,411 121,889 51% BUSINESS IMPROVEMENT DISTRICT 255,000 255,000 169,546 66% RECYCLING 1,141,524 1,141,778 620,525 54% GARBAGE COLLECTION & DISPOSAL 1,978,990 2,000,652 1,395,882 70% POLICE SPECIAL FUNDS 229,558 462,598 128,847 28% STREET LIGHTING FUND 1,110,600 1,152,986 690,270 60% SPECIAL EVENTS 3,215,633 6,378,536 2,707,231 42% MUSEUM MEMBERSHIP FUND 269,700 307,950 108,303 35% SENIOR SERVICES 797,374 828,417 502,539 61% FIRE SPECIAL REVENUE 38,873 285,262 108,920 38% AMBULANCE SERVICES 6,398,782 6,408,049 3,624,460 57% LIBRARY 4,640,185 4,959,735 3,283,690 66% MUSEUM 1,351,610 1,351,610 872,298 65% MUSEUM COLLECTIONS 65,900 74,055 13,864 19% CEMETERY 561,821 561,821 350,859 62% COMMUNITY DEVEL SPECIAL FUNDS 10,500 260,500 249,500 96% PARKS REVENUE FACILITIES 348,137 475,837 262,861 55% LEACH AMPHITHEATER 111,383 111,383 84,608 76% PUBLIC WORKS SPECIAL FUND 758,456 752,636 949,590 126% POLLOCK WATER PARK 599,195 599,195 414,661 69% RENTAL INSPECTIONS - - - 0% NEIGHBORHOOD IMPROV LOAN PRGRM 218,100 218,100 - 0% HEALTHY NEIGHBORHOOD INITIATVE 628,076 628,076 233,385 37% COMMUNITY DEVLP BLOCK GRANT 2,256,001 3,291,310 716,521 22% LOCAL GO EDC REV LOAN PROGRAM 400,000 400,000 60,000 15% SENIOR CENTER - - - 0% STREET IMPROVEMENT FUND - - - 0% SPECIAL ASSESSMENT IMPROVEMENT 1,307,142 1,307,142 560,986 43% CONTRACT CONTROL FUND 32,582,741 84,278,419 19,513,850 23% ENTERPRISE CAPITAL FUND 86,358,470 162,574,806 4,653,021 3% EQUIPMENT FUND 5,746,294 24,403,158 4,333,613 18% PARKS IMPROVEMENT 4,544,365 6,094,962 293,514 5% PARK SUBDIVISION IMPROVEMENT - - - 0% TREE & BENCH MEMORIAL 154,000 154,000 23,664 15% SPECIAL ASSESSMENT REPLACEMENT - - - 0% DEBT SERVICE FUND 15,200,000 15,200,000 7,431,155 49% GRAND OPERA HOUSE FUND 35,900 36,588 34,454 94% TIF #25 CITY CENTR HOTEL 150 150 115,409 76939% OSHKOSH CONVENTION CENTRE 2,412,762 2,506,361 1,517,307 61% TIF #26 AVIATION BUS PRK 150 150 150 100% TIF RESERVE FUND - - - 0% PARKING RAMP FUND 99,800 99,800 21,388 21% TIF #27 N MAIN IND PARK 100,150 100,150 150 0% PARKING UTILITY 207,447 209,447 53,874 26% - - 2,000 688 - 93,599 - - 1,550,597 - - - - - - 51,695,678 76,216,336 18,656,864 - - 1,035,309 - - 127,700 - (5,820) - - 319,550 - 8,155 - 250,000 3,162,903 38,250 31,043 246,389 9,267 - 254 21,662 233,040 42,386 City of Oshkosh, WI All Funds Statement of Expenditures September 2025 Carry-over Encumbrances and Amendments 332,765 9,328 - 75.00% OF THE FISCAL YEAR HAS ELAPSED 11/05/2025 03:42 PAGE: 1 City of Oshkosh, WI All Funds Statement of Expenditures September 2025 TIF #28 - BEACH BUILDING REDEV 150 150 46,711 31141% TRANSIT UTILITY 15,661,171 16,041,899 4,638,087 29% TIF #29 MORGAN DISTRICT 150 150 150 100% TIF #30 WASHINGTON BUILDING 38,150 38,150 150 0% IND PARK LAND ENTERPRISE FUND 30,700 30,700 4,152 14% TIF #31 BUCKSTAFF REDEVE 570,250 570,250 150 0% TIF #32 GRANARY REDEVELOPMENT 11,150 11,150 150 1% TIF #33 LAMICO REDEVELOPMENT 220,150 395,150 150 0% TIF #24 OSHKOSH CORP E-COAT 150 150 150 100% TIF #14 MERCY MEDICAL CENTER 570,723 646,100 45,616 7% TIF #15 PARK PLAZA COMMERCE ST 300,150 300,150 150 0% TIF #16 100 BLOCK REDEVELOPMNT 100,150 100,150 150 0% TIF #19 NW INDUSTRIAL EXPANSN 75,150 75,150 1,115 1% TIF #08 S AVIATION 10,300 10,300 150 1% TIF #17 CITY CENTER REDEVELOP 347,750 347,750 129,425 37% TIF #18 SOUTH WEST INDUSTRIAL 150 150 150 100% TIF #20 SOUTH SHORE REDEVELOP 4,192,786 4,615,801 37,100 1% TIF #21 FOX RIVER CORR 814,050 814,050 127,209 16% TIF #12 DIVISION ST 150 150 129,473 86315% TIF #13 MARION RD/PEARL 79,450 79,450 1,353 2% TIF #23 SW IND PARK EXP 392,650 392,650 247,103 63% WATER UTILITY 21,505,967 21,770,984 12,132,138 56% SEWER UTILITY 16,772,533 17,017,188 11,231,941 66% STORMWATER UTILITY 9,766,350 9,926,983 6,706,053 68% INSPECTION SERVICES 1,177,034 1,162,034 883,374 76% TIF #34 OSHKOSH CORP HEADQTRS 1,200,150 1,200,150 150 0% TIF #35 OSHKOSH AVE CORRIDOR 178,217 178,217 802,046 450% TIF #36 MERGE REDEVELOPMENT 315,150 315,150 290 0% TIF #37 AVIATION PLAZA 150,150 150,150 150 0% TIF #38 PIONEER REDEVELOPMENT 150 150 150 100% TIF #39 CABRINI SCHOOL REDEV 35,150 35,150 150 0% TIF #40 MILES KIMBALL REDEVEL 27,150 27,150 150 1% TIF #41 SMITH SCHOOL REDEVELOP 10,150 10,150 150 1% TIF #42 MORGAN CROSSING II 150 150 150 100% TIF #43 MILL ON MAIN 400,150 400,150 150 0% TIF #44 - NW OSHKOSH EXPANSION - - 150 0% HEALTH INSURANCE FUND 12,933,789 12,933,789 7,221,707 56% WORKERS COMPENSATION 1,017,237 1,017,237 486,196 48% FIELD OPS INTERNAL SERVICE 7,133,584 7,217,421 4,735,530 66% PROPERTY TAXES - - 66 0% TRUST FUNDS 305,267 305,267 294,933 97% REDEVELOPMENT AUTHORITY 120,360 - 120,360 268,679 223% Total $ 328,256,069 $ $ 484,127,274 $ 143,272,899 30%155,871,205 - 83,837 - - - - - - - - - - 244,655 160,633 (15,000) - - - - - - 265,017 - - - - 423,015 175,000 - 75,378 - - - - - - - - 380,728 75.00% OF THE FISCAL YEAR HAS ELAPSED 11/05/2025 03:42 PAGE: 1 FUND NET CHANGE FUND BALANCE 100 GENERAL FUND 3,495,914.63 (20,626,185.72) 201 SENIOR SERVICES REVOLVING FUND (2,716.79) (230,806.29) 202 CDBG REVOLVING LOAN FUND 13,031.44 (388,856.50) 209 BUSINESS IMPROVEMENT DISTRICT 22,073.08 (270,017.65) 211 RECYCLING 98,337.22 (3,815,551.93) 212 GARBAGE COLLECTION & DISPOSAL 152,111.86 (571,435.80) 215 POLICE SPECIAL FUNDS (6,044.22) (862,649.13) 223 STREET LIGHTING FUND 81,510.57 (728,651.20) 224 SPECIAL EVENTS 86,587.08 1,422,310.31 227 MUSEUM MEMBERSHIP FUND 5,820.64 (663,237.73) 231 SENIOR SERVICES 37,817.56 (165,297.05) 235 FIRE SPECIAL REVENUE (8,315.24) (331,096.64) 237 AMBULANCE SERVICES (127,412.57) (5,241,298.52) 239 LIBRARY 310,592.51 (1,334,995.05) 241 MUSEUM 84,761.07 (423,630.58) 242 MUSEUM COLLECTIONS (5,030.67) (884,401.63) 247 CEMETERY 27,248.11 (548,419.09) 249 COMMUNITY DEVEL SPECIAL FUNDS 249,500.00 (183,431.96) 255 PARKS REVENUE FACILITIES 4,333.14 (835,250.55) 256 LEACH AMPHITHEATER (7,935.49) (121,835.50) 257 PUBLIC WORKS SPECIAL FUND 112,851.36 (29,893.57) 259 POLLOCK WATER PARK 12,637.61 15,004.84 271 RENTAL INSPECTIONS - (46,912.27) 301 NEIGHBORHOOD IMPROV LOAN PRGRM - (296,194.95) 302 HEALTHY NEIGHBORHOOD INITIATVE 21,449.05 (2,569,157.72) 303 COMMUNITY DEVLP BLOCK GRANT - (3,832,500.33) 304 LOCAL GO EDC REV LOAN PROGRAM 60,000.00 (2,039,349.17) 307 SENIOR CENTER - (132,837.62) 311 SIDEWALK CONSTRUCTION FUND - 4,965,560.63 315 STREET IMPROVEMENT FUND - (11,481,710.25) 317 SPECIAL ASSESSMENT IMPROVEMENT (342,915.45) (20,957,449.10) 321 CONTRACT CONTROL FUND 4,515,617.46 15,542,293.71 322 ENTERPRISE CAPITAL FUND 41,928.60 4,501,811.08 323 EQUIPMENT FUND 728,955.13 (8,547,739.44) 325 PARKS IMPROVEMENT 1,353.18 (827,898.66) 327 PARK SUBDIVISION IMPROVEMENT (200.00) (463,268.77) 329 FACILITY IMPROVEMENT FUND - (2,000.00) 333 TREE & BENCH MEMORIAL (580.95) (14,705.98) 335 SPECIAL ASSESSMENT REPLACEMENT (128,074.40) (6,434,720.90) 401 DEBT SERVICE FUND (55,757.19) (8,929,653.79) 501 GRAND OPERA HOUSE FUND 3,169.91 14,422.98 502 TIF #25 CITY CENTR HOTEL - (259,979.21) 503 OSHKOSH CONVENTION CENTRE 193,825.14 (10,832,890.61) 504 TIF #26 AVIATION BUS PRK - 3,876,312.89 City of Oshkosh, WI Change in Fund Balances September 2025 505 TIF RESERVE FUND - (42,711.40) 506 PARKING RAMP FUND (9,000.19) (527,648.60) 508 TIF #27 N MAIN IND PARK - (187,901.44) 509 PARKING UTILITY (9,331.27) (3,055,827.24) 510 TIF #28 BEACH BUILDING REDEV - (62,436.64) 511 TRANSIT UTILITY (705,098.90) (12,440,421.10) 512 TIF #29 MORGAN DISTRICT - (68,249.71) 514 TIF #30 WASHINGTON BUILDING - (124,727.05) 515 IND PARK LAND ENTERPRISE FUND 249.14 (2,856,995.60) 516 TIF #31 BUCKSTAFF REDEVE - (442,077.74) 518 TIF #32 GRANARY REDEVELOPMENT - (19,536.38) 519 TIF #33 LAMICO REDEVELOPMENT - (609,381.31) 520 TIF #24 OSHKOSH CORP ECOAT - (495,536.64) 522 TIF #14 MERCY MEDICAL CENTER - (1,720,287.93) 524 TIF #15 PARK PLAZA COMMERCE ST - (3,694,953.13) 526 TIF #16 100 BLOCK REDEVELOPMNT - (981,216.16) 528 TIF #19 NW INDUSTRIAL EXPANSN - (1,539,084.14) 529 TIF #08 S AVIATION - (25,200.95) 530 TIF #17 CITY CENTER REDEVELOP - (794,334.26) 532 TIF #18 SOUTH WEST INDUSTRIAL - (987,617.46) 533 TIF #10 MAIN & WASH - 0.29 534 TIF #20 SOUTH SHORE REDEVELOP - (2,290,054.26) 535 TIF #11 OSH OFFICE CENTR - (0.08) 536 TIF #21 FOX RIVER CORR - (1,292,191.70) 537 TIF #12 DIVISION ST - (887,086.35) 539 TIF #13 MARION RD/PEARL 8.70 24,767.82 540 TIF #23 SW IND PARK EXP 3,398.84 3,697,597.69 541 WATER UTILITY (589,611.63) (92,480,016.95) 551 SEWER UTILITY (455,489.26) (95,736,595.60) 561 STORMWATER UTILITY (559,582.86) (91,642,277.67) 571 INSPECTION SERVICES (20,659.69) (3,182,414.34) 580 TIF #34 OSHKOSH CORP HEADQTRS - (1,009,138.40) 581 TIF #35 OSHKOSH AVE CORRIDOR 149.45 (2,272,980.57) 582 TIF #36 MERGE REDEVELOPMENT - (459,750.38) 583 TIF #37 AVIATION PLAZA - (242,639.54) 584 TIF #38 PIONEER REDEVELOPMENT - (17,347.49) 585 TIF #39 CABRINI SCHOOL REDEV - (87,007.43) 586 TIF #40 MILES KIMBALL REDEVEL - (11,579.71) 587 TIF #41 SMITH SCHOOL REDEVELOP - 968.45 588 TIF #42 MORGAN CROSSING II - 2,820.97 589 TIF #43 MILL ON MAIN - 67,143.82 590 TIF #44 NW OSHKOSH EXPANSION - 1,150.00 601 HEALTH INSURANCE FUND 44,234.79 (7,927,447.52) 603 WORKERS COMPENSATION 22,975.46 (1,153,030.17) 609 FIELD OPS INTERNAL SERVICE (389,970.19) 2,040,395.53 701 PROPERTY TAXES - 145,876.94 707 TRUST FUNDS (230,698.00) (17,485,766.05) 901 REDEVELOPMENT AUTHORITY (10,323.50) (8,342,261.31) CASH ON HAND FOR THE MONTH ENDED SEPTEMBER 30, 2025 Beginning Balance Period Change Ending Balance OPERATING CASH TREASURY CASH - OPERATIONS 131,486,563.66 (5,424,931.32) 126,061,632.34 0707 - TRUST FUNDS 80501 - CEMETERY TRUST 28,010.10 891.50 28,901.60 80615 - OPL MEMORIALS 1,491.88 176.36 1,668.24 80649 - OPL-W POINTE BANK-CHECKING 58,041.37 58,041.37 80801 - FISK-GALLUP TRUST 43,110.20 139.28 43,249.48 TRUST AND INVESTMENTS TREASURY CASH - OPERATIONS 32,785,958.92 124,216.41 32,910,175.33 0227 - MUSEUM MEMBERSHIP FUND 106,805.43 373.16 107,178.59 0242 - MUSEUM COLLECTIONS 861,973.35 5,030.67 867,004.02 0541 - WATER UTILITY 1,312,240.79 4,584.79 1,316,825.58 0551 - SEWER UTILITY 2,327,174.64 23,111.07 2,350,285.71 0561 - STORMWATER UTILITY 615.70 2.15 617.85 0707 - TRUST FUNDS 80501 - CEMETERY TRUST 1,267,269.18 15,315.92 1,282,585.10 80502 - HARVEY C CLUTE TRUST 77.53 0.27 77.80 80503 - HEYMAN TRUST 41,250.35 168.51 41,418.86 80504 - ROBERT J HUME TRUST 1,527.78 5.33 1,533.11 80505 - AMBER H MAXWELL TRUST 8,520.62 40.91 8,561.53 80506 - JOHN FRANCIS ROBERTS TRUST 2,831.20 9.88 2,841.08 80507 - LOUISE SARAU TRUST 6,164.81 21.52 6,186.33 80601 - OPLCIF HOXTEL (OACF) 31,188.55 544.89 31,733.44 80605 - OPLCIF ARCHER (OACF) 3,113.84 54.41 3,168.25 80607 - OPLCIF A GRUENWALD (OACF) 4,711.19 82.31 4,793.50 80609 - OPLCIF G HILTON (OACF) 19,921.03 348.04 20,269.07 80612 - OPLCIF E W KELSH (OACF) 4,719.90 82.47 4,802.37 80613 - OPLCIF G KENNY (OACF) 16,409.09 286.69 16,695.78 80618 - OPLCIF SCHUSTER BOOKS (OACF) 288,142.64 5,033.90 293,176.54 80627 - OPLCIF S ZELLMER (OACF) 150,529.03 2,629.78 153,158.81 80628 - JOHN HICKS TRUST FUND 202,845.49 661.42 203,506.91 80629 - LIBRARY DEV & SUPPORT (OACF) 884,229.91 15,993.29 900,223.20 City of Oshkosh, WI Cash and Investment Report For the Month Ended September 30, 2025 Beginning Balance Period Change Ending Balance 80630 - LIBRARY FACILITY IMPROVEMENT (OACF)2,104,860.00 36,772.44 2,141,632.44 80631 - LIBRARY PROGRAMMING SUPPORT (OACF)1,378,976.08 24,091.08 1,403,067.16 80632 - LIBRARY TECHNOLOGY (OACF) 1,412,312.95 24,673.46 1,436,986.41 80633 - LIBRARY COLLECTION IMPRVMT (OACF) 1,455,943.07 25,637.43 1,481,580.50 80634 - PRO SUPP FUND - MARY MALNAR (OACF) 34,270.77 598.72 34,869.49 80635 - LIBRARY TECH FUND - AV TRUST (OACF) 44,511.93 777.64 45,289.57 80636 - LIBRARY TECH - JOHN NICHOLS (OACF) 57,224.00 999.72 58,223.72 80637 - OPLCIF-G JACKSON (OACF) 2,802.52 48.95 2,851.47 80638 - OPLCIF-W STEIGER (OACF) 18,502.10 323.24 18,825.34 80640 - RON METZ CENTENNIAL FUND (OACF) 42,266.20 718.67 42,984.87 80642 - GEORGE HILTON LIBRARY & MUSEUM TRST 4,489.40 95.77 4,585.17 80643 - G HILTON SPECIAL (OACF) 1,047.93 22.28 1,070.21 80644 - FRANK & ANNA ROJAHN TRUST 11,546.84 598.95 12,145.79 80645 - MARGUERITE E ZELLMER TRUST 12,519.74 265.15 12,784.89 80646 - 0ACF CONVENTION CENTER MAINT FUND 331,370.50 5,634.55 337,005.05 80647 - POLICE DEPT FUND (OACF) 788,691.50 13,612.43 802,303.93 80648 - OPL - BRUCE L DECKER FAC IMP (OACF) 545,621.58 9,532.14 555,153.72 80650 - ABBEY S HARRIS TRUST 1,856.20 39.47 1,895.67 80651 - OPL-CIF-RASMUSSEN (OACF) 61,730.40 1,078.45 62,808.85 80652 - OPL-CIF-ROJAHN 5,092.86 88.99 5,181.85 80701 - ETHEL J BEHNCKE MUSEUM TRUST 169,773.37 592.69 170,366.06 80702 - WILLIAM E BRAY MUSEUM TRUST 12,481.67 86.93 12,568.60 80703 - FREDERICK S & MARION H DUROW TRUST 3,233,458.55 9,735.41 3,243,193.96 80704 - LONA & EDWARD G KITZ TRUST 107,382.87 6,485.05 113,867.92 80705 - RICHARD KITZ DIRECTORS TRUST 175,810.83 613.77 176,424.60 80706 - MUSEUM ENDOWMENT TRUST 494,122.32 7,610.69 501,733.01 80707 - R KITZ BEQUEST 258,130.19 2,573.37 260,703.56 80709 - MUSEUM CAPITAL CAMPAIGN FUND (OACF)711,317.04 12,095.11 723,412.15 80801 - FISK-GALLUP TRUST 5,842.14 20.40 5,862.54 80802 - EMMA J GOULD TRUST 4,577.74 15.98 4,593.72 80803 - SOPHIE L HUHN TRUST 5,297.96 18.50 5,316.46 80804 - JULIA L STANHILBER LIB & PKS TRUST 767,552.63 (603,952.63) 163,600.00 80805 - JULIA L STANHILBER PARKS TRUST 1,505.19 5.26 1,510.45 80806 - STANHILBER LIBRARY TRUST (NICOLET) - 386,551.11 386,551.11 80807 - STANHILBER TRUST - PARKS - 219,509.96 219,509.96 80903 - FIRE DEPT FUND (OACF) 25,791.53 640.19 26,431.72 INVESTMENTS-DEPRECIATION FUND 0541 - WATER UTILITY 169,312.63 1,681.44 170,994.07 INVESTMENTS-REVENUE BOND RESERVE 0541 - WATER UTILITY 5,501,234.02 30,064.49 5,531,298.51 0551 - SEWER UTILITY 6,173,010.82 23,857.51 6,196,868.33 0561 - STORMWATER UTILITY 8,643,840.62 27,064.37 8,670,904.99 S U B J E C T :S U B J E C T :Receipt and filing of claim filed with the City's insurance company -- Zackary & Paige Diener D A T E :D A T E :November 11, 2025 C l a i m I n f o r m a t i o nClaim I n f o r m a t i o n Claim an t: Zack ary & Paige Dien er Date of Loss: 1 0 .2 1 .2 0 2 5 Su m m ary of Claim : Alleged dam age to th eir v eh icle from u n m ark ed road con stru ction . S U B J E C T :S U B J E C T :Receipt and filing of claim filed with the City's insurance company -- Ken Krause D A T E :D A T E :November 11, 2025 C l a i m I n f o r m a t i o nClaim I n f o r m a t i o n Claim an t: Ken Krau se Date of Loss: 1 0 .2 5 .2 0 2 5 Su m m ary of Claim : Alleg ed h is v eh icle's driv er-side m irror was dam ag ed by a police officer. S U B J E C T :S U B J E C T :Receipt and filing of claim filed with the City's insurance company - Jerry Slack Jr. D A T E :D A T E :November 11, 2025 C l a i m I n f o r m a t i o nClaim I n f o r m a t i o n Claim an t: Jerry Slack Jr. Date of Loss: 2 .1 9 .2 0 2 4 Su m m ary of Claim : Alleged illeg al arrest S U B J E C T :S U B J E C T :Receipt and filing of claim filed with the City's insurance company -- Dennis Strong D A T E :D A T E :November 11, 2025 C l a i m I n f o r m a t i o nClaim I n f o r m a t i o n Claim an t: Den n is Stron g Date of Loss: 1 0 .1 5 .2 0 2 5 Su m m ary of Claim : Alleged receiv in g an u n lawfu l citation cau sin g em otion al distress. S U B J E C T :S U B J E C T :Receipt and filing of claim filed with the City's insurance company -- Abby Vans D A T E :D A T E :November 11, 2025 C l a i m I n f o r m a t i o nClaim I n f o r m a t i o n Claim an t: Abby Van s Date of Loss: 1 0 .2 0 .2 0 2 5 Su m m ary of Claim : Alleged dam age to h er v eh icle from an u n secu red m an h ole cov er. T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Kimberly Gierach, Deputy Community Development Director D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Res 25-565 Approve Conditional Use Permit request for an outdoor storage area at 3110 Progress Drive (Plan Commission recommends approval) B A C K G R O U N DBACKGROUND Th e su bject site con sists of a 7 .1 3 -acre parcel at th e sou th east corn er of West Fern au Av en u e an d Progress Driv e. Th e site h as an approxim ately 6 7 ,0 0 0 sq. ft. in du strial produ ction facility (Av ail Switch g ear) an d associated park in g an d loadin g areas. Th e 2 0 4 0 Com preh en siv e Lan d Use Plan recom m en ds In du strial u se for th e site. Th e site is su rrou n ded by in du strial u ses an d v acan t lan d, alon g with a Win n ebago Cou n ty Waste Man agem en t site to th e n orth . A N A L Y S I SANALYSIS Th e applican t h as su bm itted plan s for n ew pav em en t on th e su bject site, wh ich in clu des an approxim ate 4 ,0 0 0 sq. ft. con crete pad to be u sed for ou tdoor storage on th e sou th en d of th e existin g park in g lot. O u tdoor storag e areas exceedin g 5 0 0 sq. ft. are a con dition al u se in th e Heav y In du strial District. Accordin g to th e applican t, th e proposed storage area will be u sed for th e largest tru ck deliv eries w h ich m ay n eed to be stored ou tside for sev eral days. Th e item s to be stored in th is area will be larg e electrical assem blies th at are waitin g to be sh ipped ou t. Staff is su pportiv e of th e proposed ou tdoor storag e area as th e u se w ill be com patible with su rrou n din g in du strial lan d u ses. Th e u se is also com patible with th e zon in g of th e su rrou n din g area, w h ich is prim arily zon ed Heav y In du strial District. F I S C A L I M P A C TFISCAL I M P A C T Approv al of th is m ay resu lt in an in crease in th e assessed property v alu e for th e site. Th e applican t is an ticipatin g spen din g approxim ately $5 0 ,0 0 0 on th e proposed project. R E C O M M E N D A T I O NRECOMMENDATION Th e Plan Com m ission recom m en ded approv al of th e requ ested con dition al u se perm it on Nov em ber 4 , 2 0 2 5 . Please see th e attach ed staff report for m ore in form ation . A t t a c h m e n t sAttachments Res 25-565 CUP - 3110 Progress Dr 11/11/2025 25-565 RESOLUTION                  PURPOSE: APPROVE CONDITIONAL USE PERMIT REQUEST FOR AN OUTDOOR STORAGE AREA AT 3110 PROGRESS DRIVE INITIATED BY : RICHARD PERSCHON   PLAN COMMISSION RECOMMENDATION:  Approved w/ findings         WHEREAS, the Plan Commission finds that the conditional use permit request for an outdoor storage area at 3110 Progress Drive, is consistent with the criteria established in Sections 30-62(C) and 30-382 of the Oshkosh Zoning Ordinance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that a conditional use permit request for an outdoor storage area at 3110 Progress Drive, per the attached, is hereby approved, with the following findings: Is in harmony with the Comprehensive Plan because the outdoor storage use is compatible with the 2040 Comprehensive Land Use Plan recommendation of Industrial. 1. Would not result in a substantial or undue adverse impact on nearby property, the character of the neighborhood, environmental factors, traffic factors, parking, public improvements, public property or rights-of-way, or other matters affecting the public health, safety, or general welfare as the outdoor storage area is surrounded by industrial-zoned properties and industrial land uses. 2. Maintains the desired consistency of land uses, land use intensities, and land use impacts as related to the environs of the subject property as the outdoor storage use is compatible with neighboring industrial land uses. 3. The conditional use is located in an area that will be adequately served by, and will not impose an undue burden on any of the improvements, facilities, utilities or services provided by public or private agencies serving the subject property as existing infrastructure is in place for access to the outdoor storage area. 4. The potential public benefits outweigh any potential adverse impacts of the proposed conditional use because the outdoor storage use is compliant with HI District zoning requirements and will benefit the industrial user of the property by providing needed outdoor storage area for shipping purposes. 5.   ITEM: Public Hearing: Conditional Use Permit Request For An Outdoor Storage Area At 3110 Progress Drive Plan Commission Meeting of November 4, 2025 Applicant: Richard Perschon Property Owner: Avail Switchgear Systems Action Requested: The applicant is requesting a Conditional Use Permit for an outdoor storage area. Applicable Ordinance: Outdoor Storage land uses are permitted only through a Conditional Use Permit (CUP) in the Heavy Industrial (HI) Zoning District as regulated in Section 30-62 (C) of the Zoning Ordinance. Criteria used for Conditional Use Permits are located in Section 30-382 of the Zoning Ordinance. Property Location and Background Information: The subject site consists of a 7.13-acre parcel at the southeast corner of West Fernau Avenue and Progress Drive. The site has an approximately 67,000 sq. ft. industrial production facility (Avail Switchgear) and associated parking and loading areas. The 2040 Comprehensive Land Use Plan recommends Industrial use for the site. The site is surrounded by industrial uses and vacant land, along with a Winnebago County Waste Management site to the north. Adjacent Land Use and Zoning: Existing Uses Zoning North Landfill I South Vacant HI West Industrial HI East Vacant HI Comprehensive Plan Land Use Recommendation Land Use 2040 Comprehensive Land Use Plan Recommendation Industrial The applicant has submitted plans for new pavement on the subject site, which includes an approximate 4,000 sq. ft. concrete pad to be used for outdoor storage on the south end of the existing parking lot. Outdoor storage areas exceeding 500 sq. ft. are a conditional use in the HI District. According to the applicant, the proposed storage area will be used for the largest truck deliveries which may need to be stored outside for several days. The items to be stored in this area will be large electrical assemblies that are waiting to be shipped out. Staff is supportive of the proposed personal storage facility as the use will be compatible with surrounding industrial land uses. The use is also compatible with the zoning of the surrounding area, which is primarily zoned HI. Code requires outdoor storage areas to be screened from non-industrialized areas with minimum 8’ tall solid walls or fencing. The applicant is proposing 8’ tall slatted chain link fencing along the west side of the storage area to screen it from the public right-of-way Item 2 – CUP: Outdoor Storage – 3110 Progress Dr. (Progress Drive). To meet the solid screening requirement, the chain link fencing must have pre- woven or interwoven slatting to achieve a minimum of 90% opacity. This will be verified during Site Plan Review. Two parking spaces are needed to meet the parking requirement of one space per 2,000 sq. ft. of gross floor area for outdoor storage uses. The applicant is proposing sixteen new parking spaces on the north side of the site that will meet this requirement. The additional pavement on-site will result in an impervious surface ratio of 49.6%, which is under the maximum of 70% for the HI District. Findings: In its review and recommendation to the Common Council on an application for a Conditional Use Permit, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-382 (F)(3): (1) Is in harmony with the Comprehensive Plan because the outdoor storage use is compatible with the 2040 Comprehensive Land Use Plan recommendation of Industrial. (2) Would not result in a substantial or undue adverse impact on nearby property, the character of the neighborhood, environmental factors, traffic factors, parking, public improvements, public property or rights-of-way, or other matters affecting the public health, safety, or general welfare as the outdoor storage area is surrounded by industrial-zoned properties and industrial land uses. (3) Maintains the desired consistency of land uses, land use intensities, and land use impacts as related to the environs of the subject property as the outdoor storage use is compatible with neighboring industrial land uses. (4) The conditional use is located in an area that will be adequately served by, and will not impose an undue burden on any of the improvements, facilities, utilities or services provided by public or private agencies serving the subject property as existing infrastructure is in place for access to the outdoor storage area. (5) The potential public benefits outweigh any potential adverse impacts of the proposed conditional use because the outdoor storage use is compliant with HI District zoning requirements and will benefit the industrial user of the property by providing needed outdoor storage area for shipping purposes. Recommendation/Conditions: Staff recommends approval of the proposed Conditional Use Permit for an outdoor storage area at 3110 Progress Drive as proposed with the findings listed above. The Plan Commission recommended approval of the Conditonal Use Permit Plan on November 4, 2025. For a comprehensive record of the proceedings, the official minutes can be obtained by contacting Planning Services. Item 2 – CUP: Outdoor Storage – 3110 Progress Dr. Page 4 Page 5 Page 6 Page 7 N89°13'29"E 434.73' LOT 1 - - - - - C.S.M. - - - - - - NO. 59 0 7 - - - - - - - - S0 0 ° 0 3 ' 3 6 " W 64 4 . 4 0 ' S89°05'03"W 484.00' N0 0 ° 0 3 ' 3 6 " E 59 5 . 5 8 ' C1 C1.1 DRAWING NO. NO . DA T E DR A W N B Y CH E C K E D AP P R O V E D COMPUTER FILE SCALE DATE Ma r t e n s o n & E i s e l e , I n c . Pl a n n i n g En v i r o n m e n t a l Su r v e y i n g En g i n e e r i n g Ar c h i t e c t u r e 13 7 7 M i d w a y R o a d Me n a s h a , W I 5 4 9 5 2 92 0 . 7 3 1 . 0 3 8 1 1 . 8 0 0 . 2 3 6 . 0 3 8 1 ww w . m a r t e n s o n - e i s e l e . c o m in f o @ m a r t e n s o n - e i s e l e . c o m FI E L D W O R K RE F E R T O C O V E R S H E E T F O R R E V I S I O N D E S C R I P T I O N S ** ** NO . DA T E NO . DA T E 1-1991-001de.dwg BAR SCALE 03/11/2025 RP P JJ R JJ R 1 5/ 2 / 2 0 2 5 2 8/ 2 0 / 2 0 2 5 3 9/ 1 2 / 2 0 2 5 9/ 2 4 / 2 0 2 5 LEGAL DESCRIPTION SITE/PROJECT INFORMATION OWNER/APPLICANT: ENGINEER: ZONING DATA SITE DATA NRCS SOILS PARKING CALCULATIONS SITE PLAN SI T E P L A N AV A I L S W I T C H G E A R S Y S T E M S PA V E M E N T U P G R A D E S Page 8 I N D U S T R I A LAV F REE DO M AV M IN ERVA ST CLO VER ST FERNAU CT VINLAND STW F E R N A U AV Osh ko sh Cit y Li mit Osh ko sh Cit y Li mit Oshkosh City Limit Oshkosh City Limit O sh k o s h Ci t y Li mi tOshkosh Ci t y Li mi tOshkosh Ci t y Li mi tOshkosh Ci t y Li mi t J:\GIS\Planning\Plan Commission Site Plan Map Template\2023 Plan Commission Site Plan Map Template.mxd User: katrinam Prepared by: City of Oshkosh, WI Printing Date: 10/9/2025 1 in = 500 ft 1 in = 0.09 mi¯3110 PROGRESS DR.NOTICE MAP City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer Page 9 FERNAU CT VINLAND ST W F E R N A U AV FERNAU CT PROGRESS DR VIN LA N D S T W F E R N A U A V Osh ko sh Osh ko sh City City Lim it Lim it Oshkosh City Oshkosh City Limit Limit O sh k o s h C i t y Li mi tOshkosh C i t y Li mi t O s h k o s h C i t y L i m i t O s h k o s h C i t y L i m i t DR-6 HI HI I I MR-12-PDSR-5 J:\GIS\Planning\Plan Commission Site Plan Map Template\2023 Plan Commission Site Plan Map Template.mxd User: katrinam Prepared by: City of Oshkosh, WI Printing Date: 10/9/2025 1 in = 400 ft 1 in = 0.08 mi¯3110 PROGRESS DR.ZONING & AERIAL MAP City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer Page 10 T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Jon Urben, General Services Manager D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Res 25-566 Award bid to Expert Automotive Services for towing/wrecker service for the Police Department 2026-2028 (various amounts) B A C K G R O U N DBACKGROUND Th e O sh k osh Police Departm en t u ses qu alified con tractors for towin g serv ices to com ply w ith th e City of O sh k osh Tow in g O rdin an ce 2 7 -1 8 , for towin g of police v eh icles as w ell as for im pou n din g v eh icles; an d an y oth er tow in g serv ices as requ ested by th e Police Departm en t. Wh ile th e an n u al Police Departm en t costs for th ese serv ices are relativ ely m in or (e.g.- $2 ,3 0 0 for 2 0 2 4 ), th e poten tial costs for th e pu blic to access im pou n ded v eh icles u n der th is con tract cou ld exceed $2 5 ,0 0 0 ov er th e th ree-year con tract term . As su ch , staff h as h ad th is con tract approv ed by th e Cou n cil to be in con cert w ith Pu rch asin g O rdin an ce Section 1 2 -1 0 (A) of th e Mu n icipal Code. Th is con tract will be for a th ree-year term beg in n in g in 2 0 2 6 w ith th e option for two, on e-year ren ewals u pon m u tu al ag reem en t. A N A L Y S I SANALYSIS Work in g w ith Police Departm en t staff, Pu rch asin g prepared specification s seek in g v en dors for th ese serv ices. Th is solicitation was sen t to k n own tow in g con tractors. Bids were du e on O ctober 2 8 , 2 0 2 5 . Th e bid tab is attach ed. Staff h as con firm ed th e sole bid from Expert Au tom otiv e Serv ices m et all th e m in im u m bid specification s. Expert w as aw arded th is con tract for th e prior bid term an d staff are pleased with th eir perform an ce. F I S C A L I M P A C TFISCAL I M P A C T An n u al ch arg es for th ese serv ices to th e Police Departm en t bu dget w ill v ary. Ch arges will be lock ed to th e prices on th e attach ed bid tab for th e th ree-year con tract term . Th ey will be ch arg ed to 1 0 0 -0 2 1 1 -6 4 1 7 -0 0 0 0 0 (G en eral Fu n d/Misc. Con tractu al Serv ices). R E C O M M E N D A T I O NRECOMMENDATION Pen din g Com m on Cou n cil approv al of th e 2 0 2 6 Police Departm en t operatin g bu dget, Pu rch asin g recom m en ds th e Com m on Cou n cil aw ard th is con tract to Expert Au tom otiv e Serv ices for th e prices n oted on th e attach ed bid tab. A t t a c h m e n t sAttachments Res 25-566 Bid Tab Towing Services PD 11-11-25 11/11/2025 25-566 RESOLUTION                  PURPOSE: AWARD BID TO EXPERT AUTOMOTIVE SERVICES FOR TOWING SERVICES FOR POLICE DEPARTMENT (VARIOUS AMOUNTS)   INITIATED BY : GENERAL SERVICES DIVISION         WHEREAS, the City of Oshkosh has heretofore advertised for bids for towing services for the Police Department for a three-year term; and     WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid for this project:                      EXPERT AUTOMOTIVE SERVICES                      910 W. MURDOCK AVENUE                      OSHKOSH, WI 54901                                                                           Total Bid:  Various Amounts- See Bid Tab   NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of the same, all according to plans, specifications, and bid on file.  Money for this purpose is hereby appropriated from: Acct. No.            100-0211-6417-00000 (General Fund/Misc. Contractual Services)     Mon - Fri Mon - Fri Weekends & Holidays Special Equipment Other Charges 7 am - 7 pm 7 pm - 7 am Street Tow 1 Street Tow 1 Street Tow 1 Equipment and charge Hauling Impound Vehicles VENDOR INFORMATION Off - The Road Tow 2 Off - The Road Tow 2 Off - The Road Tow 2 from Outside the City Winching 3 Winching 3 Winching 3 per mile Expert Automotive Services $45.00 1 $95.00 1 $125.00 1 Dollies $75.00 910 W Murdock Ave $95.00 2 $125.00 2 $125.00 2 Clean up $125.00 $2.25/mile Oshkosh WI 54901 $95.00 3 $125.00 3 $125.00 3 Oil dry abosrbant $25.00 Scale fee $75.00 CHARGES FOR SERVICES TOWING/WRECKER SERVICE - 2026 - 2028 CITY OF OSHKOSH POLICE DEPARTMENT BIDS OPENED OCTOBER 28, 2025 CITY OF OSHKOSH T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Jon Urben, General Services Manager D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Res 25-567 Award Bid to Air One Equipment Inc. for SCBA Decontamination Washer for the Fire Department ($30,695.00) B A C K G R O U N DBACKGROUND Th e O sh k osh Fire Departm en t's Self-Con tain ed Breath in g Apparatu s (SCBA) equ ipm en t is a v ital com pon en t of th eir operation s, desig n ed to protect th e respiratory system of firefigh ters du rin g em ergen cy situ ation s w h ere air qu ality is com prom ised. Cu rren tly, th e Fire Departm en t's m an u al process for clean in g an d m ain tain in g SCBA equ ipm en t is ou tdated an d labor- in ten siv e. In v estin g in a SCBA w ash er cabin et w ill clean SCBA equ ipm en t an d protectiv e gear of residu e from com bu stion gases, soot particles an d oth er toxin s in m in u tes. A SCBA wash er w ill redu ce staff tim e requ ired to clean SCBA equ ipm en t, redu ce fu tu re costs associated w ith equ ipm en t replacem en t an d m in im ize h ealth -related issu es. A N A L Y S I SANALYSIS Work in g w ith Fire Departm en t staff, Pu rch asin g prepared specification s seek in g v en dors for th ese serv ices. Th is solicitation was sen t to k n own SCBA w ash er v en dors. Bids were du e on O ctober 1 6 , 2 0 2 5 . Th e bid tab is attach ed. Staff h as con firm ed th e sole bid from Air O n e Equ ipm en t In c. m et all th e m in im u m bid specification s. F I S C A L I M P A C TFISCAL I M P A C T Th is pu rch ase w ill be ch arged to A/N# 1 0 0 -0 2 3 0 -7 2 0 4 -0 0 0 0 0 (Fire Mach in ery & Equ ipm en t). R E C O M M E N D A T I O NRECOMMENDATION Pu rch asin g recom m en ds th e Com m on Cou n cil aw ard th is con tract to Air O n e Equ ipm en t In c. for $3 0 ,6 9 5 .0 0 . A t t a c h m e n t sAttachments Res 25-567 Bid Tab SCBA Decon Washer OFD 11-11-25 11/11/2025 25-567 RESOLUTION                  PURPOSE: AWARD BID TO AIR ONE EQUIPMENT INC. FOR SCBA DECON WASHER FOR FIRE DEPARTMENT ($30,695.00) INITIATED BY : GENERAL SERVICES DIVISION         WHEREAS, the City of Oshkosh has heretofore advertised for bids for a Self-Contained Breathing Apparatus (SCBA) Decontamination Washer; and       WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid for this unit:                      AIR ONE EQUIPMENT INC.                      360 PRODUCTION DRIVE                      SOUTH ELGIN, IL 60177                                                                           Total Bid:  $30,695.00   NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of the same, all according to plans, specifications, and bid on file.  Money for this purpose is hereby appropriated from: Acct. No.            100-0230-7204-00000 (Fire Machinery & Equipment)     T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Michelle Behnke, Human Resources Manager D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Res 25-568 Approve Labor Contract with the Oshkosh Fire Department Chief Officers for Years 2024, 2025 and 2026 B A C K G R O U N DBACKGROUND Th e City h as reach ed a ten tativ e ag reem en t with th e O sh k osh Fire Departm en t Ch ief O fficers. Th is ag reem en t h as been approv ed by th e m em bersh ip of th e g rou p for th e con tract years of 2 0 2 4 , 2 0 2 5 & 2 0 2 6 . A N A L Y S I SANALYSIS A brief syn opsis of agreem en t elem en ts in clu de an across th e board wage in crease of 3 .5 % in 2 0 2 4 , 4 .2 5 % in 2 0 2 5 , an d 4 .2 5 % in 2 0 2 6 as well as in creased h ealth in su ran ce caps an d added HR A process requ irem en t to in clu de spou se participation in order to receiv e discou n ted h ealth in su ran ce prem iu m s. Also in clu ded in th is pack et is th e con ceptu al ten tativ e agreem en t. F I S C A L I M P A C TFISCAL I M P A C T Th e estim ated im pact for th e projected in creases associated with th is ag reem en t is approxim ately $2 7 ,9 0 0 in 2 0 2 4 , $2 9 ,1 0 0 in 2 0 2 5 an d $3 0 ,3 0 0 in 2 0 2 6 . R E C O M M E N D A T I O NRECOMMENDATION Based on th e an alysis con du cted, as well as th e discu ssion an d direction th at occu rred w ith Cou n cil, staff recom m en ds approv al of th is labor agreem en t w ith th e O sh k osh Fire Departm en t Ch ief O fficers for th e years of 2 0 2 4 , 2 0 2 5 , an d 2 0 2 6 . A t t a c h m e n t sAttachments Res 25-568 Oshkosh Fire Department Chief Officers Tentative Agreement for 2024-2026 11/11/2025 25-568 RESOLUTION                  PURPOSE: APPROVE LABOR CONTRACT WITH THE OSHKOSH FIRE DEPARTMENT CHIEF OFFICERS FOR YEARS 2024, 2025 & 2026 INITIATED BY : ADMINISTRATIVE SERVICES         WHEREAS, the City of Oshkosh and Oshkosh Fire Department Chief Officers previously negotiated a Working Conditions Agreement (labor contract) for calendar years 2021-2023; and     WHEREAS, the parties reached a tentative agreement for certain changes to the labor contract for years 2024, 2025 & 2026; and       WHEREAS, the Oshkosh Fire Department Chief Officers have ratified these changes and it is appropriate for the Common Council to approve this agreement.   NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the attached changes to the current labor contract for the Oshkosh Fire Department Chief Officers and the proper City officials are authorized and directed to enter into an appropriate agreement for these purposes, the execution copy being deemed approved by their respective signatures, and said City officials are further authorized and directed to take those steps necessary to implement the terms and conditions of the labor contract.      TENTATIVE AGREEMENT THE CITY OF OSHKOSH to OSHKOSH FIRE DEPARTMENT CHIEF OFFICERS October 28, 2025 1. Article III – Medical Benefits Plan and Life Insurance Replace paragraph 2 with: Health Risk Assessment (HRA): Participation in the City’s Health Risk Assessment (HRA) program is voluntary. To receive the preferred premium contribution rate, the employee and covered spouse must participate in the HRA process. Modify premium caps by increasing 8% for 2024 Delete sentence - Note: Health insurance premium contributions are actually made one month prior to the effective dates shown. 2. Schedule A - Wages Effective at the beginning of each year’s pay period that includes the date January 1. a. 2024: 3.50% b. 2025: 4.25% c. 2026: 4.25% 3. Clean up language – as agreed to by both parties prior to ratification and approval: a. Article II – Fix formula by adding parentheses around “employee bi- weekly rate x 26 + annual longevity.” TO:Honorable Mayor and Members of the Common Council FROM:Steven M. Gohde, Assistant Director of Public Works/Utilities General Manager DATE:November 11, 2025 SUBJECT:Res 25-569 Approve Professional Services Agreement with Donohue & Associates, Inc. for Engineering Services for Wastewater Treatment Plant Debris Pit Relocation and Septage Receiving Improvements ($274,080.00) BACKGROUND A proposal w as requ ested from Don oh u e & Associates, In c. (Don oh u e) for prov idin g en gin eerin g serv ices for design an d biddin g serv ices for th e relocation of th e Wastew ater Treatm en t Plan t (WWTP) debris pit an d im prov em en ts to th e septag e receiv in g station . Th e serv ices to be prov ided w ill in clu de desig n serv ices to en h an ce an d poten tially relocate th e septag e receiv in g station ; design serv ices to bu ild a n ew debris receiv in g station an d associated site im prov em en ts on an u n dev eloped site across from th e WWTP alon g Dem psey R oad (th e form er Hu m an Society parcel); preparin g biddin g docu m en ts describin g th e w ork to en h an ce th e existin g septag e receiv in g station an d bu ild a n ew debris receiv in g station ; an d assistin g th e City w ith th e pu blic biddin g process. ANALYSIS Don oh u e was ch osen for th ese serv ices du e to th eir k n owledge of WWTP an d th eir experien ce w ith th is type of w ork at m u n icipal w astew ater facilities. FISCAL IMPACT Th e cost of th e proposal is $2 7 4 ,0 8 0 . Fu n din g for th e Project is av ailable in th e Capital Im prov em en ts Prog ram (CIP) (Accou n t No. 0 3 2 2 1 9 1 0 -7 2 1 6 -6 4 0 0 5 /Sewer Capital Fu n d-Lan d Im prov em en t-Update/R elocate Du m p Site an d Accou n t No. 0 3 2 2 2 0 1 0 -7 2 1 6 -6 4 0 0 5 /Storm Capital Fu n d-Lan d Im prov em en t-Update/R elocate Du m p Site). RECOMMENDATION Chap ter 12 of th e Mu n icipal Code of th e City of O sh k osh prov ides th at profession al serv ices of a specialized n atu re, in clu din g en g in eerin g serv ices, m ay be procu red w ith ou t th e u se of form al, sealed qu otes. I h av e rev iewed th e proposal an d in accordan ce with Section 12-16 of th e Mu n icipal Code, I am h ereby recom m en din g th at th e Com m on Cou n cil approv e th is profession al serv ices agreem en t. Atta chments Res 25-569 26-17 Donohue Proposal 11/11/2025 25-569 RESOLUTION                  PURPOSE: APPROVE PROFESSIONAL SERVICES AGREEMENT WITH DONOHUE & ASSOCIATES, INC. FOR ENGINEERING SERVICES FOR WASTEWATER TREATMENT PLANT DEBRIS PIT RELOCATION AND SEPTAGE RECEIVING IMPROVEMENTS ($274,080.00) INITIATED BY : DEPARTMENT OF PUBLIC WORKS     NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized to enter into and take those steps necessary to implement an appropriate professional services agreement with Donohue & Associates, Inc. for Engineering Services for Wastewater Treatment Plant Debris Pit Relocation and Septage Receiving Improvements in the amount of two hundred seventy four thousand eighty dollars ($274,080). Acct No.    03221910-7216-64005        Sewer Capital Fund-Land Improvement-Update/Relocate Dump Site 03222010-7216-64005        Storm Capital Fund-Land Improvement-Update/Relocate Dump Site     TO:Honorable Mayor and Members of the Common Council FROM:Steven M. Gohde, Assistant Director of Public Works/Utilities General Manager DATE:November 11, 2025 SUBJECT:Res 25-570 Approve Professional Services Agreement with Donohue & Associates, Inc. for Engineering Services for Washburn Water Tower Vault and Shorewood Lift Station Improvements ($115,710.00) BACKGROUND A proposal w as requ ested from Don oh u e & Associates, In c. (Don oh u e) for prov idin g en gin eerin g serv ices for design an d biddin g serv ices for th e replacem en t of an existin g lu m ber cov er ov er a v alv e pit at th e Wash bu rn Water Tower an d relocation of existin g v alv es at th e Sh orewood Lift Station . Th e serv ices to be prov ided will in clu de design serv ices to relocate th e existin g v alv es from th e wet w ell of th e Sh orew ood Lift Station to an abov eg rou n d v alv e stru ctu re an d relocate th e existin g con trol pan el to a room in th is abov egrou n d v alv e stru ctu re; design serv ices to replace an existin g lu m ber cov er ov er a v alv e pit at th e Wash bu rn Water Tow er with a m etal or con crete cov er com plete w ith h atch an d fall protection an d rev ision s to th e su m p pu m p disch arge pipin g; preparin g biddin g docu m en ts describin g th e work for replacin g th e existin g lu m ber cov er at th e Wash bu rn Water Tow er an d relocatin g th e v alv es at th e Sh orew ood Lift Station ; an d assistin g th e City w ith th e pu blic biddin g process. ANALYSIS Don oh u e was ch osen for th ese serv ices du e to th eir k n owledge of water an d w astew ater system s an d th eir experien ce with th is type of work at m u n icipal facilities. FISCAL IMPACT Th e cost of th e proposal is $1 1 5 ,7 1 0 . Fu n din g for th is Wash bu rn Water tow er v au lt portion of th e Project is av ailable in th e Capital Im prov em en ts Program (CIP) (Accou n t No. 0 3 2 2 1 8 1 0 -7 2 1 4 - 6 4 0 0 3 /Water Capital Fu n d-Bu ildin gs & Bu ildin g Im prv m ts-Water Tower Im prov em en ts). Fu n din g for th e Sh orewood Lift Station portion of th e Project is av ailable in th e CIP (Accou n t No. 0 3 2 2 1 9 1 0 -7 2 0 4 -6 5 1 5 3 /Sew er Capital Fu n d-Mach in ery & Equ ipm en t-WWTP -- Pu m p Station Im prov em en ts). RECOMMENDATION Chap ter 12 of th e Mu n icipal Code of th e City of O sh k osh prov ides th at profession al serv ices of a specialized n atu re, in clu din g en g in eerin g serv ices, m ay be procu red w ith ou t th e u se of form al, sealed qu otes. I h av e rev iewed th e proposal an d in accordan ce with Section 12-16 of th e Mu n icipal Code, I am h ereby recom m en din g th at th e Com m on Cou n cil approv e th is profession al serv ices agreem en t. Atta chments Res 25-570 26-18 Donohue Proposal 11/11/2025 25-570 RESOLUTION                  PURPOSE: APPROVE PROFESSIONAL SERVICES AGREEMENT WITH DONOHUE & ASSOCIATES, INC. FOR ENGINEERING SERVICES FOR WASHBURN WATER TOWER VAULT AND SHOREWOOD LIFT STATION IMPROVEMENTS ($115,710.00) INITIATED BY : DEPARTMENT OF PUBLIC WORKS     NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized to enter into and take those steps necessary to implement an appropriate professional services agreement with Donohue & Associates, Inc. for Engineering Services for Washburn Water Tower Vault and Shorewood Lift Station Improvements in the amount of one hundred fifteen thousand seven hundred ten dollars ($115,710). Acct No.    03221810-7214-64003        Water Capital Fund-Buildings & Building Imprvmts-Water Tower Improvements 03221910-7204-65153        Sewer Capital Fund-Machinery & Equipment-WWTP – Pump Station Improvements     T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Steven M. Gohde, Assistant Director of Public Works/Utilities General Manager D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Res 25-571 Approve Change Order No. 1 for Public Works Contract No. 24-03 Wastewater Treatment Plant Tertiary Treatment Electrical Service Equipment / Tech Electric Company (+$34,047.00) B A C K G R O U N DBACKGROUND Ch an ge O rder No. 1 for Con tract 2 4 -0 3 is sch edu led for con sideration by th e Com m on Cou n cil at th e Nov em ber 1 1 , 2 0 2 5 m eetin g . Th e Con tract was origin ally aw arded to Tech Electric Com pan y (Tech Electric) in Ju n e of 2 0 2 5 . Th e origin al desig n was based on Wiscon sin Pu blic Serv ice's (WPS) requ irem en ts specifically requ irin g m eterin g to be extern al to th e City-ow n ed switch g ear. After bids were receiv ed, th e City's con su ltan t, Don oh u e & Associates, In c., m et w ith WPS to rev iew th e switch g ear proposed by Tech Electric. At th at m eetin g, WPS ag reed th e m eterin g cou ld be in corporated in to th e City-own ed sw itch gear. A N A L Y S I SANALYSIS R elocatin g th e m eterin g in to th e City-own ed sw itch gear h as sev eral adv an tag es. First, it will sav e approxim ately $1 0 5 ,0 0 0 du rin g th e in stallation ph ase of th e Project by elim in atin g a separate pad-m ou n ted piece of equ ipm en t an d th e related fou n dation , con du it, an d wirin g . Secon dly, it redu ces th e area of th e WPS-own ed equ ipm en t, m ak in g th e footprin t an d easem en t sm aller. Lastly, th e n ew con fig u ration w ill allow th e switch g ear to be on e con tin u ou s assem bly, w h ich will im prov e th e aesth etics. F I S C A L I M P A C TFISCAL I M P A C T CIP Section Ch an ge O rder Am ou n t Estim ated Total Con stru ction Costs CIP Bu dget Am ou n t Bu ildin g Im prov em en ts $3 4 ,0 4 7 .0 0 $9 5 4 ,9 8 0 .0 0 $6 ,6 0 0 ,0 0 0 Total $3 4 ,0 4 7 .0 0 $9 5 4 ,9 8 0 .0 0 $6 ,6 0 0 ,0 0 0 Ultim ately, th e City w ill sav e approxim ately $7 0 ,0 0 0 by addin g th is w ork to th e Con tract. Fu n din g for th e Wastew ater Treatm en t Plan t tertiary treatm en t electrical serv ice equ ipm en t is in th e Capital Im prov em en t Program (CIP) (Accou n t No. 0 3 2 2 1 9 1 0 -7 2 0 6 -6 4 1 5 2 /Sew er Capital Fu n d-Capital Con stru ction -WWTP -- Stu dy/Con st Ph osph oru s). R E C O M M E N D A T I O NRECOMMENDATION I recom m en d approv al of Ch an ge O rder No. 1 to Con tact No. 2 4 -0 3 in th e am ou n t of +$3 4 ,0 4 7 to Tech Electric Com pan y. A t t a c h m e n t sAttachments Res 25-571 24-03 CO #1 11/11/2025 25-571 RESOLUTION                  PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 24-03 WASTEWATER TREATMENT PLANT TERTIARY TREATMENT ELECTRICAL SERVICE EQUIPMENT / TECH ELECTRIC COMPANY (+$34,047.00) INITIATED BY : DEPARTMENT OF PUBLIC WORKS         WHEREAS, the City of Oshkosh previously entered into an Agreement with Tech Electric Company for Wastewater Treatment Plant Tertiary Treatment Electrical Service Equipment; and     WHEREAS, the contract was originally awarded in June of 2025. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the following change order, a copy of which is attached, is hereby approved: Tech Electric Company W143 N9304 Henry Stark Road Menomonee Falls, WI  53051 Net Increase to Contract:  $34,047.00 PURPOSE:  See attached Change Order. Account No.     03221910-7206-641152    Sewer Capital Fund-Capital Construction-WWTP - Study/Const Phosphorus     T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Justin Gierach, Engineering Division Manager/City Engineer D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Res 25-572 Approve Acceptance of Waiver of Special Assessment Notices and Hearings for 6" Storm Sewer Lateral Relating to Contract No. 25-09 B A C K G R O U N DBACKGROUND Th is resolu tion allows th e City to assess abu ttin g property ow n ers for im prov em en ts to be com pleted du rin g th e recon stru ction of Mich ig an Street an d West 1 1 th Av en u e. Th e assessable w ork will in clu de a 6 " storm sewer lateral. Th e property own er of th e property listed below h as sig n ed a w aiv er of all special assessm en t n otices an d h earin gs: 5 1 3 West 9 th Av en u e A N A L Y S I SANALYSIS Th is resolu tion allows City staff to proceed w ith preparin g special assessm en ts for th e abu ttin g property. F I S C A L I M P A C TFISCAL I M P A C T Assessm en ts allow th e City to recov er a portion of th e costs associated with projects from ben efitin g properties. Fu n din g for th e Project is in clu ded in th e 2 0 2 5 Capital Im prov em en t Prog ram in th e Storm Sewer section (Accou n t #0 3 2 1 0 4 1 0 -6 8 0 4 -0 4 5 0 9 /Con tract Con trol-Storm Sewer-2 5 -0 9 Mich ig an St/W 1 1 th Av e R econ ). R E C O M M E N D A T I O NRECOMMENDATION I recom m en d approv al of th is resolu tion . A t t a c h m e n t sAttachments Res 25-572 25-09 Waiver-513 W 9th Ave 11/11/2025 25-572 RESOLUTION                  PURPOSE: APPROVE ACCEPTANCE OF WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARINGS FOR 6” STORM SEWER LATERAL RELATING TO CONTRACT 25-09 INITIATED BY : DEPARTMENT OF PUBLIC WORKS     NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh BE IT RESOLVED by the Common Council of the City of Oshkosh that the Waiver of Special Assessment Notices and Hearing under Section 66.0703(7)(b) of the Wisconsin Statutes, for public improvements and services pursuant to the initial resolution adopted November 26, 2024; final resolution adopted May 27, 2025; and final resolution amended November 11, 2025 for the premise described below is accepted and approved.     513 West 9th Avenue   T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Justin Gierach, Engineering Division Manager/City Engineer D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Res 25-573 Amend Final Resolution for Special Assessments for Sidewalk (New and Rehabilitation), Driveway Aprons, Sanitary Sewer Main and Laterals (New and Relay), Water Main and Laterals (New and Relay), and Storm Sewer Main and Laterals (New and Relay) Relating to Contract 25-09 / 513 West 9th Avenue with Signed Waiver A t t a c h m e n t sAttachments Res 25-573 11/11/2025 25-573 RESOLUTION                  PURPOSE: AMEND FINAL RESOLUTION FOR SPECIAL ASSESSMENTS FOR SIDEWALK (NEW AND REHABILITATION), DRIVEWAY APRONS, SANITARY SEWER MAIN AND LATERALS (NEW AND RELAY), WATER MAIN AND LATERALS (NEW AND RELAY), AND STORM SEWER MAIN AND LATERALS (NEW AND RELAY) RELATING TO CONTRACT NO. 25-09 / 513 WEST 9TH AVENUE WITH SIGNED WAIVER INITIATED BY : DEPARTMENT OF PUBLIC WORKS         WHEREAS, the Common Council of the City of Oshkosh adopted the initial resolution on November 26, 2024 relating to Contract 25-09; and     WHEREAS, the Common Council of the City of Oshkosh adopted the final resolution on May 27, 2025 relating to Contract 25-09; and     WHEREAS, pursuant to the request by the below property owner additional work has been added to this contract:  New Storm Sewer Lateral    513 West 9th Avenue       WHEREAS, the property owner has signed a waiver of special assessment notices for this purpose. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh as follows: 1.    The Final Resolution #25-253 for Special Assessment for Storm Sewer Laterals relating to Contract 25-09 is hereby amended to include the following:         New Storm Sewer Lateral          513 West 9th Avenue     2.    In all other respects the resolutions, reports and assessments for Storm Sewer Laterals relating to Contract 25-09 adopted pursuant to Final Resolution #25-253 shall remain in full force and effect. 3.    The City Clerk is directed to publish this resolution in the OSHKOSH DAILY NORTHWESTERN, the official newspaper of the City. 4.    The City Clerk is further directed to mail a copy of this resolution and the Final Resolution referred to above to every property owner named herein.  5.    If any section, sentence or clause or any special assessment set forth or referred to herein shall be declared invalid for any reason whatsoever, such decision shall not affect the remaining sections or assessments approved, which shall remain in full force and effect.   T O :T O :Members of the Common Council F R O M :F R O M :Matt Mugerauer, Mayor D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Res 25-574 Approve appointment of alternate to Transportation Committee B A C K G R O U N DBACKGROUND In accordan ce with Section 2 -1 1 (I) of th e City of O sh k osh Mu n icipal Code, th e Mayor sh all h av e th e au th ority to appoin t, su bject to Cou n cil approv al, m em bers to th e v ariou s Boards an d Com m ission s with in th e City. As th ere is cu rren tly a v acan cy on th e City's Tran sportation Com m ittee, I am m ak in g th e appoin tm en t listed below for con sideration by th e Com m on Cou n cil. T r a n s p o r t a ti o n C o m m i tt e eTransportation C o m m i t t e e Kris Larson , appoin ted to Altern ate 1 , term expirin g May 3 1 , 2 0 2 6 A t t a c h m e n t sAttachments Res 25-574 TC - Larson - Application 11/11/2025 25-574 RESOLUTION                  PURPOSE: APPROVE APPOINTMENT TO TRANSPORTATIN COMMITTEE  INITIATED BY : MAYOR MATT MUGERAUER         WHEREAS, Section 2-11(I) of the City of Oshkosh Municipal Code provides the Mayor with the authority to appoint, subject to Council approval, members to the various boards, committees, and commissions within the City of Oshkosh; and      WHEREAS, vacancies currently exist on various boards, committees, and commissions;   NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the following appointment is hereby made and approved, effective November 12, 2025: Transportation Committee Kris Larson, appointed to Alternate 1, expiring May 31, 2026   1 Zuercher, Kami From:City of Oshkosh Board/Commission Background Questionnaire <DoNotReply@oshkoshwi.gov> Sent:Wednesday, November 5, 2025 12:40 PM To:Zuercher, Kami Subject:City of Oshkosh Board/Commission Background Questionnaire City of Oshkosh Board/Commission Background Questionnaire Date:11/5/2025 12:40:20 PM Board/Commission Transportation (and parks if ever there is roo Name (Last, First, Middle) Address City State Zip Kris Larson n: Self food things 18 Years of Age or Older Yes Home Phone Business Phone Email Address Cell Phone side/live within the Oshkosh Yes s: 18 some college e any relatives in the service o nt of the City of Oshkosh? (Yes/No): No rtment and relationship: al conflicts of interest: Business and real estate but able to recuse r committees on which you have served: Years: CVB…and others 2 previous education, experience, training fication from yo fies you for the positi terested in? Lots of civic and private boards and commissions. ed, how would you work towards munity through oard/Commission? Strong understanding of procedures and more T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Jim Collins, Director of Transportation D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Ord 25-575 Amend Section 27A-11 of the Oshkosh Municipal Code pertaining to parking regulations on Grand Street from Merritt Avenue to Hudson Avenue (Transportation Committee recommends approval) B A C K G R O U N DBACKGROUND Th is is a citizen requ est statin g h e is h av in g difficu lty with in gress an d eg ress to h is driv ew ay du e to park ed cars an d th e n arrow street w idth . Neig h bors also reported th at th e park ed cars can n egativ ely im pact em erg en cy v eh icle respon se tim es, garbage pick -u p an d sn ow rem ov al. Park in g is already restricted on th e West Side of th e street an d a portion of th e east side. Th e m ajority of n eig h bors are in fav or of th is park in g restriction based on testim on y at th e tran sportation com m ittee. Th ere is on e residen t wh o h as a v ery sm all driv ew ay w ith room to park on ly on e v eh icle th at called in opposition to th is. A N A L Y S I SANALYSIS G ran d Street is a on e-w ay street an d is 1 8 feet wide, w h ich on ly leav es abou t 9 feet for trav el w h en th ere is a park ed v eh icle, in clu din g larg e m u n icipal tru ck s an d em erg en cy v eh icles. A trav el lan e is g en erally 1 0 --1 2 feet w ide. Th ere is a grou p h om e on th is street wh ich places frequ en t EMS calls. B O A R D /C O M M I S S I O N I N F O R M A T I O NBOARD/C O M M I S S I O N I N F O R M A T I O N Th e Tran sportation Com m ittee recom m en ds approv al of th e requ est (4 -0 ). F I S C A L I M P A C TFISCAL I M P A C T Th e fiscal im pact is th e cost of sign age. R E C O M M E N D A T I O NRECOMMENDATION Th e Tran sportation Com m ittee recom m en ds approv al (4 -0 ) A t t a c h m e n t sAttachments Ord 25-575 11/11/2025 25-575 ORDINANCE   SECOND READING     10/28/2025 25-556 ORDINANCE   FIRST READING                  PURPOSE: AMEND SECTION 27A-11 OF THE MUNICIPAL CODE TO EXPAND PARKING RESTRICTIONS ON GRAND STREET (TRANSPORTATION COMMITTEE RECOMMENDS APPROVAL) INITIATED BY : TRANSPORTATION DEPARTMENT   RECOMMENDATION:    TRANSPORTATION COMMITTEE - APPROVED A GENERAL ORDINANCE OF THE CITY OF OSHKOSH AMENDING SECTION 27A-11 OF THE OSHKOSH MUNICIPAL CODE PERTAINING TO PARKING REGULATIONS ON DESIGNATED STREETS AND ALLEYS     WHEREAS, the Transportation Committee recommends approval to expand parking restrictions on Grand Street. NOW, THEREFORE, BE IT ORDAINED by the Common Council of the City of Oshkosh as follows:     SECTION 1. That Section 27A-11 of the Oshkosh Municipal Code pertaining to parking regulations on designated streets and alleys is hereby amended as follows: A-11    PARKING REGULATIONS ON DESIGNATED STREETS AND ALLEYS: Grand Street Delete Therefrom: No Parking, east side, from Merritt Avenue to 20 feet North and No parking, Grand Street, east side from Merritt Avenue from 60 feet to 156 feet north.   Add Thereto: No parking, Grand Street, east side from Merritt Avenue to Hudson Avenue.      SECTION 2. This ordinance shall be in full force and effect from and after its passage, publication and placement of the appropriate signage.     SECTION 3. Publication Notice.  Please take notice that the City of Oshkosh enacted ordinance #25-575 on November 11, 2025 EXPANDING PARKING REGULATIONS ON GRAND STREET. (A GENERAL ORDINANCE OF THE CITY OF OSHKOSH AMENDING SECTION 27A-11 OF THE OSHKOSH MUNICIPAL CODE PERTAINING TO PARKING REGULATIONS ON DESIGNATED STREETS AND ALLEYS).  This ordinance removes parking on the east side of Grand Street from Merritt Avenue to Hudson Avenue.   The full text of the ordinance may be obtained at the Office of the City Clerk, 215 Church Avenue and through the City’s website at www.oshkoshwi.gov Clerk’s phone: 920/236-5011.  T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Jim Collins, Director of Transportation D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Ord 25-576 Amend Section 27-63(B) of the City of Oshkosh Municipal Code to restrict bicycles on sidewalks or walkways where a building abuts the sidewalk B A C K G R O U N DBACKGROUND Th ere is g row in g con cern from th e cou n cil an d th e com m u n ity reg ardin g e-bik es an d w h ere th ey are allow ed. E-bik es h av e becom e in creasin g ly popu lar an d can go relativ ely fast. Con v ersely, e-bik es m ay be u sed respon sibly an d safely an d can be a g ood option for people w h o m ig h t oth erwise stru gg le with bicyclin g to stay activ e. E-bik es gen erally h av e all righ ts an d respon sibilities gran ted by statu te to tradition al bik es. Th is m ean s th ey are allowed on road (wh eth er th ere is a bik e lan e or n ot), on sidew alk s, an d ev eryw h ere else bik es are allowed. A docu m en t sh owin g wh ere differen t types of dev ices are cu rren tly allow ed in O sh k osh is attach ed. A N A L Y S I SANALYSIS Staff an d th e Tran sportation Com m ittee con sidered m an y option s in clu din g: 1 . Statu s qu o -- bik es an d E-bik es are allowed on sidew alk s. 2 . Ban all bik es from sidewalk s (bik es m u st be on th e road in th e bik e lan e or in th e trav el lan e). Th is wou ld rem ov e all bik es from sidewalk s for all u sers, reg ardless of ag e or ability. 3 . Bik es an d E-bik es are allow ed on sidewalk s w ith E-bik es operated on ly in pedal m ode (with ou t th e pow er u n it en gaged); wh en operated on pow er, E-bik es m u st be in th e roadw ay or bik e lan e. Th is wou ld be difficu lt to en force. 4 . Desig n ate areas w h ere bik in g is n ot perm itted on th e sidew alk . For exam ple, dow n tow n on Main Street, O regon Street etc. Create a m ap in th e ordin an ce an d in stall sig n ag e. It w ou ld be difficu lt to com m u n icate an d sig n so th at riders u n derstan d wh ere th ey are proh ibited. 5 . R estrict bik es an d E-bik es on sidew alk s wh ere a bu ildin g abu ts th e sidewalk or (wh ere a bu sin ess' in g ress an d egress abu ts th e sidewalk wh ich is basically th e sam e th in g ). Bicycle ridin g on sidew alk s is perm itted, except as proh ibited in th is su bsection or oth erwise regu lated by th e m u n icipal code. Th is w ou ld regu late th e larg est con cern , w h ich is con flicts between th ose en terin g an d exitin g bu ildin gs an d all bicycles. B O A R D /C O M M I S S I O N I N F O R M A T I O NBOARD/C O M M I S S I O N I N F O R M A T I O N Th e Tran sportation Com m ittee recom m en d approv al of th is recom m en dation (4 -0 ) F I S C A L I M P A C TFISCAL I M P A C T Th e fiscal im pact of th is ordin an ces is v ery m in im al. R E C O M M E N D A T I O NRECOMMENDATION Staff recom m en ds tak in g a m easu red approach th at can be rev isited if n ew issu es arise. At th is tim e, staff recom m en ds con tin u in g to allow bik es on sidewalk s bu t restrictin g bik es on sidewalk s w h ere bu ildin g s abu t th e sidew alk . Th is approach w ou ld allow th e u se of E-Bik es in power m ode in areas with ch allen g in g grades, an d areas n ear Hw y. 4 1 , For exam ple. How ev er, th e approach wou ld restrict th e u se of bik es an d E-Bik es on sidewalk s in areas th at h av e th e m ost poten tial for bicycle an d pedestrian con flicts. Th e O sh k osh Police Departm en t is th e m ost con fiden t in th is option . It sh ou ld be n oted th at in areas wh ere bik es an d E-bik es wou ld rem ain perm itted to u se sidew alk s an d park trails, th ere are restriction s in place requ irin g th at bik es an d E-bik es yield to pedestrian s an d trav el safely. As n oted abov e, it sh ou ld also be n oted th at if issu es con tin u e, addition al ordin an ces cou ld be con sidered, in clu din g th e addition of desig n ated areas, th e proh ibition of E-bik es operatin g in power m ode, or th e proh ibition of all bik es on sidewalk s in th e fu tu re. A t t a c h m e n t sAttachments Ord 25-576 11/11/2025 25-576 ORDINANCE                                   PURPOSE: AMEND SECTION 27-63(B) OF THE CITY OF OSHKOSH MUNICIPAL CODE TO RESTRICT BICYCLES ON SIDEWALKS OR WALKWAYS WHERE A BUILDING ABUTS THE SIDEWALK INITIATED BY : TRANSPORTATION DEPARTMENT   RECOMMENDATION:    TRANSPORTATION RECOMMENDS APPROVAL A GENERAL ORDINANCE OF THE CITY OF OSHKOSH AMENDING SECTION 27-63 (B) OF THE OSHKOSH MUNICIPAL CODE PERTAINING TO RIDING BICYCLES ON SIDEWALKS OR WALKWAYS TO RESTRICT RIDING BICYCLES ON SIDEWALKS OR WALKWAYS WHERE A BUILDING ABUTS THE SIDEWALK     WHEREAS, the Transportation Committee recommends regulating bicycles where buildings abut the sidewalk or walkway. NOW, THEREFORE, BE IT ORDAINED by the Common Council of the City of Oshkosh as follows:     SECTION 1. That Section 27-63 of the Oshkosh Municipal Code pertaining to parking regulations on designated streets and alleys is hereby repealed and recreated to read as follows: B. No person shall ride a bicycle on the sidewalk or walkway where a building abuts the sidewalk or walkway.  Bicycle riding on sidewalks or walkways is permitted, except as prohibited in this subsection or otherwise regulated in this chapter.   Every person operating a bicycle upon a sidewalk or walkway shall yield the right-of-way to any pedestrian and shall exercise due care and give an audible signal when passing a bicycle rider or pedestrian proceeding in the same direction.  No person shall operate a bicycle upon any sidewalk, walkway or other area designated under section 27-66 of this municipal code as a prohibited area for skateboards.     SECTION 2. This ordinance shall be in full force and effect from and after its passage, publication and placement of the appropriate signage.     SECTION 3. Publication Notice.  Please take notice that the City of Oshkosh enacted ordinance #25-576 RESTRICTING BICYCLES ON SIDEWALK OR WALKWAY WHERE A BUILDING ABUTS THE SIDEWALK  (A GENERAL ORDINANCE OF THE CITY OF OSHKOSH AMENDING SECTION 27-63(B) OF THE OSHKOSH MUNICIPAL CODE TO RESTRICT THE RIDING OF BICYCLES ON SIDEWALKS OR WALKWAYS WHERE BUILDINGS ABUT THE SIDEWALK) ON NOVEMBER 11, 2025.  This ordinance restricts bicycles on sidewalks or walkways where a building abuts the sidewalk.    The full text of the ordinance may be obtained at the Office of the City Clerk, 215 Church Avenue and through the City’s website at www.oshkoshwi.gov Clerk’s phone: 920/236-5011.  T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Jim Collins, Director of Transportation D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Ord 25-577 Amend Section 27-A11 of the City of Oshkosh Municipal Code Pertaining to Parking Regulations on High Avenue B A C K G R O U N DBACKGROUND Th e Tran sportation Com m ittee recen tly recom m en ded an d Cou n cil approv ed con v ertin g section s of on -street city perm it park in g to APP-based paid park in g on Hig h Av en u e. As staff w as ch an gin g th e sig n s, th ey n oticed an area wh ere in ter-city bu ses load an d u n load th at n eeded to be accou n ted for. Th ey also n oticed a cou ple section s of th e ordin an ce th at are ou tdated based on cu rren t con dition s. A N A L Y S I SANALYSIS Th is clean s u p th e ordin an ces on High Av en u e to m atch th e field con dition s. Sig n ag e will be adju sted accordin g ly. Th ese are v ery m in or adju stm en ts. F I S C A L I M P A C TFISCAL I M P A C T N/A R E C O M M E N D A T I O NRECOMMENDATION I recom m en d th at th e Com m on Cou n cil approv e th ese m odification s to Section 2 7 A-1 1 an d of th e Mu n icipal Code pertain in g to park in g reg u lation s on design ated streets an d alleys. A t t a c h m e n t sAttachments Ord 25-577 11/11/2025 25-577 ORDINANCE                                   PURPOSE: AMEND SECTION 27-A11 OF THE CITY OF OSHKOSH MUNICIPAL CODE PERTAINING TO PARKING REGULATIONS ON HIGH AVENUE  INITIATED BY : TRANSPORTATION DEPARTMENT   A GENERAL ORDINANCE OF THE CITY OF OSHKOSH AMENDING SECTION 27A-11 OF THE OSHKOSH MUNICIPAL CODE PERTAINING TO PARKING REGULATIONS ON DESIGNATED STREETS AND ALLEYS TO MATCH CODE TO CURRENTLY EXISTING CONDITIONS.     WHEREAS, the Transportation Committee and Council recommended and approved conversion of permit parking to paid parking on High Avenue; and     WHEREAS, as the signs were installed staff discovered several differences between the current code language and the on ground signage and conditions; and           WHEREAS, staff  recommends updating the code to match the current on ground signage and conditions.    NOW, THEREFORE, BE IT ORDAINED by the Common Council of the City of Oshkosh as follows:     SECTION 1. That Section 27A-11 of the Oshkosh Municipal Code pertaining to parking regulations on designated streets and alleys is hereby amended as follows: A-11    PARKING REGULATIONS ON DESIGNATED STREETS AND ALLEYS: High Avenue Delete Therefrom:   No parking, southwesterly side, from 30 feet west of Osceola Street to 30 feet easterly of Osceola Street Add Thereto:   No parking, southwesterly side, from Osceola Street to 80 feet west No parking, loading zone, southwesterly side, from Osceola Street to 154 feet east Paid parking through City’s Application Based Parking Management System, southwesterly side, from 250 feet west of Osceola Street to 80 feet west of Osceola Street, between the hours of 6:00 A.M. and 10:00 P.M., daily, except Sundays and holidays. Paid parking through City’s Application Based Parking Management System, southwesterly side, from 154 feet east of Osceola Street to 330 feet Osceola Street, between the hours of 6:00 A.M. and 10:00 P.M., daily except Sundays and holidays     SECTION 2. This ordinance shall be in full force and effect from and after its passage, publication and     SECTION 2. This ordinance shall be in full force and effect from and after its passage, publication and placement of the appropriate signage.     SECTION 3. Publication Notice.  Please take notice that the City of Oshkosh enacted ordinance #25-577 AMEND SECTION 27-A11 OF THE CITY OF OSHKOSH MUNICIPAL CODE PERTAINING TO PARKING REGULATIONS ON HIGH AVENUE (A GENERAL ORDINANCE OF THE CITY OF OSHKOSH AMENDING SECTION 27A-11 OF THE OSHKOSH MUNICIPAL CODE PERTAINING TO PARKING REGULATIONS ON DESIGNATED STREETS AND ALLEYS) on NOVEMBER 11, 2025.  This Ordinance corrects parking ordinances on High Avenue to match currently existing field conditions. This ordinance slightly adjusts the geographic limits of application based paid parking, no parking and no parking/loading zones on High Avenue.  The full text of the ordinance may be obtained at the Office of the City Clerk, 215 Church Avenue and through the City’s website at www.oshkoshwi.gov Clerk’s phone: 920/236-5011.  TO:Honorable Mayor and Members of the Common Council FROM:Justin Gierach, Engineering Division Manager/City Engineer DATE:November 11, 2025 SUBJECT:Res 25-578 Approve Determination of Necessity to Acquire and Approve and Execute Relocation Order for a Storm Sewer Easement at 3820 Jackson Street (Parcel 91527190100), 3835 Summerset Way (Parcel 91527310000), and 3847 Summerset Way (Parcel 91527320000) BACKGROUND Th e City of O sh k osh (City) is requ estin g approv al to acqu ire a storm sewer easem en t for an existin g storm sewer th at drain s from Jack son Street to Su m m erset Way from ADVO CAP In c. (3 8 2 0 Jack son Street), Con n or Miller an d Abigail Pan sk e (3 8 3 5 Su m m erset Way), an d Debra Kerrig an (3 8 4 7 Su m m erset Way). Du rin g a m eetin g on May 7 , 2 0 2 5 , ADVO CAP In c.'s En g in eer m ade th e Departm en t of Pu blic Work s (DPW) aware of a storm sewer in let in th e Jack son Street/STH 7 6 righ t-of-way th at h ad a pipe th at ran to th e east. Followin g th is m eetin g , DPW staff su rv eyed an d in spected th e sew er. Prelim in ary telev isin g sh ows fen ce posts driv en th rou g h th e top of th e pipe creatin g obstru ction s in large rain ev en ts. ANALYSIS Wh ile th e City did n ot in stall th e storm sewer, by v irtu e of th e existin g storm sew er in lets with in th e Jack son Street rig h t-of-w ay, th e City h as effectiv ely becom e respon sible for th e storm sewer. City staff h as rev iew ed th e storm drain age in th is area, as w ell as a m ixtu re of altern ativ es an d recom m en ds m ain tain in g th is pipe. Th e Jack son Street corridor su pports a w ide v ariety of u ses in clu din g com m ercial, in du strial, an d residen tial. Th ere are also a n u m ber of v acan t sites av ailable for dev elopm en t. Th e proposed easem en t will form alize th e rig h t of th e City to m ain tain th e storm sewer in th is location an d allow th e City to u tilize th e easem en t area for all pu rposes related to th e m u n icipal storm sew er system . Th is in clu des in stallin g , operatin g, m ain tain in g , an d replacin g an y related in frastru ctu re w h en n ecessary. As in dicated abov e, w ork will n eed to be don e on th e storm sew er to fix th e fen ce post dam age to allow for th e pipe to operate at fu ll capacity. R ecen t con v ersation s with con tractors su gg est th at th e pipe m ay be able to be fixed with ou t disru ptin g th e su rface of th e easem en t. In th is case, an y fen ces an d trees m ay be able to rem ain u n til a later date, wh en m ore in v asiv e m eth ods m ay be n ecessary to m ain tain th e storm sewer system . How ev er, th e n on -perm itted sh ed w ou ld n eed to be relocated, bu t acqu irin g th is property th rou gh form al m ean s will allow th e City to pay for th is relocation an d lessen th e bu rden on th e property ow n ers in th is reg ard. Th e proposed easem en t will be approxim ately 2 0 feet w ide an d 4 0 0 feet lon g; g en erally cen tered on th e storm sewer startin g at th e eastern Jack son Street righ t-of-way lin e h eadin g east towards Su m m erset Way an d en din g at th e western Su m m erset Way righ t-of-way lin e. Th e City Attorn ey's O ffice will draft th e in itial easem en t docu m en ts w h ich will be u sed in th e n egotiation process. O n ce sign ed easem en t ag reem en t will be recorded at th e Win n ebago Cou n ty R egister of Deeds u pon approv al by th e Com m on Cou n cil. FISCAL IMPACT Th ere is n o fiscal im pact to th e City at th is tim e. As th e Departm en t of Pu blic Work s an d th eir real estate con su ltan t m ov e forw ard with th e process, th e acqu isition will be on a fu tu re Cou n cil Agen da, wh ich w ill in clu de th e fiscal im pact. RECOMMENDATION Th e Plan Com m ission recom m en ded acqu irin g th e easem en t on Au gu st 1 9 , 2 0 2 5 . Please see th e attach ed staff report for m ore in form ation . Atta chments Res 25-578 Attachment to Res 25-578 - Legal Descriptions and Map PC Staff Report-Jackson-Summerset SW Easement 11/11/2025 25-578 RESOLUTION                  PURPOSE: APPROVE DETERMINATION OF NECESSITY TO ACQUIRE AND APPROVE AND EXECUTE RELOCATION ORDER FOR A STORM SEWER EASEMENT AT 3820 JACKSON STREET (PARCEL 91527190100), 3835 SUMMERSET WAY (PARCEL 91527310000), AND 3847 SUMMERSET WAY (PARCEL 91527320000) INITIATED BY : DEPARTMENT OF PUBLIC WORKS   PLAN COMMISSION RECOMMENDATION:  Approved          WHEREAS, the City has identified an existing storm sewer that drains the Jackson Street right-of-way which does not have an existing easement; and     WHEREAS, the Jackson Street corridor supports a wide variety of uses including commercial, industrial, and residential and staff has reviewed storm water management in the area and for the health, safety and welfare of the public using Jackson Street and protection of property in the area recommends maintaining the existing storm water connection and formalizing an easement for the existing storm water pipe; and     WHEREAS, the proposed easement will allow the City to utilize the easement area for all purposes related to the municipal storm sewer system and allow the City to make necessary repairs to the existing storm water pipe in this area; and     WHEREAS, the Department of Public Works is recommending the acquisition of an easement over portions of Parcels 91527190100, 91527310000, and 91527320000 for the storm sewer, per the attached; and     WHEREAS, the Plan Commission has reviewed and recommends approval of the acquisition of the storm sewer easement as proposed; and     WHEREAS, it is necessary to adopt a Relocation Order under Section 32.05(1)(a) of the Wisconsin Statutes to proceed with acquisition of the storm sewer easement. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that it determines that it is necessary and a public purpose for the City to acquire the below-described property for purposes of a storm sewer easement. BE IT FURTHER RESOLVED that this Resolution and its attachments constitutes the relocation order required under Section 32.05(1)(a) of the Wisconsin Statutes for purposes of acquiring a storm sewer easement at 3820 Jackson Street (Parcel 91527190100), 3835 Summerset Way (Parcel 91527310000), and 3847 Summerset Way (Parcel 91527320000). BE IT FURTHER RESOLVED that the proper City staff and representatives are hereby authorized and directed to execute any and all documents necessary for implementation of this Relocation Order and that the City Clerk is hereby directed to file a certified copy of this Relocation Order with the Winnebago County Clerk within twenty (20) days of its adoption. BE IT FURTHER RESOLVED that City staff and representatives are hereby authorized and directed to begin the process for acquisition of this storm sewer easement as provided in Wisconsin Statutes Section 32.05 including but not limited to obtaining an appraisal and beginning the negotiation process with persons having an interest in the above-described property.   Attachments:  Descriptions of property to be acquired Map showing location of property and existing infrastructure History:  This item appeared at previous Council meetings under different resolution numbers. See below for history.   Res 25-450 - August 26, 2025 meeting: motion to lay over to September 9, 2025 meeting (5-0) Res 25-480 - September 9, 2025 meeting: motion to lay over to November 11, 2025 meeting (6-1) Easement for Storm Sewer Parcel 1527190100 Owner: ADVOCAP INC. Address: 0 Jackson Street Being a part of the Southwest 1/4 of the Southwest 1/4 of Section 36, Township 19 North, Range 16 East, Third Ward, City of Oshkosh, Winnebago County, Wisconsin, bounded and described as follows: Commencing at the northwesterly corner of Lot 2 of CSM 5284 Doc No. 1260486; thence southernly 14.4 feet along the westerly line of Lot 2 to the point of beginning; thence easterly along a straight line parallel the northerly line of Lot 2 a distance of 276.5 feet to a point on the easterly line of Lot 2; thence south along the easterly line of Lot 2 a distance of 20.0 feet; thence westerly along the line parallel to the north property line of Lot 2 to the westerly property line to a point of Lot 2; thence north from this point along the westerly property line of Lot 2 back to the point of beginning. Easement for Storm Sewer Parcel 1527310000 Owner: Connor Miller/Abigail Panske Address: 3835 Summerset Way Being a part of the Southwest 1/4 of the Southwest 1/4 of Section 36, Township 19 North, Range 16 East, Third Ward, City of Oshkosh, Winnebago County, Wisconsin, bounded and described as follows: Commencing at the northeast corner of Lot 12 Block 2 1st Addition to Windsor Green also known as the point of beginning; thence west along the northerly line of Lot 12 to the southwest corner of Lot 12; thence south along the westerly line of Lot 12 a distance 10 feet; thence east parallel to the northerly line of Lot 12 to a point on the easterly line of Lot 12; thence north 10 feet back to the point of beginning. Easement for Storm Sewer Parcel 1527320000 Owner: Debra Kerrigan Address: 3847 Summerset Way Being a part of the Southwest 1/4 of the Southwest 1/4 of Section 36, Township 19 North, Range 16 East, Third Ward, City of Oshkosh, Winnebago County, Wisconsin, bounded and described as follows: Commencing at the southeast corner of Lot 13 Block 2 1st Addition to Windsor Green also known as the point of beginning; thence west along the southerly line of Lot 13 to the southwest corner of Lot 13; thence north along the westerly line of Lot 13 a distance 10 feet; thence east parallel to the southerly line of Lot 13 to a point on the easterly line of Lot 13; thence south 10 feet back to the point of beginning. JA C K S O N S T R E E T SU M M E R S E T W A Y PARCEL 1527190100 0 JACKSON STREET PARCEL 1527320000 3847 SUMMERSET WAY PARCEL 1527310000 3835 SUMMERSET WAY 20.0' 276.5'120.0' 20.0' P.O.B FOR 3835 & 3847 SUMMERSET WAY 14 . 4 ' P.O.B. FOR 0 JACKSON STREET CI T Y O F O S H K O S H EN G I N E E R I N G D I V I S I O N GR A P H I C SC A L E : ( I N F E E T ) 1 I N C H = 6 0 F E E T 0 30 60 DR A W N : 8- 2 1 - 2 0 2 5 FI L E N A M E : S t o r m S e w e r E a s e m e n t ST O R M S E W E R E A S E M E N T JA C K S O N S T R E E T - S U M M E R S E T W A Y ITEM: Recommendation Pertaining to Acquisition of a Storm Sewer Easement at 3820 Jackson Street (Parcel 91527190100), 3835 Summerset Way (Parcel 91527310000) and 3847 Summerset Way (Parcel 91527320000) Plan Commission Meeting of August 19, 2025 Applicant: City of Oshkosh Department of Public Works Owners: ADVOCAP Inc.; Connor Miller & Abigail Panske; Debra Kerrigan Action Requested: The City of Oshkosh is requesting approval to acquire a storm sewer easement from ADVOCAP Inc. (3820 Jackson Street), Connor Miller & Abigail Panske (3835 Summerset Way), and Debra Kerrigan (3847 Summerset Way) that drains from Jackson Street to Summerset Way. Under Section 62.23 of the Wisconsin Statutes and Chapter 30 of the City’s Municipal Code, the Plan Commission is responsible to review and advise the Council on the acquisition of interests in land for public utility purposes. The Council will then, based upon the recommendation from Plan Commission, make a final determination on whether to acquire the easements as requested. Property Location and Background Information: The subject properties consist of a proposed new commercial development off of Jackson Street and two residential properties off of Summerset Way. Information regarding when this storm sewer was installed is unknown. An easement was not secured from the property owners at that time. Plans are currently under review for a new childcare incubation center at the Jackson Street site (Parcel 1527190100) which will utilize the storm sewer. This existing storm sewer drains the Jackson Street Right-of-Way. The Jackson Street corridor supports a wide variety of uses including commercial, industrial, and residential. There are also a number of vacant sites available for development. The proposed easement will allow the City to utilize the easement area for all purposes related to the municipal storm sewer system. This includes accessing the easement area, and installing, operating, maintaining, and replacing any related infrastructure when necessary. The proposed easement will be 20 feet wide, approximately 400 feet long, centered on the storm sewer starting at the eastern Jackson Street Right-of-Way line heading east towards Summerset Way, ending at the western Summerset Way Right-of-Way line. The City Attorney’s Office will prepare a draft of the easement documents. The signed easement agreement will be recorded at the Winnebago County Register of Deeds upon approval by the Common Council. Recommendation: Staff recommends approval of the request to acquire a storm sewer easement located at 3820 Jackson Street, 3835 Summerset Way and 3847 Summerset Way. Plan Commission recommended approval of the request to acquire on August 19, 2025. For a comprehensive record of the proceedings, the official minutes can be obtained by contacting Planning Services. CH AT E A UTER S UM M ERS ET WAY J A C K S O N S T CHAT EAU TER SUMMERSET WAY J A C K S O N S T DR-6 MR-12 SMU-PD SR-3 SR-3 SR-5 J:\GIS\Planning\Plan Commission Site Plan Map Template\2023 Plan Commission Site Plan Map Template.mxd User: katrinam Prepared by: City of Oshkosh, WI Printing Date: 8/12/2025 1 in = 100 ft 1 in = 0.02 mi¯ZONING & AERIAL MAP City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer SUBJECTSITE Page 3 T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Lynn Lorenson, City Attorney D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Approv e San itary District Ag reem en t with Win n ebago Area San itary District (O ctober 1 , 2 0 2 5 th rou g h Decem ber 3 1 , 2 0 4 5 ) (Winnebago Area Sanitary District requested this item be withdrawn) B A C K G R O U N DBACKGROUND At its Septem ber 2 3 , 2 0 2 5 m eetin g th e Com m on Cou n cil approv ed a n ew Master Agreem en t for all san itary districts. As n oted at th at tim e, adden du m s with in div idu al districts rem ain ed ou tstan din g an d w ere requ ired to fin alize th e ag reem en ts. Th e adden du m s con tain m aps an d term s th at m ay be specific to each District. As an in cen tiv e to com plete th e adden du m in a tim ely m an n er staff offered to apply th e n ew con tractu al rates to 3 rd qu arter 2 0 2 5 billin g (th e con tractu al rates are lower th an th e n on - con tractu al rates th at th e districts are cu rren tly payin g), u pon fin al ag reem en t with th e largest district, th e Alg om a San itary District No. 1 , an d approv al by th e in div idu al districts in tim e for cou n cil con sideration at th e O ctober 2 8 , 2 0 2 5 cou n cil m eetin g . Th e Algom a San itary District an d Win n ebag o Area District h av e both approv ed th e agreem en t. A N A L Y S I SANALYSIS Th is resolu tion w ill approv e th e fin al San itary District Ag reem en t with th e Win n ebag o Area San itary District. For all districts, th e term of th e Ag reem en t is th rou g h Decem ber 3 1 , 2 0 4 5 . In addition , for all districts becau se of th e lon g term of th e agreem en t an d discrepan cies fou n d in cu rren t m appin g th e agreem en ts in clu de prov ision s allowin g th e m aps to be u pdated ov er th e term of th e agreem en t as serv ice areas are am en ded. Staff at East Cen tral Wiscon sin R egion al Plan n in g Com m ission (ECWR PC) h av e in dicated th at th ey w ill rev iew m aps in th e n ext year an d u pdate in accordan ce w ith th e ag reem en ts reach ed. Ch an g es to th ose m aps will n ot requ ire cou n cil approv al to u pdate th e m aps attach ed to th e agreem en t as th e ag reem en t an ticipates u pdatin g m aps ov er th e cou rse of th e agreem en t in accordan ce with approv ed ch an g es. Term s specific to th e Win n ebag o Area San itary District in clu de: Becau se th is is a v ery n ew District an in terim ag reem en t h ad been drafted to allow for th e creation an d con n ection of th is system to th e n ew system . Th at ag reem en t prov ided th at w h en a Master San itary Ag reem en t was approv ed th at th e Master San itary Ag reem en t w ou ld th en g ov ern th e prov ision of san itary sewer serv ices. Th e adden du m ack n owledges th at th e Master San itary Ag reem en t will n ow g ov ern prov ision s pertain in g to san itary sewer serv ices between th e parties. Th ere are two m ixed u se residen tial/com m ercial properties in th is area th at th e District believ es u tilize v ery little w ater an d wastewater serv ices, u pon con firm ation of th is an d for ease of th e district for th eir billin g , th e city ag reed th at th ose properties w ou ld be billed con sisten tly with all oth er residen tial properties in th e district. If th e u se w ou ld ch an g e th e parties ag reed th at th is w ou ld be rev iewed an d m ay be ch an g ed at th at tim e. F I S C A L I M P A C TFISCAL I M P A C T Approv al of th is Agreem en t w ill m ov e th is san itary district to billin g u n der th e n ew con tractu al rates wh ich are less th an th e cu rren t n on -con tractu al rates, bu t sav e th e City costs related to m on itorin g serv ice with a cu stom er n ot u n der a cu rren t ag reem en t an d en forcem en t of city ordin an ces in th e districts w h ich is a requ irem en t in clu ded w ith in th e con tractu al prov ision s for districts. As n oted in th e Septem ber 2 3 , 2 0 2 5 resolu tion approv in g th e Master Agreem en t, th e n ew agreem en t also allow s th e city to recou p th e costs of prov idin g serv ice to san itary districts in a con sisten t an d equ itable m an n er th at is reflectiv e of th e portion of w astew ater serv ices an d in frastru ctu re u sed by th e districts. R E C O M M E N D A T I O NRECOMMENDATION Staff recom m en ds approv al of th e proposed Ag reem en t. A t t a c h m e n t sAttachments Res 25-546 Winnnebago Area Agreement 10/28/2025 25-546 RESOLUTION     LAID OVER 4-0     PURPOSE: APPROVE SANITARY DISTRICT AGREEMENT WITH WINNEBAGO AREA SANITARY DISTRICT (OCTOBER 1, 2025 THROUGH DECEMBER 31, 2045) INITIATED BY : CITY ADMINISTRATION         WHEREAS, at its September 23, 2025 meeting the Common Council approved a new Master Agreement for all sanitary districts; and     WHEREAS, the Master Agreement governs general terms applicable to all districts and each district requires individualized maps and individual terms specific to their district; and     WHEREAS, it is therefore necessary to approve a final agreement with each sanitary district; and     WHEREAS, city staff and district representatives met and agreed to individualized attachments identifying boundaries, connection points and any necessary individualized provisions for each district; and     WHEREAS, the District has approved the agreement. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the attached Sanitary District Agreement with Winnebago Area Sanitary District for the provision of sanitary sewer and wastewater treatment service for the period from October 1, 2025 through December 31, 2045 is hereby approved and that the proper city officials are hereby authorized to execute and deliver the agreement in substantially the same form as attached hereto, any changes in the execution copy being deemed approved by their respective signatures, and said City officials are authorized and directed to take those steps necessary to implement the terms and conditions of the Agreement. BE IT FURTHER RESOLVED that the proper city officials are hereby authorized and directed to apply contractual rates as provided for within this Agreement for services, including during the 3rd quarter of 2025, to be billed after the execution of this Agreement.   Page 1 of 36 City of Oshkosh and Winnebago Area Sanitary District Agreement This Oshkosh Sanitary Districts Master Agreement (“Agreement”) is made between the City of Oshkosh, a Wisconsin Municipality with its principal offices located at 215 Church Avenue, Oshkosh, Winnebago County, Wisconsin 54902-1130 (“City”) and the Winnebago Area Sanitary District, a body politic organized and existing pursuant to Chapter 60, Subchapter IX Town Sanitary Districts, §60.70 et. seq. Wis. Stats., with its principal offices located at 230 E. County Road Y, Oshkosh, Winnebago County, Wisconsin 54901 (“the District”). Whereas, City and the District (collectively referred to herein as “the Parties”) have previously entered into agreements for the provision of sanitary sewer and wastewater treatment service (“Services”) by the City to the District; and Whereas, the Parties wish to enter into an updated master agreement with common provisions applicable to all districts served by the City of Oshkosh; Whereas, specific provisions applicable to each individual district shall be incorporated in addendums to each master agreement, with the terms of the master agreement remaining uniform between the districts; and Whereas, the City is not obligated to provide extraterritorial service to the District except through a specific agreement for such services; and Whereas, the City and the District entered into previous agreements for the transportation and treatment of the District wastewater and recognize that the District is currently dependent upon the City for service; and Whereas, the City and District each desire to enter into this Agreement to continue their long-term relationship; and Whereas, in return for the City providing the Services, the District agrees that the District will not promote competition for development or for movement or expansion of existing commercial and industrial concerns located in the City that would be in violation of an existing or amended Cooperative Plan/Agreement between the City and a respective Town and/or Sanitary District; and Page 2 of 36 Whereas, the Parties intend the foregoing provisions are contractual in nature and not to be construed as mere recitals to this Agreement. Now, therefore, the Parties by their duly authorized representatives, agree as follows: I. Term of Agreement. This Agreement shall commence for the billing period beginning October 1, 2025, or alternatively for the next quarterly billing period following the latest date set forth in the signature blocks below, and shall continue through December 31, 2045, and shall continue thereafter, subject to the provisions of Article XIII. II. Acronyms and Definitions. A. Allocated Capacity. The flow capacity allocated to the District in Addendum B. Classes of Flow Capacity: Maximum Hour Flow – the greatest total volume of wastewater during any consecutive 60-minute period expressed in terms of gallons per hour. Maximum Day Flow – the greatest total volume of wastewater during any consecutive 24-hour period expressed in terms of millions of gallons per day. Maximum Week Flow – the greatest total volume of wastewater during any consecutive 7-day period expressed in terms of millions of gallons per day . Maximum Month Flow – the greatest total volume of wastewater during any consecutive 30-day period expressed in terms of millions of gallons per day. Annual Average Daily Flow – the total volume of wastewater over one calendar year divided by 365 expressed in terms of millions of gallons per day. B. CMAR. Compliance Maintenance Annual Report that is required by the WPDES General Permit for City and Satellite Sewage Collection Systems. Page 3 of 36 C. CMOM. Capacity, Management, Operation and Maintenance program that is required by the WPDES General Permit for City and Satellite Sewage Collection Systems. D. Connection Point. The point at which the District’s Collection System discharges to the City’s Collection System. E. Collection System. The individual and combination of infrastructure assets constructed, installed and used for the transmission of sanitary wastewater. These assets include, but are not limited to gravity pipes, manholes, force mains, valves, pump/lift stations with all their components, and associated ancillary assets required to monitor, control and evaluate flow. F. Data Logger. An electronic device that automatically monitors and records environmental parameters over time, allowing conditions to be measured, documented, analyzed, and validated. G. Designated Management Agency. An entity designated in an areawide water quality management plan having responsibility for implementing specific plan recommendations (“DMA”) reviewed and recommended by East Central Wisconsin Regional Planning Commission (“ECWRPC”) and approved by the Wisconsin Department of Natural Resources (“WDNR”). H. District Wastewater Concentration. For purposes of calculating wastewater charges, the following definitions shall apply: Wastewater having organic concentrations of Biochemical Oxygen Demand (BOD5) with an annual average of 250 milligrams per liter (mg/L), Total Suspended Solids (TSS) with an annual average of 250 milligrams per liter (mg/L), Phosphorous (P) with an annual average of 10 milligrams per liter (mg/L), and Ammonia-Nitrogen (NH3-N) with an annual average of 25 milligrams per liter (mg/L). I. EPA. United States Environmental Protection Agency. J. Infiltration. Water that enters a Wastewater System from the ground, including, but not limited to, such sources as defective pipes, pipe joints, connections, or manholes. Page 4 of 36 K. Inflow. Water that enters a Wastewater System through inappropriate connections including, but not limited to, sump pumps, roof leaders, cellar drains, and yard drains. L. Rate of Return. The formula for calculating the Rate of Return is the total annual principal and interest payments for the City’s sewer utility debt in the test year plus an additional 10% of the annual principal and interest payments less the City’s annual depreciation expense for the City’s Wastewater System. The dollar amount is then divided by the net book value of the City’s Wastewater System to arrive at a percentage Rate of Return calculation. M. Residential Equivalent Connection. The Residential Equivalent Connection or “REC” is the formula for calculating the annual discharge of an unmetered domestic residential unit. A Residential Equivalent Connection or “REC “shall be defined as 100 gallons per person per day of average daily flow with Category A domestic strength wastewater concentrations as defined in the City of Oshkosh Municipal Code, Ch. 24. A residential unit shall be defined as 3 people per unit. N. Sewer Service Area. The area presently served or anticipated to be served by a sewage collection system (“SSA”) as reviewed and recommended by East Central Wisconsin Regional Planning Commission (“ECWRPC”) and approved by the Wisconsin Department of Natural Resources (“WDNR”). O. Technical Standards Committee. A committee made up of representatives from the City and the Districts created to discuss matters of a technical nature as described in Article XI. P. Wastewater System. The combination of physical, chemical and biological components used to collect, pump, analyze, measure and treat raw wastewater and dispose of treated wastewater and biosolids in accordance with Federal and State laws, regulations and permit requirements. The Wastewater System includes, but is not limited to, the Collection System and the Wastewater Treatment Facility. Q. Wastewater Treatment Facility. A plant in which a combination of physical, chemical and biological processes are used to treat wastewater Page 5 of 36 and remove pollutants. The Wastewater Treatment Facility for the City is currently located at 233 N. Campbell Road, Oshkosh, WI. R. WDNR. Wisconsin Department of Natural Resources. S. WPDES. Wisconsin Pollution Discharge Elimination System. III. District Boundaries and Service Area. A. Establishment of Boundaries. The boundaries of the District are established in Addendum A, which is incorporated into this Agreement and made a part hereof (“District Boundaries”). These boundaries will be modified by Amendment to reflect Sewer Service Area (“SSA”) amendments and Designated Management Agency (“DMA”) amendments approved by the Wisconsin Department of Natural Resources (“WDNR”) which are within the boundaries of the District or the defined protected town areas set forth in existing or amended Cooperative Plans/Agreements between the City and a respective Town and/or Sanitary District. The City agrees not to unreasonably withhold, delay, or condition its approval of boundary modifications within the District, or defined protected town areas as defined in a Cooperative Plan, which include development anticipated to occur within the Allocated Capacity of the District as defined within Addendum B to this Agreement. City disapproval under this paragraph will be based upon a reasonable determination of the lack of sufficient contracted capacity for flow, load, or strength, the lack of sufficient downstream capacity in the City’s Collection System, or other substantial engineering consideration related to a District’s proposed construction or extension. The boundaries will be similarly amended for annexation and attachment of City service areas under Sections E and F below to reflect sewer service amendments approved by the WDNR which are within the boundaries of the City or the defined City growth areas set forth in existing or amended Cooperative Plans/Agreements between the City and a respective Town and/or Sanitary District. The District agrees not to unreasonably withhold, Page 6 of 36 delay, or condition its approval of boundary modifications within the City or City growth areas as defined in a Cooperative Plan. B. Service Outside of the District Boundary. The City shall provide Services to the District only within the District Boundaries authorized by this Agreement. Except as provided in paragraph A, the City has no obligation to provide Services to any properties not currently located within the District Boundaries and all rights are reserved by the City to decline to provide Services to any properties outside of the District Boundaries as established in Addendum A regardless of any proposed or future changes to the boundaries of the District. C. Connection Point(s). The Connection Point(s) between the District’s Collection System and the City’s Collection System are established in Addendum A. Changes in the Connection Point(s) required for any reason, may be agreed upon by the representatives for the Parties by written Memorandum of Understanding and new Addendums may be attached to the Agreement indicating the changes in Connection Points and date of change. In the case of the City the representative shall be the Director of Public Works, and in the case of the District the representative shall be the District President. A change in the Connection Point(s) shall not require formal amendment of the Agreement between the Parties. D. District Mapping and Connections within the District. The District shall provide to the City maps of current District facilities and connections within the District which shall be updated annually to include any changes to the location of facilities or connections and any additional connections to the system. The maps shall clearly depict how each property is metered. The District may permit additional connections to the District’s Collection System, subject to Section VII(H), provided that such connections are within the District and SSA/DMA boundaries and that the District does not exceed its Allocated Capacity described in Addendum B, which is incorporated into this Agreement and made a part hereof. The District shall Page 7 of 36 submit to the City’s Public Works Director annually, during the month of December, a report showing the total current number of connections to the District’s Collection System. The report shall contain the addresses of the premises served by those connections, the type of land use associated with each connection to the District’s Collection System, and clearly indicate any new connections made to the District’s Collection System occurring during the previous calendar year. E. Currently Existing Atypical Sewer System Connections. The Parties acknowledge that there are various atypical sewer connections within both the City and various districts at the time of entry into this Agreement. The Parties agree that the currently existing atypical sewer connections, shall generally be treated as follows: 1. The Parties agree that those properties that are located within the District but discharge sewage to the City’s Collection System at a point other than a metered Connection Point may continue to discharge sewage directly to the City’s Collection System, provided that the District timely complies with the requirements of Article VII pertaining to Flow Measurement. 2. Those City properties that have been annexed or attached to the City but are still connected to the District’s Collection System shall continue to remain connected to the District’s Collection System, except as these areas may be brought into the City as provided in Paragraph F below or as may be otherwise agreed upon by the Parties. For example, in the case of parcels located within the City currently served by the Town of Algoma Sanitary District No. 1, service by the City may begin immediately upon execution of this Agreement for certain of these parcels, while City service to certain other parcels will occur no earlier than 20 years following execution of this Agreement. 3. The quantity of flow from a user connection shall be determined in accordance with Article VII of this Agreement pertaining to Flow Measurement. Page 8 of 36 F. Annexations/Attachments/Detachments. In accordance with Section 60.79 of the Wisconsin Statutes, the annexation of any parcel within the District detaches the parcel from the District. If at any point an annexation or attachment causes a portion of the District’s Collection System to be bordered by City properties on each side, then the City may acquire the infrastructure assets of the District’s Collection System located within the annexed area as follows: 1. If the sanitary flow through the annexed area connects directly to the City’s Collection System without passing through any other portion of the District’s Collection System and without passing through a District meter, then the City shall acquire all the assets of the District’s Collection System located within the annexed area, including but not limited to pipes, pumps, valves, and manholes. 2. If the sanitary flow through the annexed area cannot connect directly to the City’s Collection System without passing through any other portions of the District’s Collection System or without passing through a District meter, then the District shall continue to own and maintain the infrastructure assets located in the annexed area until the District meter is relocated and/or the Collection System is able to directly connect to City facilities under paragraph 1 above. 3. If the sanitary flow can connect directly to the City’s Collection System or if a majority of the patrons already receiving sewer service within a definable area are City patrons, the City may take over ownership and maintenance responsibilities for the portion of the system within the defined area. At that time, the City shall acquire and maintain all infrastructure assets of the District’s Collection System located within the defined area including, but not limited to, pipes, pumps, valves, and manholes. When the City acquires a portion or all of the District’s Collection System, the following shall apply regarding the infrastructure assets formerly owned by the District: 1. If the assets were financed by a private developer or in any other manner without direct cost to the District, the acquired assets shall be transferred to the City without cost to the City. Page 9 of 36 2. If the assets were a utility financed purchase by District through the issuance of bonds or other debt and said indebtedness remains unpaid, the City shall pay to the District the proportionate share of any remaining indebtedness that is attributable to the purchase of the assets. The City’s payment shall be made either in one sum, or in annual installments of the amount necessary to pay the proportionate share of the principal and interest when due. The District shall apply the moneys received from the City strictly to the payment of the principal and interest due. 3. If the assets were purchased by the District without incurring debt, then the City shall pay to the District the depreciated value, if any, of the assets as identified in the accounts of the District or as reasonably calculated in relation to the anticipated remaining useful life of the assets. 4. The Parties recognize that while the above parameters will generally provide a reasonable means to calculate the value of assets, that there may be circumstances in individual cases that require adjustment to these calculations and the Parties agree to work together in good faith in such cases to reasonably calculate the value of the assets to be acquired. In the case of a dispute, the Parties agree that they may seek the assistance of an independent outside person to assist with the valuation of the assets or mediator. If the Parties are unable to reach agreement, the City may take over the assets and either Party may petition the Wisconsin Public Service Commission to seek resolution of the matter in relation to compensation. Should a detachment occur, the same process and analysis shall apply to allow the District to acquire the infrastructure assets of the City’s Collection System located within the detached area. The Parties agree that they will execute any documents reasonably necessary to facilitate the above transactions including easements, bills of sale, deeds, release of easements, or similar documents. Page 10 of 36 G. Parties’ Assets. Notwithstanding anything to the contrary, the City continues to solely own, operate, maintain and replace its Collection System and Wastewater Treatment Facility, and shall solely bear the cost of any repair or replacement for its Collection System and Wastewater Treatment Facility. The District continues to solely own, operate, maintain and replace its Collection System, and shall solely bear any cost of repair or replacement for its Collection System and any related facilities. H. District Specific Terms. This Agreement is a standard master agreement between the City and each of the sanitary districts it serves. The Agreement establishes foundational terms and conditions that are applicable to all districts. The District may have unique requirements and circumstances regarding service area, asset ownership, or transfer, and as a result, Addendum D is hereby incorporated into this Agreement to delineate District specific terms and conditions. IV. Services to be Provided. A. Wastewater Transportation. The City shall receive wastewater generated within the District Boundaries at Connection Points as provided for in Addendum A. The City shall be responsible for the transportation of the wastewater from the Connection Point(s) through the City’s Collection System to the City’s Wastewater Treatment Facility and shall be responsible for obtaining all permits necessary for operation, maintenance and replacement of its Collection System. The District shall be responsible for the transportation of the wastewater through the District’s Collection System to the Connection Point(s) and shall be responsible for obtaining all permits necessary for operation, maintenance and replacement of its Collection System. B. Wastewater Treatment. The City shall provide treatment of the wastewater from the District at the City’s Wastewater Treatment Facility. The City shall own, operate and maintain the Wastewater Treatment Facility and shall be responsible for obtaining all permits necessary for operation of the Facility and complying with all reporting requirements for the Facility. Page 11 of 36 C. Capacity Allocation. The City shall allocate capacity in its Collection System and its Wastewater Treatment Facility as provided for in Addendum B, which is incorporated into this Agreement and made a part hereof. Each District may also request to purchase additional capacity according to the formula provided in Addendum E. City approval under this paragraph shall not be unreasonably withheld, conditioned, or delayed. The District acknowledges that the capacity allocated to it in Addendum B is calculated as determined as a percentage of the total treatment capacity of the Wastewater Treatment Facility. If, for any reason, there are changes to the total treatment capacity of the Wastewater Treatment Facility, including a change in state or federal regulatory requirements, the District’s capacity in Addendum B shall be adjusted accordingly. Specifically, the District shall maintain their percentage allocation, but the District’s percentage allocation shall now be applied to the new adjusted total treatment capacity of the Wastewater Treatment Facility. Both Parties agree that if any changes occur to the total treatment capacity of the Wastewater Treatment Facility, the City shall provide the District with notice of the revised capacity which shall be determined either by the limits stated in the City’s current WPDES permit or through an engineering study, submitted to and approved by the WDNR if required. The District acknowledges that although its overall capacity is a percentage of the total treatment capacity of the Wastewater Treatment Facility, the District’s capacity may be further constrained at specific Connection Points due to the limitations of the Collection System (including the size of the existing pipes and infrastructure). V. District’s Compliance with Wastewater Regulations. A. District’s Compliance with City’s Wastewater Service Regulations. 1. Waste Characteristics. Characteristics of waste delivered to the City’s Collection System at each connection point must meet the requirements of Chapter 24 of the City of Oshkosh Municipal Code. Page 12 of 36 District wastewater strength may be calculated based on 7 days of consecutive 24-hour flow proportional composite sampling performed annually by a third-party laboratory. The District shall be responsible for paying for the annual testing. Alternatively, at the option of either Party, the District wastewater strength may also be calculated by taking an annual rolling average, which will be calculated based on 7 days of consecutive 24-hour flow proportional composite sampling performed quarterly by a third-party laboratory. Results of the testing will be aggregated with the data collected quarterly over the past twelve months, to calculate an annual average. This annual average will be used to determine District wastewater strength in relation to the definition of Category A set forth in this Agreement. In the event a District desires to use an annual rolling average to calculate wastewater strength, the District shall be responsible for paying for the quarterly testing. In the event the City desires to use an annual rolling average to calculate wastewater strength, the District and City shall equally be responsible for paying for the quarterly testing. 2. Applicability of City Ordinance and Administrative Rules The City’s provision of Services is subject to the District’s compliance with and enforcement of all applicable City ordinances and administrative rules pertaining to protection of the City’s Wastewater System and the prevention of cross connections with any other utility systems. All discharges from the District’s Collection System into the City’s Wastewater System shall be subject to Chapter 24 of the City of Oshkosh Municipal Code and the District’s Board of Commissioners shall adopt and enforce regulations regarding the use of the District’s Collection System that includes the same language as Sections 24-4, 24- 5, 24-6, 24-6.1 through 24-6.4, 24-6.6 and 24-6.7 of the City of Oshkosh Municipal Code, except (1) replacing the word “City” or words “City of Oshkosh” with the name of the Sanitary District, except in the case where the sentence refers to the City’s Wastewater Treatment Plant (Facility) or the City’s Industrial Wastewater Discharge Handbook; (2) replacing the terms “Control Authority” and “Authority” with the term “District’s Board of Commissioners;” and, (3) replacing the term “Utility Page 13 of 36 Operations Manager” with the term “District’s President”. The City reserves its legislative right to amend its ordinances and regulations as it deems prudent or necessary. Unless expressly required by state or federal laws or regulations, or conditions of the City’s WPDES permit, if an amendment to the City’s ordinances would conflict with the terms and conditions of this Agreement the City cannot unilaterally amend its ordinances or administrative rules without first submitting the proposed amendment to the Technical Standards Committee (‘TSC”) for its review and recommendation. However, if the City notifies the TSC of an amendment and the TSC does not provide its recommendation within 30 days of the City’s notification, the City may take action without the TSC’s recommendation. The City agrees that it will not amend its ordinances with the effect of invalidating this Agreement, or unjustly targeting the District. Any amendment to the City’s ordinances are to be made in good-faith with the objective of achieving equitable and comprehensive system-wide regulation. B. Sanitary District Ordinance Applying City Ordinance The District must provide by ordinance that the City’s sewer use ordinance as amended from time to time applies within their jurisdictions, including that all customers within their jurisdictions who require pretreatment of sewage are subject to the provisions of the City’s sewer use ordinance relating to pretreatment. The District shall periodically, and specifically upon request of the City, sample and provide all sampling and test results for all customers within its jurisdiction who are or may be subject to the provisions of the City’s sewer use ordinance relating to pretreatment or as necessary to comply with the District’s or City’s WPDES permit(s). The District shall work with the City to sample and test within their District’s own system as discussed in Article VI of this Agreement, to assure compliance with the pretreatment requirements. Page 14 of 36 Notwithstanding the above, this paragraph shall not limit the Parties’ rights or responsibilities for testing under state and federal law. C. District’s Compliance with State and Federal Regulation. The District shall comply with all State of Wisconsin and Federal laws, regulations and orders concerning wastewater systems. Specifically, the District shall comply with the State of Wisconsin’s General Permit under the WPDES for Satellite Sewage Collection Systems (WI-0047341-06-0 or as may be updated from time to time). The District shall provide the City a copy of the District’s Capacity, Management, Operation and Agreement (CMOM) and the most recent Compliance Maintenance Annual Report (CMAR) within 30 days of the effective date of this Agreement, and any updates to the CMOM and CMAR within 30 days after they are completed. The District shall also provide the City with any notices of violation, administrative orders, consent orders, consent decrees or any written enforcement action taken by the WDNR or the EPA within 10 business days of receipt by the District. Notwithstanding the preceding, the submission of a District’s CMOM or CMAR does not grant the City any right to unilaterally amend a CMOM or a CMAR. District security plans will be redacted if they are included as part of a District’s CMOM or CMAR. VI. Sampling of and Access to District Wastewater. A. Sampling of District Wastewater. The City shall cause periodic sampling and analyses to be conducted, at least annually, of District wastewater. Initial samples will be collected at the connection points. Samples will be collected and analyzed in the same manner that samples are collected and analyzed for the City’s industrial user program. Reports generated from the sampling and analysis shall be provided by the City to the District in a timely manner. If a sample shows high strength waste, or any other condition present in violation of Chapter 24 of the City of Oshkosh Municipal Code, the Parties shall work together to have additional testing completed which may be at points other than the connection point. The District shall pay the City for the sampling and analysis at the same cost and rate as the City’s industrial user program. Page 15 of 36 B. Inspection of District’s Collection System. The District shall conduct periodic inspections of its Collection System to ensure that users of the Collection System are in compliance with all applicable regulations and take appropriate action to correct or cause the correction of any deficiencies in the District’s Collection System. In addition, the District agrees to allow the City, upon a minimum of 14 calendar days’ notice, to inspect the District’s Collection System and review any written or electronic records relating to the physical and video inspection of the collection system, and condition assessments of the District’s wastewater pump stations. The District agrees to provide access to the District’s Collection System and records along with a District employee to facilitate the City’s inspection and review. Inspections of the District’s Collection System by the City will focus on ensuring operational efficiency and safeguarding public health. The City will only request inspection when a compelling need is identified, such as abnormal/excessive flow, deleterious material in flow (i.e. gravel), or other evidence of system failure. In those instances, the City will promptly inform the District of the identified issues and work collaboratively with the District to resolve them. C. Excessive Loads. The District agrees that it will make reasonable efforts to control the collection of wastewater containing any unusual or unusually concentrated presence of deleterious materials and substances or materials and substances that are now, or may in the future be, regulated under Chapter 24 of the City of Oshkosh Municipal Code, the terms of the WPDES permit for the City’s Wastewater System, or EPA regulations. To the extent that such wastes are collected by the District, the District shall either provide pretreatment to remove such materials prior to introduction into the City’s Wastewater System or shall pay the City in accordance with Article VII. D. Inflow and Infiltration. The District agrees that it will make reasonable efforts consistent with best practices in the wastewater sector to limit Inflow and Infiltration into the District’s Collection System and to take action, which is within its authority, to ensure that Inflow and Infiltration will not enter the District’s Collection System. To the extent that the District does not limit Inflow and Infiltration Page 16 of 36 and the District exceeds its Allocated Capacity, the provisions of Article VII shall apply. VII. Rates and Fees / Billing. A. Rates and Fees. The District shall pay to the City wastewater charges as determined by the Common Council, which may include a meter charge, fixed charge, volume charge or such other fees and charges as may be determined by the Common Council. It is the intent of this Agreement that the City shall be fully compensated for the provision of Services to the District. The City shall provide the District with a copy of the analysis at least 30 calendar days prior to consideration by the Common Council to allow the District to review and comment upon the proposed rates. The rate study will be updated each year by entering the previous year’s actual expenses, flows and loadings, and fixed asset values, along with calculating of the rate of return according to the defined formula. The rate study shall be based on the loading levels of the District Wastewater Concentration, as defined in this Agreement. The rate study shall calculate a rate, per pound, for treatment of BOD5, TSS, P, and NH3- N exceeding the District Wastewater Concentration levels. If the District exceeds the District Wastewater Concentration at any connection point, the District shall be charged for that additional exceedance per pound. In calculating the exceedance charge, the District shall receive a credit for any payment the City receives directly from any non-domestic sewage customers participating in the pretreatment program as further detailed below. The City reserves its legislative discretion to modify its own rate structure in the future. Rates will be established through a regular review of the cost of service analysis performed in accordance with industry practices. Generally, rates shall be calculated using a utility-based method with a current Rate of Return. The current rate structure is set forth in Addendum C. New rates shall automatically be included within this Agreement upon approval of the Council and notification to the District. Page 17 of 36 The District may seek review by the Public Service Commission of Wisconsin (“PSC”) under Wis. Stat. § 66.0821(5) for a determination of whether the rates, rules and practices are unreasonable or unjustly discriminatory. The District may only challenge the City’s rates, rules and practices before the PSC if the Agreement is silent on such rates, rules and practices. If at any time the District has a non-domestic sewage customer (a customer who is or may be subject to the provisions of the City’s sewer use ordinance relating to pretreatment or as necessary to comply with the District’s or City’s WPDES permits) within its boundaries, the District agrees that the District shall pay a charge per pound over the pollutant concentrations specified in Chapter 24 of the City of Oshkosh Municipal Code on the wastewater discharged from the non-domestic sewage customer into the District’s collection system. The charge shall be the same as the charge assessed to the non-domestic sewage customers within the City. The charge shall be invoiced to the District directly, unless the District requests the City invoice the non-domestic sewage customer directly. In the event of direct billing to the non-domestic sewage customer, the District shall be responsible for any charges that are unpaid by the non-domestic sewage customer. Nothing in this provision waives, alters, or otherwise modifies the requirement that the District wastewater flow shall not contain pollutant concentrations exceeding those specified in Chapter 24 of the City of Oshkosh Municipal Code at the Connection Point between the District and the City. In that event, the provisions of Section VII(I) shall apply. B. Billing and Flow Measurement. The City shall bill the District for Services based on the quantity of flow entering the City’s Collection System at the Connection Point. If there is more than one Connection Point, the quantity of flow shall be the sum of quantity of flows from all Connection Points. The quantity of flow for the District shall be determined by the City from the following sources, which are listed in the order of priority/use for billing purposes: 1. Wastewater Flow Meters/Integrated Telemetry System Page 18 of 36 2. Wastewater Flow Meters/Data Loggers 3. Temporary Wastewater Flow Meters 4. Residential Equivalent Connection 5. Water Flow Meters If it is determined that any meter is inaccurate or inoperable, the City shall estimate the quantity of flow using a method designed to reasonably calculate the flow for the period including but not limited to extrapolation from temporary flow meters, an average of the previous 6-months of flow for which the meter was deemed to accurately measure flow, or average of other similar user’s flow. For further information regarding the installation and maintenance requirements of the above meters, see Article VII.C-E. In the event there is residential wastewater flow entering the City’s or a District’s Collection System at a Connection Point that is not metered by a wastewater flow meter, that unmetered flow shall be estimated by taking the flow per the Residential Equivalent Connection and multiplying it by the number of unmetered units flowing through the Connection Point. For non-residential flow that is unmetered, the Parties shall meet and agree upon a metering system that shall be installed, including wastewater flow meters or water flow meters, as appropriate. C. Wastewater Flow Meters/Integrated Telemetry System In order to provide more effective flow data for future analysis and planning of system improvements, the District agrees to install flow meters integrated with telemetry systems capable of real-time data transmission to the City at all wastewater flow metering sites as defined below. The District shall maintain, repair and replace the wastewater flow meters and the telemetry systems at all Connection Points where wastewater flow meters are currently installed and shall install wastewater flow meters integrated with telemetry systems at any future proposed Connection Points unless the Parties representatives under Article III-C. agree that installation is impractical, cost prohibitive, or otherwise unnecessary. The City shall review and approve of all proposed wastewater flow meters and telemetry systems. The District shall be responsible for all costs associated with the wastewater flow meters and telemetry systems, their installation, operation, readings, and maintenance. All existing wastewater flow meters shall have the Page 19 of 36 integrated telemetry systems installed within two years of the date of this Agreement. The District shall cause all wastewater flow meters within the District to be calibrated by the meter’s manufacturer, the manufacturer’s authorized representative or other company approved by the City within 90 calendar days of the date of this Agreement, and annually thereafter. A certificate of calibration shall be sent to the City within 14 calendar days of the meter’s calibration. Any meter which cannot be calibrated within the manufacturer’s specified tolerances shall be repaired or replaced by the District within 90 calendar days of the District receiving notice of the inability to calibrate the meter. Repaired meters, replaced meters, and any additional new meters installed by the District or its contractors, shall be subject to written approval by the City’s Director of Public Works. The District shall submit specifications for the replacement and/or new meters, along with plans for installation for the Director of Public Work’s approval. In the event a District has or installs a flow meter, but the Parties’ representatives under Article III-C. agree that installation of the integrated telemetry system specifically would be impractical, the District may install a Data Logger instead. The City shall provide the District with the specific Data Logger the District shall install and the District shall be responsible for all costs associated with the Data Logger, including its installation, readings, and maintenance. D. Temporary Wastewater Flow Meters. Either Party may, during the term of this Agreement, install temporary wastewater flow meters and data loggers within the Collection System to verify flow data or obtain additional information relative to waste characteristics or flow entering a Party’s system from the other Party’s system. Temporary installations shall generally be installed at or near Connection Points, as necessary to verify or replace equipment that may be malfunctioning, or in connection sampling and analysis under Article VI. above Unless otherwise agreed in writing by the Parties, whichever Party is initiating the temporary installation shall be responsible for the installation, readings, and maintenance of the temporary installation. Each Party shall cooperate with and upon request, shall provide to the other Party any necessary authorizations and permits for temporary installations within Page 20 of 36 each Party’s respective facilities. The Parties shall promptly share any data or testing results obtained from temporary installations. E. Non-Residential Water Flow Meters. In the event a water meter is installed on the water source of a non- residential property in the District that does not pass through a wastewater meter for billing purposes, this section shall apply. For sewer flow to be billed by a water meter read, the District and the City shall provide water meter readings to the other Party by the close of business on the 10th day of the following month for billing on a monthly or quarterly basis as may be mutually agreed upon between the City and the District. For purposes of this paragraph the City’s Finance Director and the District President or their authorized representative are authorized to agree to changes in the timing of billing which agreement shall be reduced to writing and attached to Addendum A to this Agreement. The District shall be responsible for all costs associated with the water meters, their installation, readings, and maintenance. The City will not install, inspect, test or participate in the installation, reading or maintenance of water meters without a separate agreement to provide payment for such services. The District shall cause all water meters within the District to be calibrated or tested by the meter’s manufacturer, the manufacturer’s authorized representative or other company approved by the City at least once every 10 years or replaced every 20 years per a schedule approved by the Wisconsin Public Service Commission (WPSC). Further, within 90 days of the date of this Agreement, the District shall ensure that all existing District water meters are compliant with the terms of this agreement. Any meter which cannot be calibrated within the manufacturer’s specified tolerances shall be repaired or replaced by the District within 90 calendar days of the District receiving notice of the inability to calibrate the meter. Repaired meters, replaced meters, and any additional new meters installed by the District or its contractors, shall be subject to the requirements and standards of the WPSC. The Districts shall annually submit documentation relating to the calibration and/or replacement of water meters, along with the engineering design plans for the installation of any new infrastructure, which shall be provided within 14 days. Page 21 of 36 F. Adjustments to Flow for District’s Service of City Parcels. The Parties acknowledge that due to past annexations and other events, the District may currently provide sanitary sewer and/or wastewater treatment service to parcels that are located within the City. Until such time as these parcels are serviced directly by the City as provided in Article III, the District shall continue to provide sanitary sewer service to the City parcels In the event that flow from City properties is combined with District flow prior to being measured by a wastewater flow meter, the flow attributable to the City properties, as measured by REC for residential properties, or water meter readings or otherwise by separate agreement of the Parties for non-residential properties, shall be deducted from the District’s total flow to obtain a billable flow for the District. Each Party agrees to serve all customers in its territory in the same manner. Billing shall be as provided in Article VII or as may be separately agreed by the Parties and incorporated into Addendum D. G. Time of Billing and Payment of Invoices. The City shall issue bills quarterly to the District for the Services being provided pursuant to this Agreement. The District shall pay the City directly within 45 days of the date of the invoice. Late payments are subject to the then-existing late payment charges imposed by the City on other wastewater customers. The District shall be responsible to directly invoice its customers for wastewater services, and the District bears the risk of collection from any District customer. Failure of or delay by any District customer to pay the District shall not relieve the District of its obligation to pay City for the Services. H. Remedies for Exceeding Allocated Capacity The District, in Addendum B, has been allocated flow capacities. The Parties agree to the following tiered system to progressively enforce compliance with allocated capacity and encourage proactive planning. 1. 80% of Allocated Capacity. Whenever the District has actually utilized 80% or more of any class of flow capacity allocation under this Agreement, the City shall promptly notify the District in writing. At such time, the District shall have the option of engaging with the City in a joint planning project, at the cost of the District, to determine whether and under what circumstances there is any reasonable possibility that the Wastewater discharged by the District Page 22 of 36 will exceed the District’s flow capacity allocation, and if so what actions can reasonably be taken by the District to eliminate any such reasonable possibility. The principal burden of formulating the plan shall be on the District, but the City shall fully cooperate with and assist in the formulation of the plan. In the event that the District and City agree upon a plan which will eliminate any such reasonable possibility of exceeding the District’s allocated flow capacity (e.g. the elimination of excess Infiltration and Inflow, or the construction of an appropriately-sized equalization basin, or construction of an interceptor, or the purchase of additional allocated flow capacity), and the District satisfactorily implements such plan, the City shall waive any restrictions imposed under the following subsections unless and until the metered discharge data subsequently demonstrates that the plan is not working as anticipated or that there are unanticipated problems. 2. 90% of Allocated Capacity. Whenever the District has actually utilized 90% or more of any class of flow capacity allocation under this Agreement the City shall promptly notify the District in writing. From and after that time, additional Sewer Extensions tributary to the particular facility in which the District has the flow capacity allocation in question shall not be permitted until such time as the District has satisfactorily demonstrated to the City that full use of any proposed Sewer Extension will not exceed the District’s allocated flow capacity. Upon reasonable written notice, at any time after the District has discharged Wastewater to the Sewer Service Facilities at a level at or above 90% of such District’s allocated flow capacity, the District shall survey or test its Collection Facilities for excess Infiltration and Inflow, and the District shall submit its findings and a plan to address excess flow or any noted deficiencies in the District systems to the City for approval, which shall be granted unless there is a valid engineering rationale otherwise. Upon failure of the District to provide the testing results and a plan to address excess flow, or receive approval of the same from the City, the City may provide notice to the District of the City’s intention to survey or test the collection facilities of the District for excess Infiltration and Inflow or other issues and the District shall grant access to the City to complete such review and testing. The District shall pay the City the cost of any such survey or testing within 60 days of written notice of such cost. Page 23 of 36 3. 95% of Allocated Capacity. Whenever the District has actually utilized 95% or more of any class of flow capacity allocation under this Agreement (or of any associated flow limitation set out in this Agreement or in any associated exhibit), the City shall promptly notify the discharging the District in writing. From and after that time, no additional Sewer Extensions tributary to the facility in which the District has the flow capacity allocation in question shall be permitted by the City and no additional customer connections tributary to the particular facility in which the District has the flow capacity allocation in question shall be permitted by the District, until such time as the District has satisfactorily demonstrated to the City that full use of any proposed customer connection or Sewer Extension will not exceed the District’s allocated flow capacity, including without limitation consideration of future connections of sewered properties that are currently vacant or underutilized. The City shall expeditiously consider any proposed demonstration by a Party that additional customer connections will not exceed the District’s allocated flow capacity allocation. 4. Exceeding Allocated Capacity. Whenever the District has actually exceeded flow capacity allocation under this Agreement, the City shall notify the District in writing. From and after that time, no additional Sewer Extensions or customer connections tributary to the particular facility in which the District has the flow capacity allocation in question shall be allowed under any circumstances until such time as (1) modifications have been made to the District’s sewerage system and/or operations, and the results of such modifications have been in effect for a reasonable period of time to demonstrate satisfactorily that any reasonable possibility of exceeding the District’s flow capacity allocation in the future has been eliminated, or (2) until such time as the District has acquired sufficient additional allocated flow capacity to accomplish the same result. Notwithstanding the tiered structure above, in the event a District’s exceedance of its allocated flow capacity results in damage to, impairment of, or interference with the City’s Wastewater System, the District shall be liable to the City for any expense, loss, or damage occasioned by reason of such exceedance which the City suffers as a result thereof. The City may Page 24 of 36 charge the District its proportionate share for any fine, penalty, or forfeiture incurred by the City, and may also charge the District for any cost incurred by the City (including, without limitation, for employees, equipment, or materials) as a result of such excessive discharge. For any costs claimed, the City shall provide an itemized invoice to the District and will provide information identifying that flow from the District(s) caused or contributed to said damage and/or penalty. The amounts recoverable by the City, if any, are net of grants, reimbursements or insurance proceeds actually recovered by the City. The proportion of costs allocated to charges for exceeding flow is the share of costs that could be allocated to any District for damages that occur due to a District or the City exceeding its Allocated Capacity when the damage occurred and contributed to causing the damage. This cost would only apply to a District that was exceeding its Allocated Capacity when the damage occurred. The portion of cost allocated to each Party corresponds to each Party’s proportion of the total volume of wastewater flow entering the wastewater facility(ies) sustaining the damage at the time the damage occurred. I. Charges for Exceeding Pollutant Loadings. The District wastewater flow shall not contain pollutant concentrations exceeding those specified in Chapter 24 of the City of Oshkosh Municipal Code. If the District’s wastewater flow exceeds the pollutant concentration specified in Chapter 24 of the City of Oshkosh Municipal Code, WPDES regulations, or EPA regulations, the District shall be charged the resulting cost increase for the City to provide necessary treatment or other measures to remove the materials or substances or reduce concentrations to prevent damage to the City’s Wastewater System and maintain pollutant limits in compliance with the City’s WPDES permit. The District acknowledges and agrees that the City may assess against the District the civil penalties as provided in Chapter 24 of the City of Oshkosh’s Municipal Code for violation of that chapter where the District’s wastewater flow exceeds the stated pollutant concentrations. In the case of a monthly or other long-term average discharge limit, penalties shall accrue for each day during the period of the violation. In addition to these civil penalties, the District shall be liable to the City for any expense, loss, or damage occasioned by reason of the District’s wastewater flow which exceeds the pollutant concentrations specified in Chapter 24 of the City of Oshkosh Municipal Page 25 of 36 Code, including, without limitation, any fines to which the City may be subject as a result for violation of its WPDES permit. VIII. Records. Each Party shall keep accurate books, records, and accounts of rate calculations and cases, fees, costs, disbursements, utilities maps, plans and as built drawings, inspections, state reports, and all other matters affecting the substance of this Agreement. Upon reasonable notice, any Party or its agent shall be entitled to examine and inspect the books, records and reports of any other Party for the purpose of verifying charges or credits; verifying inspections and condition of facilities or otherwise exercising or protecting any rights or responsibilities under this Agreement in relation to that Party’s utility system; except that access to private third-party utility accounts shall be limited to non-identified information without a showing of necessity by the requesting Party or order of a court of competent jurisdiction. IX. Audits. A. Cooperation. The Parties agree to cooperate in connection with any internal or governmental investigation or administrative, regulatory, or judicial proceeding (or governmental audit, with respect to matters relating to this Agreement). Such cooperation may include, but shall not be limited to, responding to requests for documents and/or other records, and making employees available to the other Party (or their respective insurers, attorneys or auditors) upon reasonable notice for: (i) interviews, factual investigations, depositions, and providing declarations or affidavits that provide truthful information in connection with any litigation or audit; (ii) appearing at the request of the other Party to give testimony without requiring service of a subpoena or other legal process; (iii) volunteering all pertinent information related to any litigation or audit; and (iv) providing information and legal representations to auditors in a form and within a timeframe requested. B. Expenses. The Party requesting cooperation shall reimburse the other Party for reasonable direct expenses incurred in connection with providing documents and records required under this paragraph and may require Page 26 of 36 such expenses to be documented by receipts or other appropriate documentation. Reasonable direct expenses include costs such as copying, postage and similar costs and witness fees; but do not include wages, salaries, benefits, and other employee compensation. C. Third-Party Proceedings. Notwithstanding the above, in the case of a third-party proceeding in which the Parties are both named as defendants the Parties may or may not elect to enter into a mutually acceptable joint defense agreement. X. Default. In the event that one Party commits a material breach of its obligations under this agreement, the other Party shall provide written Notice of Default to the Party which is deemed to have committed the material breach. The Notice of Default shall specify the Article(s) and Paragraph(s) of this Agreement that is alleged to have been breached, and an explanation of the breach. Unless emergency conditions exist, the Party receiving the Notice shall have 90 calendar days to cure the breach after receipt of the Notice. If the material breach is not cured within 90 calendar days, the Parties agree that Dispute Resolution under Article XII shall be initiated. If a breach is not capable of being cured within 90 days for causes or reasons beyond the breaching Party’s control, the Party may remain in breach for an additional 90 days so long as it has commenced and is taking reasonable actions to cure such breach as promptly as practicable. XI. Technical Standards Committee. A. Creation of TSC. The Parties acknowledge the value of ongoing communications for the purpose of consistently exchanging information about the Wastewater System, the Wastewater Treatment Facility, and the Collection System, as well as the administration of this Agreement (together, the “System”). Therefore, the Parties do hereby establish a committee identified as the Technical Standard Committee (“TSC”). The purpose of the TSC is to facilitate the exchange of information, and (a) to exchange reports and updates regarding the System; (b) to report on System improvements that are anticipated, in progress, or completed; (c) to report on Wisconsin DNR- required facilities plans or Regional Service Area Plan amendments that are anticipated, in progress, or completed; (d) to report on inflow/infiltration Page 27 of 36 and clearwater issues; (e) to exchange and analyze data from water flow meters/dataloggers, sampling, and other operating sources ; (f) discuss reasonable protocols and access to collection systems for inspection, maintenance, testing or other matters; (g) to preview proposed System rates, fees, and billing budgets and initiatives ; (h) to facilitate dispute resolution before invoking the formal dispute resolution options set forth Article XII and (i) to establish and to maintain procedures and protocols for compliance with this Agreement. The Parties further acknowledge that to accomplish the preceding purposes it will be necessary to freely and consistently exchange information in a spirit of cooperation and transparency. B. Composition of the TSC. The TSC will consist of engineering or technical representatives from the City and each District. C. TSC Meetings. The TSC will meet as needed, but at least twice per year. The City’s Director of Public Works, or his or her designee, will prepare and circulate the meeting agenda based on the items submitted by any Party. Except as required by law, the Parties do not contemplate their sessions to constitute a “meeting” under the Chapter 19 of the Wisconsin Statutes. XII. Dispute Resolution. A. Pre-formal Action. Prior to the initiation of any formal action between the Parties, including but not limited to litigation, the Parties agree to meet and confer with regard to any disputes under this Agreement. This requirement may be initiated by either Party by written request delivered to the other Party as provided in Article XXIII. The Parties shall meet and confer within 30 calendar days of the Party receiving the request from the initiating Party. Page 28 of 36 B. Mediation/Arbitration. As a condition precedent to the initiation of litigation the Parties shall engage in formal mediation conducted by a mutually-selected mediator experienced in the topic at issue. The costs of the mediator shall be shared equally. If the Parties are unable to agree on the mediator, the selection shall be made from a panel list submitted by the State of Wisconsin Department of Administration – Municipal Boundary Review by a process of alternate striking from the panel list. C. Formal Action. In the event the Parties are unable to resolve their dispute, either Party may file an action with a court of competent jurisdiction. XIII. Reopeners, Amendments and Extensions of the Agreement A. Amendments/ Reopening of the Agreement. The Parties recognize that wastewater collection and treatment are a highly regulated industry and that capacity and legal requirements may change over the term of the Agreement potentially necessitating reopening of the Agreement. During the term of this Agreement, either Party may request that a section of the Agreement be reopened or amended. The Parties agree that if the request relates to the following, the Parties shall meet and confer on the request and that the Agreement shall be amended as may be agreed upon to adequately address the following conditions: 1. Substantial or material changes in the method for calculating rates for wastewater treatment and services 2. A change in law or permit requirements substantially and materially altering operations under the terms of this Agreement which cannot be adequately addressed within the rate model. 3. A substantial and continuing failure of the District to comply with loading, capacity and flow allocations, as set forth in this Agreement. 4. When significant and/or unforeseen events or circumstances arise substantially and materially affecting operations of either the District or City system which cannot be adequately addressed within the rate model. Page 29 of 36 Upon failure to reach an agreed upon amendment in relation to the above conditions, the Parties agree to engage a mediator to assist in resolution of the necessary amendment. This Agreement may be otherwise amended by the Parties from time to time to address additional issues not within the above categories. However, except as otherwise provided in this Agreement, no amendment, variation or waiver of any term of this Agreement shall be enforceable by any Party unless it is in writing and signed by both Parties. B. Extension of the Agreement. This Agreement shall automatically extend in 5-year increments unless notice of the City’s or District’s desire to renegotiate the agreement shall be provided in writing to the other Party no later than 1 year prior to the original termination date or 1 year prior to the termination date of the extension. C. Early Termination. The District may terminate this Agreement prior to the original termination date or the termination date of any extension with two years prior notice to the City. The City may not terminate this Agreement prior to the original termination date or the termination date of any extension except in the case of material breach/default or failure of dispute resolution, then may only terminate by providing the District two years notice, or as a result of a court order. D. No Reimbursement. Upon termination of this Agreement for any reason, any and all fees, charges, and other payments made by the District to the City shall be non- refundable whether made under this Agreement or any other agreement between the Parties relating to the provision of wastewater transmission or treatment services, whether those fees, charges, or other payments were made for capital investment or for operations and maintenance of the City’s Wastewater System, or for any other reason related the provision of Services including, but not limited to the cost of permits or plan/document review. XIV. Whole Agreement. This Agreement including any written and duly executed amendments thereto contains the entire understanding of the Parties with respect to the subject Page 30 of 36 matter hereof. There are no restrictions, promises, warranties, covenants, or understandings other than those expressly set forth in this Agreement and Amendments executed as provided in this Agreement. This Agreement supersedes all prior negotiations, agreements, and undertakings between the Parties with respect to the subject matter hereof. XV. Liability. The City shall not be responsible or liable to the District for any loss caused by any breakdown or failure of the Collection Systems, Wastewater Treatment Facility or any appurtenant or ancillary assets contemplated by this Agreement. LIABILITY AND HOLD HARMLESS: Subject to any limitations contained in Secs. 893.80, 893.83, 345.05, and any similar statute, of the Wisconsin Statutes, each party (the indemnifying party) agrees to hold the other party, its officers, officials, employees and agents harmless from any and all liability, including claims, demands, losses, costs, damages, and expenses of every kind and description (including death), or damages to person or property arising out of the terms of this Agreement where such liability is founded upon or grows out of the acts or omission of any of the Indemnifying Party’s officers, employees or agents while acting within the scope of their employment. It is the intention of the parties to this Agreement that each party shall be solely responsible for its own actions and activities and the actions and activities of its own officers, employees and agents while acting within the scope of their employment. Further, it is the intention of the parties to this Agreement that each party shall be entitled to rely upon the municipal limitations and immunities available under Wisconsin law, including but not limited to section 345.05, 893.80 and 893.83 of the Wisconsin Statutes and that such damage limits, caps and immunities shall be used to govern all disputes, contractual or otherwise, as they apply to the parties, their agents, officers and employees. XVI. Headings. Headings contained in this Agreement are for convenience of reference only and are not intended to define, limit, or describe the scope or intent of any provision of this agreement. Page 31 of 36 XVII. Counterparts of Agreement. This Agreement may be executed in several counterparts, each of which shall be deemed an original, but such counterparts shall together constitute but one in the same Agreement. Facsimile and electronic signatures shall be deemed original signatures for all purposes of this Agreement. XVIII. Performance Standard. This Agreement requires the Parties to act or to refrain from acting on a number of matters. The Parties hereby acknowledge that this Agreement imposes on them a duty of good faith and fair dealing. In addition, whenever consent or approval is required by a Party, the consent or approval shall not be unreasonably withheld, conditioned, or delayed. In addition, each Party agrees to provide information to assist the other in obtaining the necessary permits from the Wisconsin Department of Natural Resources, or any other governmental authority, for the receipt and provision of wastewater conveyance and treatment service in accordance with this Agreement. XIX. Not Construed Against Any Party. This Agreement is the product of negotiation between the Parties hereto and no term, covenant, or provision herein or the failure to include a term, covenant or provision shall be construed against any Party hereto solely on the basis that one Party or the other drafted this Agreement or any term, covenant, or condition contained herein. The captions appearing in this Agreement are inserted solely for convenience but shall never be considered or given any effect in construing this Agreement if any questions of intent should arise. All terms and words used in this Agreement, whether singular or plural and regardless of the gender thereof, shall be deemed to include any other number and any other gender as the context may require. Unless otherwise explicitly provided in this Agreement, any reference to laws, ordinances, rules, or regulations shall include such laws, ordinances, rules, or regulations as they may be amended or modified from time to time hereafter. XX. No Waiver. Failure of any Party to insist upon the strict performance of terms and provisions of this Agreement, or any of them, shall not constitute or be construed as a waiver or relinquishment of that Party’s right to thereafter enforce such term or provision, and that term of the provisions shall continue in full force and effect. Page 32 of 36 XXI. Severability. If any term, covenant, condition or provision of this Agreement shall be determined to be invalid or unenforceable by a court of competent jurisdiction, the remainder of this agreement shall not be affected thereby. The Parties, in good faith, shall meet and confer and will substitute a valid and enforceable provision as similar as possible to the provision at issue. The remainder of the Agreement shall be valid and enforceable to the fullest extent permitted by law. XXII. Governing Law / Venue. The laws of the State of Wisconsin shall govern the interpretation, construction and provisions relating to service under this Agreement. Winnebago County shall be the venue for all disputes arising under this Agreement. All references to statutes, regulations and ordinances shall include any future renumberings, recodifications or amendments upon passage and publication in compliance with law. XXIII. Notices. All communications or notices required or permitted by this Agreement shall be in writing and shall be deemed to have been given: (i) upon delivery to an officer or the person entitled to such notice, if hand delivered, or (ii) two business days following deposit in the United States Mail, postage prepaid, or with a nationally recognized overnight commercial carrier that will certify as to the date and time of delivery, air bill prepaid, (iii) upon transmission if by facsimile or (iv) upon transmission by email. Any such communication or notice shall be addressed as follows, unless and until any such Party notifies the other in accordance with this section of any change of address: If to the City: City of Oshkosh Department of Public Works 215 Church Avenue Post Office Box 1130 Oshkosh, WI, 54903-1130 Attn: Director of Public Works With a copy to: City of Oshkosh City Attorney’s Office 215 Church Avenue Post Office Box 1130 Oshkosh, WI, 54903-1130 Page 33 of 36 Attn: City Attorney If to the District: Winnebago Area Sanitary District Post Office Box 71 230 E. County Road Y Oshkosh, WI 54901-1404 With a copy to: Dempsey Law Firm, LLP 10 Forest Avenue, Suite 200 Fond du Lac, WI 54935 XXIV. Authority. The persons signing this Agreement warrant that they have the authority to sign as, or on behalf of, the Party for whom they are signing. IN WITNESS WHEREOF, the designated and authorized representatives of the City of Oshkosh and the District, by virtue of directions of their respective governing bodies, have executed this Agreement on the dates indicated below. This Agreement becomes effective as of the latest date of the signatures below. [The remainder of this page is blank. Signature pages to follow] Page 34 of 36 Dated this __________ day of ___________________________, 2025 for the City of Oshkosh, Wisconsin. CITY OF OSHKOSH, WISCONSIN __________________________________________ Rebecca Grill, City Manager __________________________________________ Cheryl Pionke, Interim City Clerk Approved Lynn A. Lorenson, City Attorney Page 35 of 36 Dated this __________ day of ___________________________, 2025 for the Winnebago Area Sanitary District. SANITARY DISTRICT __________________________________________ District President __________________________________________ District Secretary Page 36 of 36 Addendum A – District Boundaries & Connection Points Addendum B – Contractual Flow and Pollutant Loading Addendum C – Current Rate Structure Addendum D – District Specific Terms and Conditions Addendum E – Purchase of Additional Capacity 32 District REC Units 12 District REC Units 4 DistrictREC Units Oshkosh City Limit Oshkosh City LimitOshkosh City Limit Oshkosh City Limit ·YTNUOC"A SHERMAN RD SHERMAN RD BBUUTTLLEERRAAVV PICK ETT AVPICKETT AV SOUTH DRSOUTH DR BUTLER AV BUTLER AV I:\Engineering\Megan\Maps\Sanitary Districts\San Dist Maps\Winnebago Area\Winnebago Addendum A pg 1 of 1.mxd W i n n e b a g o A r e a S a n i t a r y D i s t r i c tWinnebago A r e a S a n i t a r y D i s t r i c t User: megane Sewer ServiceArea Boundary SSA PlanningArea Boundary WinnebagoCounty Parcels WinnebagoArea SanitaryDistrict G REC UnitsDistrict ?Not Served City SanitarySewer District SanitarySewer City of OshkoshMunicipalBoundary Line City of Oshkosh maps and data are intended to be used for general identificationpurposes only, and the City of Oshkosh assumes no liability for the accuracy ofthe information. Those using the information are responsible for verifyingaccuracy. For full disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer ¯ 0 100 200ft Printing Date: 10/13/2025Prepared by: City of Oshkosh, WI 1 in = 200 ft 1 in = 0.04 mi DistrictConnectionPoint to CityMH 1 5-164 2 Last Updated 10-13-2025 Sewer Service Area Boundary andSSA Planning Area Boundary arebased on information from ECWRPC.Hold Areas are not shown. Add endum A page 1 of 1 Maximum Maximum Annual Month Week Maximum Maximum Average Avg Daily Avg Daily Day Hour Daily Flow Flow Flow Flow Flow Designated Management Agency %(MGD)(MGD)(MGD)(MGD)(GAL/HR) Oshkosh WWTP 100%20 35 45 80 4,166,667 Winnebago Area SD 0.10%0.02 0.035 0.045 0.08 4,167 ADDENDUM B City of Oshkosh WWTP Flow Capacity Allocations (in Million Gallons/Day) Note: Flow capacity, particularly at maximum levels, may be limited by the current modelling effort, which may identify sewer capacity issues within the Collection System. BUILDING COMMUNITIES. IT’S WHAT WE DO. September 18, 2025 SEWER USER RATE STUDY UPDATE: City of Oshkosh, WI 2025 Sanitary District User Rate Model Calculations Prepared by: Ehlers N19W24400 Riverwood Drive Waukesha, WI 53188 ADDENDUM C Outside User Rate Calculations 2024 Actual WWTP Flows and Loadings City of Oshkosh, WI Flow (CCF) BOD (Lbs) TSS (Lbs) P (Lbs) NH3-N (Lbs) Inside Customers Residential 900,890 1,798,413 2,248,016 50,580 162,981 Commercial 360,371 719,395 899,244 20,233 65,195 Multi-Family 215,743 430,680 538,350 12,113 39,030 Industrial 134,080 267,659 334,574 7,528 24,257 Municipal & Public 328,668 656,108 820,134 18,453 59,460 Subtotal Inside Customers 1,939,752 3,872,254 4,840,317 108,907 350,923 Outside Customers Algoma SD 260,087 405,627 405,627 16,225 40,563 Sunset SD 4,966 7,745 7,745 310 774 Blackwolf SD 66,220 103,275 103,275 4,131 10,328 Island View SD 19,601 30,569 30,569 1,223 3,057 Edgewood Shangri-la SD 2,889 4,506 4,506 180 451 Winnebago SD 2,800 4,367 4,367 175 437 Subtotal Outside Billable 356,563 556,089 556,089 22,244 55,609 High Strength Industrial Amcor Health Packaging 1,645 70,640 - - Reworld Solutions (FNA Convanta)25,866 1,380 - - Hydrite Chemical Co - - - 21,745 JJ Keller 35 159 - - Kingsbury - - - - Meritor Industrial Products 272 312 2 31 Oshkosh 333 - 35,067 3,147 2,936 Oshkosh 500 Waukau 2,747 812 103 224 Oshkosh 2737 6,370 5,464 171 1,770 Oshkosh Correctional Inst 1700 49,223 8,367 - 543 Oshkosh Correctional Inst 1730 33,254 5,653 - 367 Pepsi Cola 148,663 5,320 24 - Winnebago Co. Landfill - - - 10,131 Winnebago Co. Landfill II- Combined Cells 1,083 - - 22,556 Subtotal High Strength Industrial Billable - 269,159 133,174 3,447 60,304 Wastehaulers Septic Tank Waste 107 6,026 10,044 201 100 Porta Potty Waste 363 10,203 20,406 567 227 Mixed Loads 15,825 88,847 88,847 4,442 12,340 Holding Tank Waste 1,310 4,086 6,538 163 409 Subtotal Wastehaulers 17,606 109,163 125,835 5,374 13,076 Wastewater Treatment Facility Total Billable 2,313,921 4,806,665 5,655,415 139,971 479,911 Inflow/Infiltration (I/I)3,493,461 Total WWTF 5,807,382 Total For Rate Calcs 2,313,921 4,806,665 5,655,415 139,971 479,911 Inside City Customers 1,957,358 4,250,576 5,099,326 117,728 424,302 Inside City and Sanitary Districts 2,308,955 4,798,920 5,647,671 139,661 479,137 (Less Sunset SD) TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 1 Outside User Rate Calculations 2024 Actual Meter Counts City of Oshkosh, WI Meter Size Residential Commerical Multi-Family Industrial Municipal & Public Total 5/8"8,589 216 64 3 7 8,879 3/4"12,441 1,113 69 18 53 13,694 1"180 364 195 26 34 799 1 1/4" 1 1/2"2 131 146 20 33 332 2"152 71 32 80 335 3"41 2 11 39 93 4"17 8 6 19 50 6"4 3 5 12 8"1 1 2 10"11 12" 21,212 2,039 558 116 272 24,197 Meter Size Equiv. Ratio Residential Commerical Multi-Family Industrial Municipal & Public Total 5/8"1 8,589 216 64 3 7 8,879 3/4"1 12,441 1,113 69 18 53 13,694 1"2.5 450 910 488 65 85 1,998 1 1/4"3.75 - - - - - - 1 1/2"5 10 655 730 100 165 1,660 2"8 - 1,216 568 256 640 2,680 3"15 - 615 30 165 585 1,395 4"25 - 425 200 150 475 1,250 6"50 - 200 150 - 250 600 8"80 - 80 - - 80 160 10"125 - - - - 125 125 12"175 - - - - - - 21,490 5,430 2,299 757 2,465 32,441 Total Meters Equivalent Meters TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 2 Outside User Rate Calculations 2024 Final Sewer Utility Expenses City of Oshkosh, WI ACTUAL Sunset Black Island Edgewood Winnebago 2024 Algoma SD Wolf View Shangri-La SANITARY SEWER - 1920 Labor 81,163 Retirement Benefits 11,563 Insurance Benefits 13,733 Contractual Services 394,627 Repairs to Motor Vehicles 0 Maint Mach/Equip/Bldg/Struct 0 Maintenance of Sanitary Sewers 750,000 Maint Mach/Equip/Bldg/Struct 0 Building Rent 550 Interfund Charge Backs 431,588 Chemicals 0 Miscellaneous 46,499 Legal Fees 0 Diesel Fuel 0 Supplies and Repair Parts 0 Sewer Maintenance Supplies 19,896 Safety Equipment 0 Stone/Gravel/Concrete/Asphalt 0 Depreciation 2,451,684 TOTAL SANITARY SEWER 4,201,303 PUMPING STATIONS - 1930 Labor 77,565 X X X X Repair Parts 65,652 X X X X Gas & Oil 1,141 X X X X Heat XXX X Equipment Rental 313 X X X X Postage XXX X Professional Services 22,307 X X X X License & Permit 0 X X X X Office Supplies 364 X X X X Interfund Charge Backs 2,823 X X X X Telephone 3,478 X X X X Chemicals 17,115 X X X X Utility 174,275 X X X X Sewer XXX X Storm Water XXX X Supplies and Repair Parts 8,781 X X X X Power & Light XXX X Insurance 8,575 X X X X Depreciation (Inclduing Forcemains)480,327 X X X X TOTAL PUMPING STATIONS 862,716 XXX X TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 3 DISPOSAL PLANT - 1940 - Liquid Labor 984,993 XXXXX X Retirement Benefits 139,425 XXXXX X Insurance Benefits 205,131 XXXXX X Repair Parts 127,973 XXXXX X Office Supplies 4,066XXXXX X Gas & Oil 5,376XXXXX X Heat XXXXX X Chemicals 804,899 XXXXX X Cont Svcs/Eng & Consulting Fees 380,422 XXXXX X Tools 17,454XXXXX X Other Supplies 29,853XXXXX X Telephone 1,439 XXXXX X Utilities 714,077 XXXXX X Interfund Chargebacks 0 XXXXX X Power & Light XXXXX X Car Allowance 400XXXXX X Conference & Training 7,693XXXXX X Insurance 95,494XXXXX X Depreciation (Incl Interceptor depreciation)1,111,185 XXXXX X Dues 2,602XXXXX X Minor Equipment 1,208XXXXX X Clothing XXXXX X Miscellaneous 3,217 XXXXX X Fees & Permits 22,518XXXXX XXXXXXX TOTAL DISPOSAL PLANT 4,659,425 XXXXX X SOLID DISPOSAL - 1941 Labor 227,500 XXXXX X Retirement Benefits 31,932 XXXXX X Insurance Benefits 53,261 XXXXX X Repair Parts 13,777 XXXXX X Gas & Oil 109XXXXX X Chemicals 113,478 XXXXX X Insurance 20,327XXXXX X Contractual Services 0XXXXX X Depreciation XXXXX X Maintenance 497 XXXXX X Equipment Rental XXXXX X Miscellaneous 190 XXXXX X Special Services 199,991 XXXXX X Uniforms 1,206XXXXX X Landfill Fees XXXXX X Supplies 92,843XXXXX X XXXXX X TOTAL SOLID DISPOSAL 755,111 XXXXX X LABORATORY - 1945 TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 4 Labor 87,380 XXXXX X Retirement Benefits 12,408 XXXXX X Insurance Benefits 26,346 XXXXX X Repairs 957 XXXXX X Chemicals 10,791XXXXX X Other Supplies 292XXXXX X Insurance 7,119XXXXX X Depreciation 95XXXXX X Conference & Training XXXXX X Office Supplies 39XXXXX X Conference & Prof Training XXXXX X Tools & Shop Supplies 8,684 XXXXX X Professional Services XXXXX X XXXXX X TOTAL LABORATORY 154,112 XXXXX X MAINTENANCE - 1946 Labor 543,155 XXXXX X Retirement Benefits 76,614 XXXXX X Insurance Benefits 133,156 XXXXX X Motor Vehicle Expense XXXXX X Contractual Services 4,191XXXXX X Gas & Oil 2,670XXXXX X Minor Equipment 3,953XXXXX X Office Supplies 572XXXXX X Other Supplies 16,536XXXXX X Repairs/Maint 16,880 XXXXX X Insurance 55,365XXXXX X Depreciation 182,063 XXXXX X Clothing XXXXX X Miscellaneous 2,009 XXXXX X Equipment Rental XXXXX X Landfill Fees XXXXX X Interfund Charge Backs 26,394 XXXXX XXXXXXX TOTAL MAINTENANCE 1,063,558 XXXXX X TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 5 GENERAL & ADMINISTRATIVE - 1950 Labor 472,464 Retirement Benefits 103,185 Insurance Benefits 109,910 Acounting Loss/Debt Refinancing Software Supplies Minor Equipment 3,498 Office Supplies/Equipment 7,485 Postage Computer Charges 39,623 Telephone 35,442 Misc Fixed Charges Contractual Services Car Allowance Maintenance Office Equipment 253 Professional Services 99,613 Advertising/Marketing Other Supplies 232 Audit 9,092 Insurance 23,757 Uncollectable Accounts 98 Depreciation 0 Bond Issue Expense 2,269,544 Bond Service Fees 2,500 Bank Fees GASB 68 Pension Exp Conference & Training 650 Dues TOTAL GENERAL & ADMINISTRATIVE 3,177,346 METER READING - 1951 Labor 0 Retirement Benefits 0 Insurance Benefits 0 Meter Repairs 283,890 GASB 68 Pension Exp (7,080) Office Supplies 25,574 Car Allowance 0 Insurance 0 TOTAL METER READING 302,384 PRETREATMENT PROGRAM - 1955 Professional Services 66,760 Licenses & Permits 2,078 Maint Computer 405 Conference/Training 198 Safety Equipment 418 Office Supplies 0 TOTAL PRETREATMENT PROGRAM 69,858 15,245,814 TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 6 Outside User Rate Calculations Sewer System Accumulated Depreciation and Net Book Value City of Oshkosh, WI Capacity Buy-In Original Cost Accumulated Depreciation Net Book Value Color Code 12/31/2024 12/31/2024 12/31/2024 LAND 301,288 1721-00000 PUMPING STATION BLDG.14,039,856 3,704,111 10,335,746 1731-00000 DISPOSAL PLANT STRUCTURE 22,641,068 13,237,563 9,403,505 1734-00000 INTERCEPTING SEWERS 34,859,726 3,928,713 30,931,014 1743-00000 FORCE MAINS 1,825,382 1,167,224 658,158 1725-00000 PUMPING STATION EQUIP.6,309,169 3,928,167 2,381,002 1735-00000 DISPOSAL PLANT EQUIP.20,701,817 15,328,644 5,373,173 1732-00000 TREATMENT - EQUIPMENT 269,991 37,210 232,781 1785-00000 MAINTENANCE EQUIP.162,812 162,812 0 1795-00000 LABORATORY EQUIP.31,146 31,146 0 1788-00000 MOTOR VEHICLES 2,424,520 1,783,382 641,138 1797-00000 RADIOS 1,199,461 1,199,461 0 1726-00000 PUMP. STA. TOOLS & MISC EQUIP.000 1791-00000 OFFICE EQUIPMENT 17,743 17,743 0 1784-00000 TOOLS & MISC. EQUIP.69,385 69,385 0 1729-00000 SOLID DISP. PLANT EQUIP.9,608,881 9,608,881 0 1719-00000 SANITARY SEWERS 87,103,125 21,800,467 65,302,659 1745-00000 SERVICES 11,670,461 486,891 11,183,571 1727-00000 SAN. SEWER TOOLS & MISC. EQUIP 169,734 169,734 0 1738-00000 POWER OPERATED EQUIPMENT 39,176 10,105 29,071 1728-00000 SOLIDS TOOLS & MISC. EQUIP.000 1792-00000 HARDWARE SOFTWARE 452,102 452,102 0 1794-00000 LIQUID TOOLS & MISC. EQUIP.9,869 9,869 0 Totals 213,906,713 77,133,609 136,471,817 Capacity Buy-In Calculation 12/31/2024 Intercepting Sewers 3,928,713 Pumping & Disposal Plant & Equipment 40,085,432 Total 44,014,145 0.1% Buy-in per 0.1% Capacity - WWTP 44,014 Additional Buy-in Lift Stations Lift-Station Cost 8,799,502 0.1% Buy-in per 0.1% Capacity Allocation 8,800 Buy-in per 0.1% Capacity - WWTP & Lift Stations 52,814 Page 7 Outside User Rate Calculations Recovery of Return on Net Investment Rate Base (ROI) City of Oshkosh, WI Depreciation and Rate of Return for Sanitary Districts 2024 Net Asset Value 136,471,817 x ROR 3.90% Return on Investment 5,319,950 2024 Depreciation Expense (Audit)4,225,355 Total Return on Investment + Depreciation 9,545,305 Equivalent Rate of Return for City Customers Debt Service Payments 8,677,550 Debt Coverage 867,755 Total Capital Recovery 9,545,305 Less: Depreciation 4,225,355 Return on Investment 5,319,950 2024 Net Asset Value 136,471,817 Overall Rate of Return 3.90% Breakdown of ROI Into Collection System and Treatment Plant Collection System $77,156,439 Return on Investment (ROI)% 3.90% Collection System ROI for Test Year $3,007,715 Pumping Stations and Forcemains $13,374,905 Return on Investment (ROI)% 3.90% Pumping Station ROI for Test Year $521,381 Treatment Plant and Interceptors (All SD Customers)$45,940,473 Return on Investment (ROI)% 3.90% Treatment Plant and Interceptor ROI for Test Year $1,790,853 Page 8 Outside User Rate Calculations Allocation of Costs to Function City of Oshkosh, WI Conv Flow BOD TSS P NH3-N Cst Cnn 2024 Actual Expenses Conveyance System Flow BOD TSS P NH3-N Billing Meter/Conn Operating & Maintenance Sanitary Sewer Labor 80%10% 10%$81,163 $64,930 $0 $0 $0 $0 $0 $8,116 $8,116 Retirement Benefits 80%10% 10%$11,563 $9,250 $0 $0 $0 $0 $0 $1,156 $1,156 Insurance Benefits 80%10% 10%$13,733 $10,986 $0 $0 $0 $0 $0 $1,373 $1,373 Contractual Services 80%10% 10%$394,627 $315,702 $0 $0 $0 $0 $0 $39,463 $39,463 Repairs to Motor Vehicles 80%10% 10%$0 $0 $0 $0 $0 $0 $0 $0 $0 Maintenance of Sanitary Sewers 80%10% 10%$750,000 $600,000 $0 $0 $0 $0 $0 $75,000 $75,000 Maint Mach/Equip/Bldg/Struct 80%10% 10%$0 $0 $0 $0 $0 $0 $0 $0 $0 Building Rent 80%10% 10%$550 $440 $0 $0 $0 $0 $0 $55 $55 Interfund Charge Backs 80%10% 10%$431,588 $345,270 $0 $0 $0 $0 $0 $43,159 $43,159 Chemicals 80%10% 10%$0 $0 $0 $0 $0 $0 $0 $0 $0 Miscellaneous 80%10% 10%$46,499 $37,199 $0 $0 $0 $0 $0 $4,650 $4,650 Legal Fees 80%10% 10%$0 $0 $0 $0 $0 $0 $0 $0 $0 Diesel Fuel 80%10% 10%$0 $0 $0 $0 $0 $0 $0 $0 $0 Supplies and Repair Parts 80%10% 10%$0 $0 $0 $0 $0 $0 $0 $0 $0 Sewer Maintenance Supplies 80%10% 10%$19,896 $15,917 $0 $0 $0 $0 $0 $1,990 $1,990 Safety Equipment 80%10% 10%$0 $0 $0 $0 $0 $0 $0 $0 $0 Stone/Gravel/Concrete/Asphalt 80%10% 10%$0 $0 $0 $0 $0 $0 $0 $0 $0 Subtotal Sanitary Sewer 80%10% 10%$1,749,619 $1,399,695 $0 $0 $0 $0 $0 $174,962 $174,962 Pumping Stations Labor 90%5% 5%$77,565 $69,809 $0 $0 $0 $0 $0 $3,878 $3,878 Repair Parts 90%5% 5%$65,652 $59,087 $0 $0 $0 $0 $0 $3,283 $3,283 Gas & Oil 90%5% 5%$1,141 $1,027 $0 $0 $0 $0 $0 $57 $57 Heat 90%5% 5%$0 $0 $0 $0 $0 $0 $0 $0 $0 Equipment Rental 90%5% 5%$313 $282 $0 $0 $0 $0 $0 $16 $16 Postage 90%5% 5%$0 $0 $0 $0 $0 $0 $0 $0 $0 Professional Services 90%5% 5%$22,307 $20,076 $0 $0 $0 $0 $0 $1,115 $1,115 License & Permit 90%5% 5%$0 $0 $0 $0 $0 $0 $0 $0 $0 Office Supplies 90%5% 5%$364 $328 $0 $0 $0 $0 $0 $18 $18 Interfund Charge Backs 90%5% 5%$2,823 $2,541 $0 $0 $0 $0 $0 $141 $141 Telephone 90%5% 5%$3,478 $3,130 $0 $0 $0 $0 $0 $174 $174 Chemicals 90%5% 5%$17,115 $15,404 $0 $0 $0 $0 $0 $856 $856 Utility 90%5% 5%$174,275 $156,848 $0 $0 $0 $0 $0 $8,714 $8,714 Sewer 90%5% 5%$0 $0 $0 $0 $0 $0 $0 $0 $0 Storm Water 90%5% 5%$0 $0 $0 $0 $0 $0 $0 $0 $0 Supplies and Repair Parts 90%5% 5%$8,781 $7,903 $0 $0 $0 $0 $0 $439 $439 Power & Light 90%5% 5%$0 $0 $0 $0 $0 $0 $0 $0 $0 Insurance 90%5% 5%$8,575 $7,718 $0 $0 $0 $0 $0 $429 $429 Subtotal Pumping Stations 90% 0% 0% 0% 0% 0% 5% 5%$382,389 $344,150 $0 $0 $0 $0 $0 $19,119 $19,119 Disposal Plant Labor 33% 25% 22% 5% 5% 5% 5%$984,993 $0 $325,048 $246,248 $216,698 $49,250 $49,250 $49,250 $49,250 Retirement Benefits 33% 25% 22% 5% 5% 5% 5%$139,425 $0 $46,010 $34,856 $30,674 $6,971 $6,971 $6,971 $6,971 Insurance Benefits 33% 25% 22% 5% 5% 5% 5%$205,131 $0 $67,693 $51,283 $45,129 $10,257 $10,257 $10,257 $10,257 Repair Parts 33% 25% 22% 5% 5% 5% 5%$127,973 $0 $42,231 $31,993 $28,154 $6,399 $6,399 $6,399 $6,399 Office Supplies 33% 25% 22% 5% 5% 5% 5%$4,066 $0 $1,342 $1,017 $895 $203 $203 $203 $203 Gas & Oil 33% 25% 22% 5% 5% 5% 5%$5,376 $0 $1,774 $1,344 $1,183 $269 $269 $269 $269 Heat 33% 25% 22% 5% 5% 5% 5%$0 $0 $0 $0 $0 $0 $0 $0 $0 Chemicals 57%43%0%$804,899 $0 $458,792 $0 $0 $346,107 $0 $0 $0 Cont Svcs/Eng & Consult Fees 33% 25% 22% 5% 5% 5% 5%$380,422 $0 $125,539 $95,106 $83,693 $19,021 $19,021 $19,021 $19,021 Tools 32% 30% 26% 7% 5%0%$17,454 $0 $5,585 $5,236 $4,538 $1,222 $873 $0 $0 Other Supplies 32% 30% 26% 7% 5%0%$29,853 $0 $9,553 $8,956 $7,762 $2,090 $1,493 $0 $0 Telephone 32% 30% 26% 7% 5%0%$1,439 $0 $460 $432 $374 $101 $72 $0 $0 Water 32% 30% 26% 7% 5%0%$714,077 $0 $228,505 $214,223 $185,660 $49,985 $35,704 $0 $0 Storm Water 32% 30% 26% 7% 5%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Power & Light 33% 34% 21% 5% 7%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Car Allowance 33% 34% 21% 5% 7%0%$400 $0 $132 $136 $84 $20 $28 $0 $0 Conference & Training 33% 25% 22% 5% 5% 5% 5%$7,693 $0 $2,539 $1,923 $1,692 $385 $385 $385 $385 Insurance 33% 25% 22% 5% 5% 5% 5%$95,494 $0 $31,513 $23,874 $21,009 $4,775 $4,775 $4,775 $4,775 Dues 33% 25% 22% 5% 5% 5% 5%$2,602 $0 $859 $651 $572 $130 $130 $130 $130 Allocation Percentages WWTF Customer TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 9 Conv Flow BOD TSS P NH3-N Cst Cnn 2024 Actual Expenses Conveyance System Flow BOD TSS P NH3-N Billing Meter/Conn Allocation Percentages WWTF Customer Equipment Rental 32% 30% 26% 7% 5%0%$1,208 $0 $387 $362 $314 $85 $60 $0 $0 Clothing 43% 25% 22% 5% 5%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Miscellaneous 33% 34% 21% 5% 7%0%$3,217 $0 $1,062 $1,094 $676 $161 $225 $0 $0 Fees & Permits 33% 34% 21% 5% 7%0%$22,518 $0 $7,431 $7,656 $4,729 $1,126 $1,576 $0 $0 Subtotal Disposal Plant 0% 38% 20% 18% 14% 4% 3% 3%$3,548,240 $0 $1,356,455 $726,389 $633,835 $498,554 $137,690 $97,659 $97,659 Solid Disposal Labor 43% 25% 22% 5% 5%0%$227,500 $0 $97,825 $56,875 $50,050 $11,375 $11,375 $0 $0 Retirement Benefits 43% 25% 22% 5% 5%0%$31,932 $0 $13,731 $7,983 $7,025 $1,597 $1,597 $0 $0 Insurance Benefits 43% 25% 22% 5% 5%0%$53,261 $0 $22,902 $13,315 $11,717 $2,663 $2,663 $0 $0 Repair Parts 33% 34% 21% 5% 7%0%$13,777 $0 $4,546 $4,684 $2,893 $689 $964 $0 $0 Gas & Oil 43% 25% 22% 5% 5%0%$109 $0 $47 $27 $24 $5 $5 $0 $0 Chemicals 57%43%0%$113,478 $0 $64,682 $0 $0 $48,796 $0 $0 $0 Insurance 43% 25% 22% 5% 5%0%$20,327 $0 $8,741 $5,082 $4,472 $1,016 $1,016 $0 $0 Contractual Services 43% 25% 22% 5% 5%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Maintenance 33% 34% 21% 5% 7%0%$497 $0 $164 $169 $104 $25 $35 $0 $0 Equipment Rental 33% 34% 21% 5% 7%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Miscellaneous 33% 34% 21% 5% 7%0%$190 $0 $63 $65 $40 $10 $13 $0 $0 Special Services 43% 25% 22% 5% 5%0%$199,991 $0 $85,996 $49,998 $43,998 $10,000 $10,000 $0 $0 Uniforms 43% 25% 22% 5% 5%0%$1,206 $0 $519 $302 $265 $60 $60 $0 $0 Landfill Fees 43% 25% 22% 5% 5%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Adjustment to Audit 43% 25% 22% 5% 5%0%($87,620)$0 ($37,677) ($21,905) ($19,276) ($4,381) ($4,381)$0 $0 Supplies 43% 25% 22% 5% 5%0%$92,843 $0 $39,922 $23,211 $20,425 $4,642 $4,642 $0 $0 Subtotal Solid Disposal 0% 45% 21% 18% 11% 4% 0% 0%$667,491 $0 $301,462 $139,805 $121,738 $76,496 $27,990 $0 $0 Laboratory Labor 30% 35% 15% 10% 10%0%$87,380 $0 $26,214 $30,583 $13,107 $8,738 $8,738 $0 $0 Retirement Benefits 30% 35% 15% 10% 10%0%$12,408 $0 $3,722 $4,343 $1,861 $1,241 $1,241 $0 $0 Insurance Benefits 30% 35% 15% 10% 10%0%$26,346 $0 $7,904 $9,221 $3,952 $2,635 $2,635 $0 $0 Repairs 30% 35% 15% 10% 10%0%$957 $0 $287 $335 $144 $96 $96 $0 $0 Chemicals 30% 35% 15% 10% 10%0%$10,791 $0 $3,237 $3,777 $1,619 $1,079 $1,079 $0 $0 Other Supplies 30% 35% 15% 10% 10%0%$292 $0 $88 $102 $44 $29 $29 $0 $0 Insurance 30% 35% 15% 10% 10%0%$7,119 $0 $2,136 $2,492 $1,068 $712 $712 $0 $0 Office Supplies 30% 35% 15% 10% 10%0%$39 $0 $12 $14 $6 $4 $4 $0 $0 Conference & Training 30% 35% 15% 10% 10%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Tools & Shop Supplies 30% 35% 15% 10% 10%0%$8,684 $0 $2,605 $3,039 $1,303 $868 $868 $0 $0 Professional Services 30% 35% 15% 10% 10%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Subtotal Laboratory 0% 30% 35% 15% 10% 10% 0% 0%$154,017 $0 $46,205 $53,906 $23,103 $15,402 $15,402 $0 $0 Maintenance Labor 43% 25% 22% 5% 5%0%$543,155 $0 $233,557 $135,789 $119,494 $27,158 $27,158 $0 $0 Retirement Benefits 43% 25% 22% 5% 5%0%$76,614 $0 $32,944 $19,154 $16,855 $3,831 $3,831 $0 $0 Insurance Benefits 43% 25% 22% 5% 5%0%$133,156 $0 $57,257 $33,289 $29,294 $6,658 $6,658 $0 $0 Motor Vehicle Expense 43% 25% 22% 5% 5%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Contractual Services 43% 25% 22% 5% 5%0%$4,191 $0 $1,802 $1,048 $922 $210 $210 $0 $0 Gas & Oil 43% 25% 22% 5% 5%0%$2,670 $0 $1,148 $668 $588 $134 $134 $0 $0 Minor Equipment 43% 25% 22% 5% 5%0%$3,953 $0 $1,700 $988 $870 $198 $198 $0 $0 Office Supplies 43% 25% 22% 5% 5%0%$572 $0 $246 $143 $126 $29 $29 $0 $0 Other Supplies 43% 25% 22% 5% 5%0%$16,536 $0 $7,110 $4,134 $3,638 $827 $827 $0 $0 Repairs/Maintenance 43% 25% 22% 5% 5%0%$16,880 $0 $7,259 $4,220 $3,714 $844 $844 $0 $0 Insurance 43% 25% 22% 5% 5%0%$55,365 $0 $23,807 $13,841 $12,180 $2,768 $2,768 $0 $0 Clothing 43% 25% 22% 5% 5%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Miscellaneous 43% 25% 22% 5% 5%0%$2,009 $0 $864 $502 $442 $100 $100 $0 $0 Equipment Rental 43% 25% 22% 5% 5%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Landfill Fees 43% 25% 22% 5% 5%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Interfund Charge Backs 43% 25% 22% 5% 5%0%$26,394 $0 $11,349 $6,598 $5,807 $1,320 $1,320 $0 $0 Subtotal Maintenance 0% 43% 25% 22% 5% 5% 0% 0%$881,495 $0 $379,043 $220,374 $193,929 $44,075 $44,075 $0 $0 General & Administrative Labor 16% 16% 19% 17% 4% 4% 10% 14%$472,464 $75,594 $75,594 $89,768 $80,319 $18,899 $18,899 $47,246 $66,145 Retirement Benefits 16% 16% 19% 17% 4% 4% 10% 14%$103,185 $16,510 $16,510 $19,605 $17,541 $4,127 $4,127 $10,319 $14,446 Insurance Benefits 16% 16% 19% 17% 4% 4% 10% 14%$109,910 $17,586 $17,586 $20,883 $18,685 $4,396 $4,396 $10,991 $15,387 Software Supplies 16% 16% 19% 17% 4% 4% 10% 14%$0 $0 $0 $0 $0 $0 $0 $0 $0 Minor Equipment 16% 16% 19% 17% 4% 4% 10% 14%$3,498 $560 $560 $665 $595 $140 $140 $350 $490 Office Supplies/Equipment 16% 16% 19% 17% 4% 4% 10% 14%$7,485 $1,198 $1,198 $1,422 $1,273 $299 $299 $749 $1,048 Postage 16% 16% 19% 17% 4% 4% 10% 14%$0 $0 $0 $0 $0 $0 $0 $0 $0 Computer Charges 16% 16% 19% 17% 4% 4% 10% 14%$39,623 $6,340 $6,340 $7,528 $6,736 $1,585 $1,585 $3,962 $5,547 Telephone 16% 16% 19% 17% 4% 4% 10% 14%$35,442 $5,671 $5,671 $6,734 $6,025 $1,418 $1,418 $3,544 $4,962 Misc Fixed Charges 16% 16% 19% 17% 4% 4% 10% 14%$0 $0 $0 $0 $0 $0 $0 $0 $0 TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 10 Conv Flow BOD TSS P NH3-N Cst Cnn 2024 Actual Expenses Conveyance System Flow BOD TSS P NH3-N Billing Meter/Conn Allocation Percentages WWTF Customer Contractual Services 16% 16% 19% 17% 4% 4% 10% 14%$0 $0 $0 $0 $0 $0 $0 $0 $0 Car Allowance 16% 16% 19% 17% 4% 4% 10% 14%$0 $0 $0 $0 $0 $0 $0 $0 $0 Maintenance Office Equipment 16% 16% 19% 17% 4% 4% 10% 14%$253 $40 $40 $48 $43 $10 $10 $25 $35 Professional Services 16% 16% 19% 17% 4% 4% 10% 14%$99,613 $15,938 $15,938 $18,926 $16,934 $3,985 $3,985 $9,961 $13,946 Advertising/Marketing 16% 16% 19% 17% 4% 4% 10% 14%$0 $0 $0 $0 $0 $0 $0 $0 $0 Other Supplies 16% 16% 19% 17% 4% 4% 10% 14%$232 $37 $37 $44 $39 $9 $9 $23 $32 Audit 16% 16% 19% 17% 4% 4% 10% 14%$9,092 $1,455 $1,455 $1,727 $1,546 $364 $364 $909 $1,273 Insurance 16% 16% 19% 17% 4% 4% 10% 14%$23,757 $3,801 $3,801 $4,514 $4,039 $950 $950 $2,376 $3,326 Uncollectable Accounts 16% 16% 19% 17% 4% 4% 10% 14%$98 $16 $16 $19 $17 $4 $4 $10 $14 Bank Fees 16% 16% 19% 17% 4% 4% 10% 14%$0 $0 $0 $0 $0 $0 $0 $0 $0 GASB 68 Pension Exp 16% 16% 19% 17% 4% 4% 10% 14%$0 $0 $0 $0 $0 $0 $0 $0 $0 Conference & Training 16% 16% 19% 17% 4% 4% 10% 14%$650 $104 $104 $123 $110 $26 $26 $65 $91 Dues 16% 16% 19% 17% 4% 4% 10% 14%$0 $0 $0 $0 $0 $0 $0 $0 $0 Subtotal General & Administrative 16% 16% 19% 17% 4% 4% 10% 14%$905,302 $144,848 $144,848 $172,007 $153,901 $36,212 $36,212 $90,530 $126,742 Meter Reading Labor 100% 0% $0 $0 $0 $0 $0 $0 $0 $0 $0 Retirement Benefits 100% 0% $0 $0 $0 $0 $0 $0 $0 $0 $0 Insurance Benefits 100% 0% $0 $0 $0 $0 $0 $0 $0 $0 $0 Meter Repairs 100% $283,890 $0 $0 $0 $0 $0 $0 $0 $283,890 GASB 68 Pension Exp 100% 0% ($7,080) $0 $0 $0 $0 $0 $0 -$7,080 $0 Office Supplies 50% 50% $25,574 $0 $0 $0 $0 $0 $0 $12,787 $12,787 Car Allowance 100% $0 $0 $0 $0 $0 $0 $0 $0 $0 Subtotal Meter Reading 2% 98% $302,384 $0 $0 $0 $0 $0 $0 $5,707 $296,677 Pretreatment Program Professional Services 43% 25% 22% 5% 5%0%$66,760 $0 $28,707 $16,690 $14,687 $3,338 $3,338 $0 $0 Licenses & Permits 43% 25% 22% 5% 5%0%$2,078 $0 $893 $519 $457 $104 $104 $0 $0 Books & Periodicals 43% 25% 22% 5% 5%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Maint Computer 43% 25% 22% 5% 5%0%$405 $0 $174 $101 $89 $20 $20 $0 $0 Conference/Training 43% 25% 22% 5% 5%0%$198 $0 $85 $49 $44 $10 $10 $0 $0 Safety Equipment 43% 25% 22% 5% 5%0%$418 $0 $180 $105 $92 $21 $21 $0 $0 Office Supplies 43% 25% 22% 5% 5%0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Subtotal Pretreatment Program 0% 43% 25% 22% 5% 5% 0% 0%$69,858 $0 $30,039 $17,465 $15,369 $3,493 $3,493 $0 $0 Total O & M 22% 26% 15% 13% 8% 3% 4% 8%$8,660,796 $1,888,694 $2,258,052 $1,329,946 $1,141,875 $674,232 $264,861 $387,977 $715,160 Capital Costs Depreciation Sanitary Sewer 80% 0% 0% 0% 0% 0% 10% 10%$2,451,684 $1,961,347 $0 $0 $0 $0 $0 $245,168 $245,168 Pumping Stations 90% 0% 0% 0% 0% 0% 5% 5%$480,327 $432,294 $0 $0 $0 $0 $0 $24,016 $24,016 Disposal Plant 0% 45% 21% 18% 11% 4% 0% 0%$1,111,185 $0 $501,849 $232,736 $202,660 $127,345 $46,595 $0 $0 Solid Disposal 0% 45% 21% 18% 11% 4% 0% 0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Laboratory 0% 30% 35% 15% 10% 10% 0% 0%$95 $0 $29 $33 $14 $10 $10 $0 $0 Maintenance 0% 43% 25% 22% 5% 5% 0% 0%$182,063 $0 $78,287 $45,516 $40,054 $9,103 $9,103 $0 $0 General & Administration 16% 16% 19% 17% 4% 4% 10% 14%$0 $0 $0 $0 $0 $0 $0 $0 $0 Meter Reading 0% 0% 0% 0% 0% 0% 2% 98%$0 $0 $0 $0 $0 $0 $0 0 $0 Pretreatment Program 0% 43% 25% 22% 5% 5% 0% 0%$0 $0 $0 $0 $0 $0 $0 $0 $0 Rate of Return Collection System (Sanitary Sewer)80% 0% 0% 0% 0% 0% 10% 10%$3,007,715 $2,406,172 $0 $0 $0 $0 $0 $300,772 $300,772 Pumping Stations 90% 0% 0% 0% 0% 0% 5% 5%$521,381 $469,243 $0 $0 $0 $0 $0 $26,069 $26,069 Treatment Facility 0% 45% 21% 18% 11% 4% 0% 0%$1,790,853 $0 $808,810 $375,092 $326,619 $205,236 $75,096 $0 $0 Total Capital Costs $9,545,304 $5,269,057 $1,388,975 $653,377 $569,347 $341,694 $130,804 $596,025 $596,025 Subtotal Revenue Requirements $18,206,100 $7,157,751 $3,647,027 $1,983,322 $1,711,222 $1,015,926 $395,665 $984,003 $1,311,185 Other Income Misc Service & Late Charges 23% 19% 15% 13% 5% 3% 11% 11%$0 $0 $0 $0 $0 $0 $0 $0 $0 Pre-Treatment Program 23% 19% 15% 13% 5% 3% 11% 11%$0 $0 $0 $0 $0 $0 $0 $0 $0 Investment Income 23% 19% 15% 13% 5% 3% 11% 11%$0 $0 $0 $0 $0 $0 $0 $0 $0 Total Other Income $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Net Revenue Requirements $18,206,100 $7,157,751 $3,647,027 $1,983,322 $1,711,222 $1,015,926 $395,665 $984,003 $1,311,185 Summary Allocation of Costs to Function and Classification for User Rates TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 11 Conv Flow BOD TSS P NH3-N Cst Cnn 2024 Actual Expenses Conveyance System Flow BOD TSS P NH3-N Billing Meter/Conn Allocation Percentages WWTF Customer Conveyance 2024 Actual Expenses System Flow BOD TSS P TKN Billing Meter/Conn San Sewer, Admin Pretreatment, Meter Reading 70% 2% 2% 2% 0% 0% 10% 13%$8,486,563 $5,912,063 $174,887 $189,472 $169,270 $39,705 $39,705 $817,139 $1,144,322 Pumping Stations 90% 0% 0% 0% 0% 0% 5% 5%$1,384,097 $1,245,687 $0 $0 $0 $0 $0 $69,205 $69,205 Treatment 0% 42% 22% 18% 12% 4% 1% 1%$8,335,439 $0 $3,472,139 $1,793,850 $1,541,952 $976,221 $355,960 $97,659 $97,659 Total 39% 20% 11% 9% 6% 2% 5% 7%18,206,100 7,157,751 3,647,027 1,983,322 1,711,222 1,015,926 395,665 984,003 1,311,185 Legend BOD = Biochemical Oxygen Demand TSS = Total Suspended Solids P = Phosphorus NH3-N = Amonia Nitrogen TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 12 Outside User Rate Calculations Summary of Revenue Requirement City of Oshkosh, WI Revenue Requirement Component Paid By: Prior Year Actual Expenses Conveyance System Flow BOD TSS P NH3-N Billing Meter/Conn San Sewer, Admin Pretreatment, Meter Reading City Customers Only $8,486,563 $5,912,063 $174,887 $189,472 $169,270 $39,705 $39,705 $817,139 $1,144,322 Pumping Stations All Customers except Sunset $1,384,097 $1,245,687 $0 $0 $0 $0 $0 $69,205 $69,205 Treatment All Customers $8,335,439 $0 $3,472,139 $1,793,850 $1,541,952 $976,221 $355,960 $97,659 $97,659 Total $18,206,100 $7,157,751 $3,647,027 $1,983,322 $1,711,222 $1,015,926 $395,665 $984,003 $1,311,185 Page 13 Outside User Rate Calculations Rate Computation Worksheet City of Oshkosh, WI Collection System, Administration, Meter Reading, Pretreatment Rate Calc (City Customers Only) Fixed Charges (Annual) Costs Billable Units Rate 817,139 24,197 $33.77 1,144,322 32,441 $35.27 Equiv Meter/Connection Customer Total Meter Size Ratio Charge Charge Fixed Charge 5/8"1 $35.27 $33.77 $69.04 3/4"1 $35.27 $33.77 $69.04 1"2.5 $88.19 $33.77 $121.96 1 1/4"3.75 $132.28 $33.77 $166.05 1 1/2"5 $176.37 $33.77 $210.14 2"8 $282.20 $33.77 $315.97 3"15 $529.12 $33.77 $562.89 4"25 $881.86 $33.77 $915.63 6"50 $1,763.72 $33.77 $1,797.49 8"80 $2,821.96 $33.77 $2,855.73 10"125 $4,409.31 $33.77 $4,443.08 12"175 $6,173.03 $33.77 $6,206.80 Volumetric Charges Billable Units Charge Type Cost (Cu. Ft or lbs)Rate/Unit Flow Charge per 100 CF $174,887 1,957,358 $0.09 Conveyance Charge per 100 CF $5,912,063 1,939,752 $3.05 BOD Charge per lb.$189,472 4,250,576 $0.04 TSS Charge per lb.$169,270 5,099,326 $0.03 P Charge per lb.$39,705 117,728 $0.34 NH3-N Charge per lb.$39,705 424,302 $0.09 BOD Charge per 100 CF $0.07 TSS Charge per 100 CF $0.05 P Charge per 100 CF $0.02 NH3-N Charge per 100 CF $0.01 Total Volumetric Rate per 100 Cu. Ft $3.29 Charge Type Customer Charge Meter/Connection Charge TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 14 Pumping Stations User Rate Calculations (City, Blackwolf, Island View, Winnebago, Edgewood SD's) Fixed Charges (Annual) Costs Billable Units Rate 69,205 24,197 $2.86 69,205 32,441 $2.13 Equiv Meter/Connection Customer Total Meter Size Ratio Charge Charge Fixed Charge 5/8"1 $2.13 $2.86 $4.99 3/4"1 $2.13 $2.86 $4.99 1"2.5 $5.33 $2.86 $8.19 1 1/4"3.75 $8.00 $2.86 $10.86 1 1/2"5 $10.67 $2.86 $13.53 2"8 $17.07 $2.86 $19.93 3"15 $32.00 $2.86 $34.86 4"25 $53.33 $2.86 $56.19 6"50 $106.66 $2.86 $109.52 8"80 $170.66 $2.86 $173.52 10"125 $266.66 $2.86 $269.52 12"175 $373.32 $2.86 $376.19 Volumetric Charges Billable Units Charge Type Cost (Cu. Ft or lbs)Rate/Unit Conveyance Charge per 100 CF $1,245,687 5,524,723 $0.23 Total Volumetric Rate per 100 Cu. Ft $0.23 Charge Type Customer Charge Meter/Connection Charge TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 15 Treatment Facility User Rate Calculations (All Customers) Fixed Charges (Annual) Costs Billable Units Rate 97,659 24,197 $4.04 97,659 32,441 $3.01 Equiv Meter/Connection Customer Total Meter Size Ratio Charge Charge Fixed Charge 5/8"1 $3.01 $4.04 $7.05 3/4"1 $3.01 $4.04 $7.05 1"2.5 $7.53 $4.04 $11.56 1 1/4"3.75 $11.29 $4.04 $15.32 1 1/2"5 $15.05 $4.04 $19.09 2"8 $24.08 $4.04 $28.12 3"15 $45.16 $4.04 $49.19 4"25 $75.26 $4.04 $79.30 6"50 $150.52 $4.04 $154.56 8"80 $240.83 $4.04 $244.87 10"125 $376.30 $4.04 $380.34 12"175 $526.82 $4.04 $530.86 Volumetric Charges (All Customers) Billable Units Charge Type Cost (Cu. Ft or lbs)Rate/Unit Flow Charge per 100 CF $3,472,139 5,807,382 $0.60 BOD Charge per lb.$1,793,850 4,806,665 $0.37 TSS Charge per lb.$1,541,952 5,655,415 $0.27 P Charge per lb.$976,221 139,971 $6.97 NH3-N Charge per lb.$355,960 479,911 $0.74 BOD Charge per 100 CF $0.58 TSS Charge per 100 CF $0.43 P Charge per 100 CF $0.44 NH3-N Charge per 100 CF $0.12 Total Volumetric Rate per 100 Cu. Ft $2.16 Charge Type Customer Charge Meter/Connection Charge TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 16 Wastehauler Charges Septic Charges Flow Charge per 100 Cu. Ft $0.69 BOD Charge per 100 Cu. Ft $23.46 TSS Charge per 100 Cu. Ft $28.62 P Charge per 100 Cu Ft.$13.68 NH3-N Charge per 100 Cu. Ft $0.78 Total $67.23 Holding Tank Charges Flow Charge per 100 Cu. Ft $0.69 BOD Charge per 100 Cu. Ft $1.30 TSS Charge per 100 Cu. Ft $1.53 P Charge per 100 Cu Ft.$0.91 NH3-N Charge per 100 Cu. Ft $0.26 Total $4.69 Porta Potty Waste Charges Flow Charge per 100 Cu. Ft $0.69 BOD Charge per 100 Cu. Ft $11.73 TSS Charge per 100 Cu. Ft $17.17 P Charge per 100 Cu Ft.$11.40 NH3-N Charge per 100 Cu. Ft $0.52 Total $41.51 Mixed Load Waste Charges Flow Charge per 100 Cu. Ft $0.69 BOD Charge per 100 Cu. Ft $2.35 TSS Charge per 100 Cu. Ft $1.72 P Charge per 100 Cu Ft.$2.05 NH3-N Charge per 100 Cu. Ft $0.65 Total $7.45 Rate Summary City (Inside) Fixed charge per connection $81.08 Rate per 100 Cu. Ft $5.68 BOD rate per lb.$0.418 TSS rate per lb.$0.306 P rate per lb.$7.312 NH3-N Charge per lb. $0.835 TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 17 Outside User Rate Calculations Rate Summary City of Oshkosh, WI Monthly Charges - Sunset Sanitary District Volumetric Rate per 100 Cubic Feet $2.16 Monthly Charges - Algoma Sanitary District Volumetric Rate per 100 Cubic Feet $2.16 Monthly Charges - Blackwolf, Winnebago, Island View, Edgewood Sanitary Districts Volumetric Rate per 100 Cubic Feet $2.38 Summary of Projected Revenues by Sanitary District Annual Revenue Algoma SD $560,723.64 Sunset SD $10,706.12 Blackwolf SD $157,694.93 Island View SD $46,677.43 Edgewood Shangri-la SD $6,879.81 Winnebago SD $6,667.86 Totals $789,349.79 TY2020 Sewer Rate Study City of Oshkosh, WI Prepared 9/18/2025 Page 18 ADDENDUM D This Addendum presents terms that are unique and targeted to the District. These terms are incorporated into and become part of the Agreement. 1. Pursuant to Paragraph 5 of the Winnebago Area Intergovernmental Utility Service Agreement, dated June 10, 2020, this Agreement shall replace the terms of the Winnebago Area Intergovernmental Service Agreement in relation to Sanitary Service in all respects. For the avoidance of doubt, the prior Agreement provided a means for billing based upon water service with an I&I factor adjustment, this Agreement provides that for residential properties that do not flow through a meter a REC will be used. Those properties that will be billed by a REC are identified on Addendum A to this Agreement. Also for the avoidance of doubt, the term of the June 10, 2020 Winnebago Area Intergovernmental Utility Service Agreement, pursuant to Paragraph 5, is hereby amended to coincide with the term of this Agreement. 2. The District currently serves two commercial properties, generally identified as 4060 County Road A, Winnebago, WI 54985 (a postal office) and 4050 County Road A, Oshkosh, WI 54901 (a bait and tackle shop) which they have requested be billed using a REC charge. The City is agreeable to using a REC charge upon review of the annual flow which shall be provided by the District. Further, the District shall notify the City promptly of any change of use for these properties and the City reserves the right require metering (through wastewater or water flow meters) if the usage of either property increases or changes. ADDENDUM E Purchase of Additional Capacity The District may request to purchase additional capacity within the WWTP and WWTP collection system. Requests will be reviewed by the City based upon the current and anticipated system capacity at the time of the request. If the system capacity will support additional capacity from the requesting District, the City may agree and the District will purchase that capacity by taking the amount of accumulated depreciation on all assets that are or will be used by the district, including but not limited to the WWTP, interceptors, force mains and lift stations, and multiplying this amount by the increase in the percentage of capacity in the WWTP and in the lift station or other assets allocated to any District under the new agreement. To the extent that a District may use or benefit from a lift station(s), they will be required to purchase the additional capacity based on the value of the accumulated depreciation on the lift station(s) which would be evaluated at the time of purchase. The District would pay for depreciation expense and return on investment on the undepreciated balance of WWTP and other assets used by the district through its sewer user charges as provided for in the new agreement. In no case shall the City be obligated to enlarge or otherwise modify its collection system or the WWTP to provide for additional capacity. Example Calculation for 0.1 Percent of WWTP Capacity (20,000 gallons per day) with no lift station: Interceptor Sewers – Accumulated Depreciation $ 3,928,713 WWTP – Accumulated Depreciation $40,085,432 Total $44,014,145 x 0.1% Buy-In per 0.1% Capacity Allocation $ 44,014 Additional Buy-in Lift Stations: Lift-Station Cost $8,799,502 X0.1% Buy-In per 0.1% Capacity Allocation $ 8,800 Buy-In per 0.1% Capacity Allocation WWTP & Lift Station $ 52,814 T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Julie Calmes, Finance Director D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Res 25-579 Adopt the 2026 Annual Budget, minus the Grand Opera House (0501-1020), and establish the tax levy for the City of Oshkosh B A C K G R O U N DBACKGROUND Attach ed is a resolu tion to adopt th e 2 0 2 6 An n u al O peratin g Bu dg et, m in u s th e G ran d O pera Hou se (0 5 0 1 -1 0 2 0 ), an d establish th e property tax lev y for th e City of O sh k osh . Th e resolu tion in clu des th e follow in g sch edu les w h ich are attach ed as part of th e approv al: a tax lev y su m m ary, G en eral Fu n d su m m ary; Special R ev en u e Fu n ds su m m ary; an d En terprise Fu n ds su m m ary. We will be adoptin g th e 2 0 2 6 an n u al operatin g bu dget for th e G ran d O pera Hou se (0 5 0 1 - 1 0 2 0 ) by a separate resolu tion . R E C O M M E N D A T I O NRECOMMENDATION Staff recom m en ds th at Cou n cil approv e th e attach ed R esolu tion . A t t a c h m e n t sAttachments Res 25-579 Memo Re Adjustment to 2025 Tax Rate Tax Levy Summary General Fund Summary Special Revenue Funds Summary - updated 11 11 25 Enterprise Funds Summary - updated 11 11 25 11/11/2025 25-579 RESOLUTION                  PURPOSE: ADOPT THE 2026 ANNUAL BUDGET, MINUS THE GRAND OPERA HOUSE (0501-1020), AND ESTABLISH THE PROPERTY TAX LEVY FOR THE CITY OF OSHKOSH INITIATED BY : CITY ADMINISTRATION         WHEREAS, the City Manager has prepared, submitted, and recommended a budget for said city for the year 2026 wherein it lists all anticipated revenues and with expenditures for said year for all departments, except the Grand Opera House (0501-1020), in accordance with the statutes and ordinances; and     WHEREAS, a public hearing on the Annual Budget was held on November 4, 2025, after due and proper notice of said hearing having been given in accordance with the provisions of Section 65.90, Wisconsin Statutes; and     WHEREAS, the Common Council adopted certain resolutions relating to borrowing and levying irrepealable taxes sufficient to pay for such borrowing; and     WHEREAS, it is necessary to levy a property tax in the amount of $47,000,000 to fund the expenses of City government as contained in the 2026 Annual Budget. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh as follows: That the 2026 Annual Budget, a summary of which is attached hereto and made a part hereof, is hereby approved and adopted as the official budget, for the City of Oshkosh, Wisconsin. 1. That the property tax is hereby levied and placed upon the 2025 tax roll as follows: General Fund $25,426,000, Garbage Collection $1,990,000, Library $2,800,000, Ambulance Services $1,400,000, Capital Equipment Fund  $814,500, Debt Service Fund $13,700,000, Grand Opera House $60,000 and Greater Oshkosh Transit $809,500. 2. That the City Clerk and City Finance Director are hereby directed to prepare a tax roll for the City of Oshkosh for the year 2025 according to law, and that the City Manager, City Clerk, and City Finance Director are directed to sign a warrant for the collection of the said tax and affix thereto the corporate seal of the City of Oshkosh. 3. That the City Manager is hereby authorized to delete or create expenditure accounts and to reduce or increase the amounts reflected in the Annual Budget for such expenditure accounts through the transfer of funds between expenditure accounts within the various Departments within the General Fund, provided that the authorized expenditure limit of the General Fund, exclusive of any contingency appropriation, is not exceeded and the 2026 Annual Budget is not increased. 4.   TO: Honorable Mayor and Members of the Common Council FROM: Rebecca N. Grill, City Manager DATE: November 11, 2025 RE: Adjustment to 2025 Tax Rate Due to State Manufacturing Assessments BACKGROUND Each year, the Wisconsin Department of Revenue establishes assessed values for manufacturing properties statewide. These valuations directly impact the City of Oshkosh’s total assessed value and, in turn, the city’s tax rate. Our initial projections, based on discussions with DOR staff, assumed the state’s manufacturing assessments would increase by 18.9% over 2024 values. However, the finalized values came in lower than anticipated – an increase of just 10.6% over 2024 values. Because they came in lower than our earlier estimates, there is a slight impact on the city’s tax rate. CURRENT SITUATION The Department of Revenue’s final manufacturing assessments were lower than anticipated, causing a slight impact on the city’s tax rate. • Preliminary projected tax rate: $7.73 per $1,000 of valuation • Updated projected tax rate: $7.77 per $1,000 of valuation FISCAL IMPACT This adjustment to the tax rate provides funding at the same levy amount approved in the 2025 proposed budget. It does not represent additional spending or an increase in the total tax levy. EFFECT ON TAXPAYERS The average Oshkosh homeowner's city taxes will decrease approximately $84.19. Adopted Change Actual Actual Actual Budget Proposed from 2025 Taxing Fund 2022 2023 2024 2025 2026 Budget Chg % General Fund 22,223,400$ 23,435,500$ 24,020,000$ 20,384,500$ 25,426,000$ 5,041,500$ 24.73% Special Revenue Funds Garbage Collection & Disposal 1,460,400 1,560,000 1,730,000 1,990,000 1,990,000 -$ 0.00% Street Lighting 1,025,000 1,025,000 1,060,300 1,090,600 - (1,090,600)$ -100.00% Museum 970,000 970,000 1,029,100 1,050,000 - (1,050,000)$ -100.00% Senior Services 353,500 353,500 393,000 393,000 - (393,000)$ -100.00% Library 2,792,700 2,792,700 2,876,500 3,400,000 2,800,000 (600,000)$ -17.65% Cemetery 321,000 318,900 328,500 350,000 - (350,000)$ -100.00% Leach Amphitheater 23,000 23,000 23,000 23,000 - (23,000)$ -100.00% Pollock Water Park 64,000 64,000 100,000 260,000 - (260,000)$ -100.00% Rental Inspections 16,500 12,800 - - - -$ 0.00% Ambulance Services - - - 1,660,000 1,400,000 (260,000)$ -15.66% Capital Improvement Funds Equipment Fund 1,100,000 1,088,200 1,205,500 765,500 814,500 49,000$ 6.40% Debt Service Fund 12,733,500 13,277,100 13,897,400 13,400,000 13,700,000 300,000$ 2.24% Enterprise Funds Grand Opera House - - 36,900 170,000 60,000 (110,000)$ -64.71% GO Transit 809,500 809,500 856,600 2,063,400 809,500 (1,253,900)$ -60.77% Total City Tax Levy 43,892,500$ 45,730,200$ 47,556,800$ 47,000,000$ 47,000,000$ -$ 0.00% Change from previous year 1,939,800 1,837,700 1,826,600 (556,800) - % Change from previous year 4.62%4.19%3.99%-1.17%0.00% Adopted Change Actual Actual Actual Budget Proposed from 2025 2022 2023 2024 2025 2026 Budget Chg % Assessed Valuation (TID out)3,781,145,335$ 3,773,745,419$ 3,781,426,502$ 5,774,273,330$ 6,052,497,443$ 278,224,113$ 4.82% Assessed Tax Rate 11.6083$ 12.1180$ 12.5764$ 8.1396$ 7.7654$ (0.3742)$ -4.60% Equalized Valuation (TID out)4,562,703,200 5,032,490,100 5,464,247,100 6,024,732,000 6,195,082,900 170,350,900$ 2.83% Equalized Tax Rate 9.6198$ 9.0870$ 8.7033$ 7.8012$ 7.5867$ (0.21)$ -2.75% Fair Market Ratio 82.87%74.99%69.20%95.84%97.70% Lottery Credit 250.20$ 262.22$ 303.98$ 231.56$ Average Residence 150,000 150,000 150,000 225,000 225,000 Average tax bill 1,741.24 1,817.70 1,886.46 1,831.40 1,747.21 (84.19) -4.60% Change from previous year 70.04 76.46 68.76 (55.06) (84.19) City of Oshkosh Tax Levy 2026 Proposed Budget T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Julie Calmes, Finance Director D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Res 25-580 Adopt the 2026 Annual Budget for the Grand Opera House (0501-1020) B A C K G R O U N DBACKGROUND Attach ed is a resolu tion to adopt th e 2 0 2 6 An n u al O peratin g Bu dg et for th e G ran d O pera Hou se (0 5 0 1 -1 0 2 0 ). R E C O M M E N D A T I O NRECOMMENDATION Staff recom m en ds th at Cou n cil approv e th e attach ed R esolu tion . A t t a c h m e n t sAttachments Res 25-580 Grand Opera House Budget 11/11/2025 25-580 RESOLUTION                  PURPOSE: ADOPT THE 2026 ANNUAL BUDGET FOR THE GRAND OPERA HOUSE (0501-1020) INITIATED BY : CITY ADMINISTRATION         WHEREAS, the City Manager has prepared, submitted, and recommended a budget for said city for the year 2026 wherein it lists all anticipated revenues and with expenditures for said year for the Grand Opera House (0501-1020) in accordance with the statutes and ordinances; and     WHEREAS, a public hearing on the Annual Budget was held on November 4, 2025, after due and proper notice of said hearing having been given in accordance with the provisions of Section 65.90, Wisconsin Statutes; and     WHEREAS, the Common Council adopted certain resolutions relating to borrowing and levying irrepealable taxes sufficient to pay for such borrowing; and NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh as follows:  that the 2026 Annual Budget for the Grand Opera House (0501-1020), a summary of which is attached hereto and made a part hereof, is hereby approved and adopted as the official budget for the Grand Opera House.   T O :T O :Honorable Mayor and Members of the Common Council F R O M :F R O M :Julie Calmes, Finance Director D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Res 25-581 Approve financing for the 2026 Capital Improvement Projects B A C K G R O U N DBACKGROUND Attach ed is a resolu tion to approv e fin an cin g for th e 2 0 2 6 Capital Im prov em en t Projects for th e City of O sh k osh . Th e resolu tion in clu des "Projects & Fu n din g Sou rces by th e Departm en t." Th e su m m ary in clu des projects for 2 0 2 6 th rou g h 2 0 3 5 . How ev er, Cou n cil is on ly bein g ask ed to approv e th e fu n din g for th e 2 0 2 6 projects. Fu n din g for su bsequ en t years' projects w ill be requ ested as part of th e su bsequ en t years' bu dgets. Please con tact m e if you h av e an y addition al qu estion s. R E C O M M E N D A T I O NRECOMMENDATION Staff recom m en ds th at Cou n cil con sider th e attach ed R esolu tion . A t t a c h m e n t sAttachments Res 25-581 2026-2035 Funding Source Summary 2026-2030 Projects and Funding Sources by Dept 11/11/2025 25-581 RESOLUTION                  PURPOSE: APPROVE FINANCING FOR THE 2026 CAPITAL IMPROVEMENT PROJECTS   INITIATED BY : CITY ADMINISTRATION         WHEREAS, the City Manager has prepared, submitted, and recommended a Capital Improvement Plan for the year 2026 wherein is listed all anticipated revenues and expenditures for said year, which has been filed with the Common Council and the City Clerk, and is available for public inspection. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the attached funding for the 2026 Capital Improvement Program is hereby approved.     CIP - Project Detail Sheet City of Oshkosh, Wisconsin FUNDING SOURCE SUMMARY 2026 thru 2030 TotalSource2026 2027 2028 2029 2030 1400-TID Cash 1,075,000600,000 475,000 2000-Trade-In 60,00030,000 30,000 3000-Prior Year Funding-GO 1,233,3001,233,300 3100-Prior Year Funding-Sewer Revenue Bonds 4,815,0003,415,000 1,400,000 3200-Prior Year Funding-Water Revenue Bonds 3,517,6003,517,600 3300-Prior Year Funding-Storm Revenue Bonds 2,100,0001,800,000 300,000 4100-Levy 3,396,500814,500 679,500 622,500 612,500 667,500 4206-FED TRANSIT GRANT 80%44,480,000328,000 8,000 208,000 8,000 43,928,000 4260-Grant 1,700,0001,700,000 4262-State DOT 4,080,6001,883,000 2,197,600 4263-State Grant 1,700,0001,000,000 700,000 4401- GO Debt 145,352,80019,087,100 30,874,800 24,959,900 31,224,000 39,207,000 4402-Debt: State Trust Fund Loan 2,000,0002,000,000 4952-Donations 7,825,0002,600,000 2,400,000 325,000 2,500,000 5273-Sewer Revenue Bonds 95,884,50021,022,200 41,028,000 7,623,900 11,072,400 15,138,000 5275-Safe Drinking Water Loan 45,500,00025,000,000 20,500,000 5275-Water Revenue Bonds 55,044,0004,668,600 8,577,300 19,760,800 20,219,500 1,817,800 5278-Storm Revenue Bonds 23,112,0002,466,500 7,176,600 3,849,000 7,422,700 2,197,200 5280 S/A Replacement-Streets 9,312,8001,959,000 2,247,900 1,023,200 2,306,500 1,776,200 5281 S/A Replacement-Sidewalk 4,763,8001,008,100 1,076,400 437,200 1,248,500 993,600 5284-Water Special Assessments 1,160,000472,700 344,500 334,300 8,500 5285-Wastewater Special Assessments 4,632,3001,270,900 1,353,900 848,700 814,000 344,800 5286-Storm Water Special Assessments 844,100193,100 236,400 122,000 194,800 97,800 5288-Sidewalk Special Assessments 462,50092,500 92,500 92,500 92,500 92,500 5299S-Sewer Utility Fund Balance 3,765,000510,000 720,000 815,000 905,000 815,000 5299SW-Storm Water Utility Fund Balance 3,448,500700,000 743,500 640,000 725,000 640,000 5299T-Transit Fund Balance 169,000107,000 56,000 2,000 2,000 2,000 5299W-Water Utility Fund Balance 9,173,0001,250,000 1,362,000 1,875,000 3,020,000 1,666,000 6000-Carryover from a Prior CIP 1,337,2501,337,250 9000-To Be Determined 51,610,00010,310,000 18,000,000 18,000,000 5,300,000 99,153,350 133,845,300 81,214,000 101,428,500 117,913,400 533,554,550GRAND TOTAL Friday, October 31, 2025Page 1 CIP - Project Detail Sheet City of Oshkosh, Wisconsin PROJECTS & FUNDING SOURCES BY DEPARTMENT 2026 2035thru Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 0130 - Facilities 00A HVAC/RF 750,000 750,000 750,000 750,000FAC: HVAC/Roofing Replacement 7,500,000750,000 750,000 750,000 750,000 750,000750,000 FAC CITY HL 10,000,000 15,000,000FAC: City Hall Renovation 40,000,00015,000,000 FAC FM TRCTR 35,000FAC: FM Commercial Tractor 35,000 FAC FS 15 RP 4,000,000FAC: Fire Station 15 Improvement 4,000,000 FAC FURN RPL 25,000 25,000 25,000 25,000FAC: Office Furniture Replacement 250,00025,000 25,000 25,000 25,000 25,00025,000 FAC LIB VEH 50,000FAC: 1/2-Ton Extended Cab Pick Up 50,000 FAC OCC FRSH 2,000,000FAC: OCC Interior Refresh 2,000,000 FAC OM MCNT L FAC: Oshkosh Media Master Control 75,00075,000 FAC OM TV SEFAC: Oshkosh Media TV Studio Equipment 70,00070,000 FAC OPM STR G 2,800,000FAC: OPM Artifact Storage Facility 2,800,000 FAC TR ADMIN 50,000,000FAC: Transit Admin Offices 50,000,000 FAC VEH1FAC: 001 1/2-Ton Pickup Truck 53,00053,000 FD LND 16 750,000OFD Land for Station 16 750,000 FD ST 16-19 280,000Fire Stations 16-19 Restroom and/or Kitchen 280,000 FS 16 REPL 5,000,000 4,000,000FAC: Fire Station 16 Replacement 9,000,000 FS 17 RENOFAC: Fire Station 17 Renovation 3,120,0003,120,000 FS 18 RENOFAC: Fire Station 18 Renovation 3,276,0003,276,000 FS 19 RENOFAC: Fire Station 19 Renovation 3,440,0003,440,000 GOH ANNEX 4,825,000 4,790,000FAC: GOH Annex Renovation 9,615,000 JNT TRN CNTR 2,000,000 4,000,000FAC: Joint Public Safety Training Center 10,000,0004,000,000 OM GM CEQ 80,000FAC: OM Gov Mtg Coverage Equip 80,000 OM VANFAC: Oshkosh Media Mini-Van 38,00038,000 OPM LAND IMPFAC: OPM Landscape Improvements 450,00050,000 350,000 50,000 OPM LBY IMP 2,800,000FAC: OPM Lobby Improvements 2,800,000 OPM SWYR 425,000FAC: OPM Sawyer House Windows 425,000 Friday, October 31, 2025Page 1 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 6,0002000-Trade-In 3,000 3,000 580,00025,000 60,000 60,000 25,000 105,0004100-Levy 25,000 100,000 130,000 25,000 25,000 40,000,00040,000,0004206-FED TRANSIT GRANT 80% 62,506,0009,680,000 7,940,000 4,750,000 8,550,000 17,550,0004401- GO Debt 3,920,000 4,426,000 4,190,000 750,000 750,000 2,000,0002,000,0004402-Debt: State Trust Fund Loan 5,050,0002,600,000 2,400,0004952-Donations 50,000 40,070,00010,070,000 15,000,000 15,000,0009000-To Be Determined 150,212,00014,305,000 20,470,000 19,810,000 23,575,000 57,655,0000130 - Facilities Total 3,945,000 4,529,000 4,373,000 775,000 775,000 OPM TRCTRFAC: OPM Commercial Tractor 35,00035,000 OSC S DIG SN 70,000OSC S Digital Sign 70,000 150,212,00014,305,000 20,470,000 19,810,000 23,575,000 57,655,0000130 - Facilities Total 3,945,000 4,529,000 4,373,000 775,000 775,000 0211 - Police 1,140,000290,000 850,0004401- GO Debt 1,140,000290,000 850,0000211 - Police Total PD EQUIP 850,000PD: CCOV Equipment 850,000 PD TRRVPD: Tactical Response & Recovery Veh 290,000290,000 1,140,000290,000 850,0000211 - Police Total 0230 - Fire FIRE AMB 1,450,000 1,930,000FIRE: Replace Ambulances 5,940,0002,560,000 FIRE CPR 530,000FIRE: CPR 530,000 FIRE DRY THM 37,000FIRE: Drysuits and Thermals 37,000 FIRE DTRAFIRE: Dive Team Response Apparatus 200,000200,000 FIRE ENGINES 2,179,350 1,232,000 1,300,000 1,400,000FIRE: Replace Engines 8,321,3502,210,000 FIRE EXTFIRE: Extrication Tools 110,000110,000 FIRE HAZ HAL 190,000FIRE: Hazmat Hauler 190,000 FIRE MNTR AEFIRE: Replace Cardiac Monitors & AEDs 1,500,0001,500,000 FIRE RADIOSFIRE: Replace Radios 1,000,0001,000,000 FIRE SCBAFIRE: SCBAs 1,000,0001,000,000 Friday, October 31, 2025Page 2 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 37,00037,0004100-Levy 20,899,1001,375,800 3,466,300 2,549,000 1,751,000 3,528,0004401- GO Debt 438,000 2,387,000 2,880,000 2,018,000 506,000 1,037,2501,037,2506000-Carryover from a Prior CIP 21,973,3502,413,050 3,503,300 2,549,000 1,751,000 3,528,0000230 - Fire Total 438,000 2,387,000 2,880,000 2,018,000 506,000 FIRE TO GEAR 113,700 182,300 261,000 117,000FIRE: Turn Out Gear 2,302,000139,000 234,000 300,000 425,000 300,000230,000 FIRE VEHS 120,000 72,000 81,000FIRE: Other Vehicles 723,00084,000 87,000 93,000 96,00090,000 HOSE REPLFIRE: Hose Replacement 120,000120,000 21,973,3502,413,050 3,503,300 2,549,000 1,751,000 3,528,0000230 - Fire Total 438,000 2,387,000 2,880,000 2,018,000 506,000 0410 - Utility Infrastructure 00A ASPHALT 450,000 425,000 425,000 425,000UI: Asphalt Program (Annual)4,350,000500,000 425,000 425,000 425,000 425,000425,000 00A CONCRT 522,000 285,000 285,000 285,000UI: Concrete Pavement Repairs (Annual)3,087,000285,000 285,000 285,000 285,000 285,000285,000 00A ENV SVR 305,000 405,000 405,000 405,000UI: 20-91 Up-Front Engineering Services 3,950,000405,000 405,000 405,000 405,000 405,000405,000 00A I&I LEAK 750,000 1,000,000 1,500,000 1,500,000UI: Inflow/Infiltration Removal 13,250,0001,000,000 1,500,000 1,500,000 1,500,000 1,500,0001,500,000 00A LEADSRV 100,000 100,000 100,000 100,000UI: Misc. Utility-Owned Lead Service Repl.1,000,000100,000 100,000 100,000 100,000 100,000100,000 00A SS/SWLAT 525,000 525,000 525,000 525,000UI: Mini Storm Sewers/Storm Laterals 5,250,000525,000 525,000 525,000 525,000 525,000525,000 00A SW NOI 70,000 70,000 70,000 70,000UI: New Sidewalk Ordered In 700,00070,000 70,000 70,000 70,000 70,00070,000 00A SW REHAB 825,000 900,000 1,100,000 1,100,000UI: Sidewalk Rehab & Reconst Prog 10,425,0001,000,000 1,100,000 1,100,000 1,100,000 1,100,0001,100,000 00A SW SUBDV 30,000 30,000 30,000 30,000UI: Subdivision Sidewalk Agreements 300,00030,000 30,000 30,000 30,000 30,00030,000 25 JKSN/OR 50,000 5,351,600UI: Jackson Street/Oregon Street Reconstruction 5,401,600 26 CLAIRVLLE 2,649,900 2,054,100UI: Clairville Road Swr & Wtr Ext 4,704,000 26 FLUOR CT 160,300UI: Fluor Court Wtr Mn Repl 160,300 26 JOSSLYN 1,248,700UI: Josslyn Street Wtr Mn Repl 1,248,700 26 OHIO ST 4,329,000UI: Ohio St Reconstruction 4,329,000 26 SCOTT AVE 4,767,300UI: Scott Ave Reconstruction 4,767,300 26 W 12TH AV 1,418,400UI: W 12th Avenue Reconstruction 1,418,400 26 W 16TH AV 6,135,000UI: W 16th Ave Reconstruction 6,135,000 26-01 BOWEN 200,000 9,978,100UI: Bowen St Reconstruction 10,178,100 27 LAKEVW PS 143,500 876,000 5,000,000UI: Lakeview San Pump/SW Lift Station Replacement 6,019,500 27 MONTCLAIR 509,400UI: Montclair Place Wtr Mn Repl 509,400 27 OAKWOOD 863,900UI: Oakwood Road Wtr Mn Repl 863,900 27 SCOTT AVE 3,503,800UI: Scott Ave Reconstruction 3,503,800 Friday, October 31, 2025Page 3 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 27 SW OUTFLL 775,000UI: WWTP SW Outfall Construction 775,000 27 W 14TH AV 6,848,400UI: W 14th Ave Reconstruction 6,848,400 27 WRIGHT 3,556,600UI: Wright St Reconstruction 3,556,600 28 BOWEN STUI: Bowen St Reconstruction 3,515,5003,515,500 28 GALLUPUI: Gallups-Merritts Creek Watershed 1,500,0001,500,000 28 GRAND STUI: Grand Street Reconstruction 752,200752,200 28 HUDSON AVUI: Hudson Avenue Reconstruction 1,792,0001,792,000 28 MADISONUI: Madison Street Reconstruction 1,446,9001,446,900 28 MILL STUI: Mill St Reconstruction 712,600712,600 28 PLEASANTUI: Pleasant Street Reconstruction 1,446,9001,446,900 28 STH 91UI: STH 91 Utility Construction 3,693,6003,693,600 28LakeShorDrImplementation of Lake Shore Drive Reimagination 2,700,0002,700,000 29 ANCHOR 959,000UI: Anchorage Watershed RR-Libbey Storm Sewer 1,009,00050,000 29 BOWEN ST 5,856,600UI: Bowen St Reconstruction 5,856,600 29 MERRITT 17,676,100UI: Merritt Ave Reconstruction 18,176,100500,000 30 S WASH 1,895,000UI: S Washburn Asphalt Const-W Waukau 1,895,000 30 VAN BUREN 200,000 1,000,000 3,535,600UI: Van Buren Avenue Reconstruction 4,735,600 30 W 19TH AV 2,938,000UI: West 19th Avenue Reconstruction 2,938,000 30 WDLD 2,755,300UI: Woodland Ave Reconstruction 2,755,300 31 FERNAU 50,000UI: Fernau Watershed Detention Basin (Hoffmaster) 5,050,0005,000,000 31 S MAIN 550,000UI: S Main St Reconstruction 14,664,10014,114,100 31 WDLD-HIGHUI: Woodland Ave Reconstruction 1,302,5001,302,500 32 JEFFERSONUI: Jefferson Street Reconstruction 8,214,9008,214,900 32 N EAGLEUI: N Eagle St Reconst 3,725,1003,725,100 33 N SAWYERUI: N Sawyer St Reconstruction 7,370,2007,370,200 33 OSH/SAWY 600,000 475,000UI: Oshkosh Avenue - Sawyer Street Intersection 6,000,0004,925,000 33 W 4TH AVEUI: W 4th Avenue Reconstruction 2,785,0002,785,000 34 NEBRASKAUI: Nebraska Street Reconstruction 3,477,9003,477,900 34 W 9TH AVE 300,000UI: W 9th Ave Reconstruction 10,875,100500,000 10,075,100 35 LIBBEY AVUI: Libbey Avenue Reconstruction 3,265,0003,265,000 35 W 6TH AVEUI: West 6th Avenue Reconstruction 3,360,9003,360,900 35 WESTERNUI: Western Street Reconstruction 7,655,3007,655,300 235,402,30025,229,100 33,980,300 22,024,700 40,283,300 15,913,9000410 - Utility Infrastructure Total 24,856,600 16,880,000 19,520,200 17,993,000 18,721,200 Friday, October 31, 2025Page 4 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 6,000,000600,000 475,0001400-TID Cash 4,925,000 1,233,3001,233,3003000-Prior Year Funding-GO 1,435,0001,435,0003100-Prior Year Funding-Sewer Revenue Bonds 3,517,6003,517,6003200-Prior Year Funding-Water Revenue Bonds 1,500,0001,500,0003300-Prior Year Funding-Storm Revenue Bonds 3,087,000499,500 287,500 287,500 287,500 287,5004100-Levy 287,500 287,500 287,500 287,500 287,500 4,080,6001,883,000 2,197,6004262-State DOT 52,021,2002,595,100 4,991,300 6,375,600 6,938,800 4,815,7004401- GO Debt 5,354,000 5,739,000 4,052,300 5,574,300 5,585,100 38,529,3003,382,200 5,728,000 3,678,900 7,802,400 2,590,8005273-Sewer Revenue Bonds 3,366,600 3,000,700 2,621,500 3,212,000 3,146,200 34,363,4001,818,600 7,352,300 3,885,800 8,459,500 1,637,8005275-Water Revenue Bonds 2,695,600 1,681,900 1,932,000 2,382,800 2,517,100 37,589,6002,466,500 6,201,600 3,429,000 7,422,700 1,767,2005278-Storm Revenue Bonds 8,389,200 1,858,200 1,637,900 1,845,900 2,571,400 15,927,3001,959,000 2,247,900 1,023,200 2,306,500 1,776,2005280 S/A Replacement-Streets 1,509,400 1,200,400 1,181,100 1,480,300 1,243,300 9,806,2001,008,100 1,076,400 437,200 1,248,500 993,6005281 S/A Replacement-Sidewalk 980,700 1,025,000 970,100 1,013,800 1,052,800 1,298,800472,700 344,500 334,300 8,5005284-Water Special Assessments 97,500 6,800 34,500 6,784,5001,270,900 1,353,900 848,700 814,000 344,8005285-Wastewater Special Assessments 496,800 372,200 217,700 475,800 589,700 1,328,500193,100 236,400 122,000 194,800 97,8005286-Storm Water Special Assessments 76,800 105,800 58,100 118,100 125,600 925,00092,500 92,500 92,500 92,500 92,5005288-Sidewalk Special Assessments 92,500 92,500 92,500 92,500 92,500 6,775,000430,000 705,000 705,000 705,000 705,0005299S-Sewer Utility Fund Balance 705,000 705,000 705,000 705,000 705,000 6,375,000615,000 640,000 640,000 640,000 640,0005299SW-Storm Water Utility Fund Balance 640,000 640,000 640,000 640,000 640,000 1,625,000140,000 165,000 165,000 165,000 165,0005299W-Water Utility Fund Balance 165,000 165,000 165,000 165,000 165,000 1,200,000200,000 1,000,0009000-To Be Determined 235,402,30025,229,100 33,980,300 22,024,700 40,283,300 15,913,9000410 - Utility Infrastructure Total 24,856,600 16,880,000 19,520,200 17,993,000 18,721,200 0420 - Engineering 145,00070,0004401- GO Debt 75,000 145,00070,0000420 - Engineering Total 75,000 ENG VEH1 70,000ENG: 4WD 1/2-Ton Pickup Trucks 145,00075,000 145,00070,0000420 - Engineering Total 75,000 Friday, October 31, 2025Page 5 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 0430 - Street Division 40,00040,0004100-Levy 16,290,0001,050,000 2,930,000 1,625,000 1,505,000 1,625,0004401- GO Debt 2,180,000 875,000 1,135,000 1,650,000 1,715,000 16,330,0001,090,000 2,930,000 1,625,000 1,505,000 1,625,0000430 - Street Division Total 2,180,000 875,000 1,135,000 1,650,000 1,715,000 CG EQP2 40,000CG: Field Ops Facility Air Compressor 40,000 STR EQP01 300,000STR: Snow Blower/Loader Attachment 600,000300,000 STR EQP02 35,000STR: Trailered Air Compressors 75,00040,000 STR EQP03STR: #239 Stainless Tanker Semi-Trailer 110,000110,000 STR EQP04 145,000STR: #237 Lowboy Trailer 145,000 STR EQP05 100,000STR: #232 Dump Trailer 100,000 STR EQP06 55,000STR: #263 Asphalt Patch Trailer 55,000 STR EQP07 90,000STR: Asphalt/Finish Rollers 130,00040,000 STR EQP08STR: Field Ops Facility Brine Maker 400,000400,000 STR EQP1 20,000STR: Replace Trailers 165,00020,000 30,000 20,000 50,00025,000 STR EQP3 500,000 500,000STR: Replace Articulated Loaders 2,500,000500,000 500,000 500,000 STR EQP6 85,000STR: Replace Sidewalk Tractors 255,00085,00085,000 STR VEH01 1,150,000 400,000 425,000STR: Replace Tandem-Axle Plow Trucks 4,500,000400,000 850,000 425,000 425,000425,000 STR VEH02 725,000 400,000 400,000STR: Replace Single-Axle Trucks 2,750,000375,000 425,000 425,000 STR VEH03 250,000STR: Replace Semi-Tractors 250,000 STR VEH04 110,000 130,000STR: Skid Steers 390,000150,000 STR VEH05STR: Replace Motor Graders with Wing 1,800,000600,000 600,000 600,000 STR VEH06 405,000STR: Excavators 680,000275,000 STR VEH07 225,000STR: #21 Single-Axle Mason TRK w/Crane 225,000 STR VEH08STR: #175 Tractor with Plow & Mower 220,000220,000 STR VEH1 110,000 120,000STR: 1-Ton 4-Wheel Drive Dump Trucks 350,000120,000 STR VEH2 140,000 140,000 70,000 80,000STR:4-Wheel Drive Pickup Trucks 590,00080,000 80,000 16,330,0001,090,000 2,930,000 1,625,000 1,505,000 1,625,0000430 - Street Division Total 2,180,000 875,000 1,135,000 1,650,000 1,715,000 0450 - Central Garage CG EQP1 90,000CG: #108 Adv Ride-On Floor Scrubber 90,000 CG EQP4 250,000CG: Radio System Analog to Digital 250,000 CG VEH1 200,000CG: #36 Single-Axle Pickup Truck 200,000 Friday, October 31, 2025Page 6 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 605,000540,0004401- GO Debt 65,000 605,000540,0000450 - Central Garage Total 65,000 CG VEH2CG: #121 Forklift 65,00065,000 605,000540,0000450 - Central Garage Total 65,000 0470 - Sanitation 2,555,000325,000 425,000 425,000 450,000 450,0004401- GO Debt 480,000 2,555,000325,000 425,000 425,000 450,000 450,0000470 - Sanitation Total 480,000 SANI VEH1 425,000 450,000 450,000SAN: Automated Side-Load Refuse Trucks 2,230,000425,000 480,000 SANI VEH2 325,000SAN: Rear-Load Refuse Trucks 325,000 2,555,000325,000 425,000 425,000 450,000 450,0000470 - Sanitation Total 480,000 0480 - Recycling 3,204,0001300-Cash-Fund Balance 780,000 488,000 1,456,000 480,000 3,204,0000480 - Recycling Total 780,000 488,000 1,456,000 480,000 RECY EQP1REC: Roll-Off Containers 38,00038,000 RECY EQP2REC: #111 Articulated Loader 480,000480,000 RECY EQP3REC: #222 Yard Waste Grinder 480,000480,000 RECY VEH1REC: #221 Hook-Lift Roll-Off Container Truck 300,000300,000 RECY VEH2REC: Automated Side-Load Refuse Trucks 1,906,000450,000 1,456,000 3,204,0000480 - Recycling Total 780,000 488,000 1,456,000 480,000 0610 - Parks Dept - General PK TE TRLS 20,100 26,400PRKS: 426, 429 Towmaster Equipment Trailers 46,500 PK WNG MOW 153,400 164,400 169,900PRKS: Wing Mower Fleet 487,700 PK Z TRN MOW 162,100 88,800 91,800PRKS: Zero Turn Mowers 931,70085,800 94,700 97,700 103,600 106,600100,600 Friday, October 31, 2025Page 7 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 4,450,62024,600 939,000 332,900 679,200 492,7004401- GO Debt 431,300 307,100 402,700 499,800 341,320 4,450,62024,600 939,000 332,900 679,200 492,7000610 - Parks Dept - General Total 431,300 307,100 402,700 499,800 341,320 PRK CAT EXCTPRKS: 441 Caterpillar 305EB M Excavator 153,600153,600 PRK CAT LDR 148,800PRKS: 440 CAT M908 Compact Loader 148,800 PRK DMP TRK 229,400PRKS:CNG Dump Truck 404,400175,000 PRK EQ2 144,000PRKS: 442 John Deere Tractor/Loader 144,000 PRK EQP1 32,100PRKS: Athletic Field Groomer 118,20042,400 43,700 PRK EQP3PRKS: 443 Cat Track Skidsteer 136,000136,000 PRK FRKLFTPRKS: 445 FG25T-16 Forklift 33,00033,000 PRK JD UVEHPRKS: 446 John Deere Pro Utility Veh 70,40070,400 PRK PU TRK 84,000 174,000 55,800PRKS: Pick Up Trucks 1,127,600220,400 89,600 99,000 196,000 208,800 PRK ST TRL1PRKS: 431 Stealth Equipment Trailer 25,20025,200 PRK ST TRL2PRKS: 425 Stealth Equipment Trailer 25,92025,920 PRK STP VANS 100,800 108,000PRKS: Morgan Route Step Vans 331,200122,400 PRK TRLS 19,300PRKS: 427, 428 Enclosed Trailers 42,30023,000 PRK TV VACPRKS: P19 Toro Versa Vac 35,00035,000 PRK UTL CRT 24,600 25,800PRKS: Utility Carts 77,10026,700 PRK VEH3 112,000PRKS: 444 Bobcat Toolcat 112,000 4,450,62024,600 939,000 332,900 679,200 492,7000610 - Parks Dept - General Total 431,300 307,100 402,700 499,800 341,320 0620 - Forestry FRSY AER TRKFRSTRY: 481 Ford F450 Aerial Truck 18,00018,000 FRSY BE TRL 18,600FRSTRY: Badger Equipment Trailer 18,600 FRSY BSS 86,800FRSTRY: Bobcat Skid Steer 86,800 FRSY DMP TRK 168,000 328,600FRSTRY: Dump Trucks 676,600180,000 FRSY EQP1 96,600FRSTRY: 475 Vermeer BC1500 Chipper 96,600 FRSY EQP2FRSTRY: 470 SC802 Stump Grinder 97,40097,400 FRSY FA TRK 310,000FRSTRY: 482 Freightliner Aerial Truck 310,000 FRSY PU TRK 93,000FRSTRY: Pick Up Truck 93,000 FRSY VW CHP 128,300FRSTRY: 473 Vermeer Wood Chipper 128,300 1,525,30096,600 168,000 97,400 965,3000620 - Forestry Total 198,000 Friday, October 31, 2025Page 8 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 1,525,30096,600 168,000 97,400 965,3004401- GO Debt 198,000 1,525,30096,600 168,000 97,400 965,3000620 - Forestry Total 198,000 0650 - Cemetery 125,00025,000 25,0004100-Levy 25,000 25,000 25,000 1,256,200140,200 130,3004401- GO Debt 51,200 143,200 191,400 599,900 1,381,200165,200 25,000 130,3000650 - Cemetery Total 76,200 143,200 216,400 599,900 25,000 CEM DMP TRKCEM: Dump Trucks 175,000175,000 CEM EQ TRAL 22,300CEM: 497 Equipment Trailer 22,300 CEM JD LB 108,000CEM: 496 John Deer 310L Loader/Backhoe 108,000 CEM LEAF PK 140,200CEM: Leaf Picker/Vacuum 419,90090,400 95,90093,400 CEM PU TRKCEM: Pick Up Trucks 371,000273,00098,000 CEM ROAD 25,000 25,000CEM: Cemetery Road Repaving 125,00025,000 25,00025,000 CEM SCAG ZCEM: Scag Zero Turns 104,00051,200 52,800 CEM VEH5CEM: Toro UTX Utility Vehicle 56,00056,000 1,381,200165,200 25,000 130,3000650 - Cemetery Total 76,200 143,200 216,400 599,900 25,000 0740 - Community Development 00A GATE& DT 1,000,000 3,000,000 2,000,000 1,000,000CD: Gateway and Downtown Improvements 14,000,0002,000,000 1,000,000 1,000,000 1,000,000 1,000,0001,000,000 00A LAND&DEV 1,500,000 1,500,000 1,500,000 1,500,000CD: Land Acquisition and Development 15,000,0001,500,000 1,500,000 1,500,000 1,500,000 1,500,0001,500,000 CTR CITY SN 25,000 25,000 25,000CD: Signage to Center City 100,00025,000 G NHOODS 150,000 150,000 150,000 150,000CD: Great Neighborhoods Initiative 1,500,000150,000 150,000 150,000 150,000 150,000150,000 GATE IMPV 100,000 100,000 200,000 200,000CD: Gateway Improvements 1,000,000200,000 200,000 P ISLND RW 5,000,000CD: Pioneer Island Riverwalk 11,400,0006,400,000 P RW BRKWTR 400,000CD: Pioneer Riverwalk Breakwater 400,000 P RW E 14TH 2,000,000CD: Pioneer Riverwalk E 14th 2,000,000 P RW MARINACD: Pioneer Riverwalk to Marina 3,000,0003,000,000 RIV SIGN 100,000 5,000 5,000CD: Riverwalk Signage 140,0005,000 5,000 5,000 5,000 5,0005,000 SAW DIS FTR 75,000 75,000 75,000CD: Sawdust Dist Gateway Features 375,00075,000 75,000 48,915,0002,750,000 4,950,000 6,955,000 5,955,000 8,355,0000740 - Community Development Total 9,330,000 2,655,000 2,655,000 2,655,000 2,655,000 Friday, October 31, 2025Page 9 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 1,540,000150,000 150,000 155,000 155,000 155,0004100-Levy 155,000 155,000 155,000 155,000 155,000 30,975,0002,600,000 4,800,000 3,800,000 3,800,000 3,200,0004401- GO Debt 2,775,000 2,500,000 2,500,000 2,500,000 2,500,000 16,400,0003,000,000 2,000,000 5,000,0009000-To Be Determined 6,400,000 48,915,0002,750,000 4,950,000 6,955,000 5,955,000 8,355,0000740 - Community Development Total 9,330,000 2,655,000 2,655,000 2,655,000 2,655,000 0801 - Traffic/Lighting 55,00010,0002000-Trade-In 5,000 10,000 20,000 10,000 680,00050,000 70,000 70,000 70,000 70,0004100-Levy 70,000 70,000 70,000 70,000 70,000 290,00070,000 40,0004401- GO Debt 20,000 40,000 80,000 40,000 1,025,00050,000 140,000 70,000 120,000 70,0000801 - Traffic/Lighting Total 95,000 120,000 70,000 170,000 120,000 ELEC LT TWRELEC: 80514-2011 Light Tower 25,00025,000 ELEC SRV VAN 50,000ELEC: 80505-2017 Service Van 50,000 ELEC SRV VN2ELEC: 80504-2020 Service Van 50,00050,000 ELEC TRLRELEC: 80518 Trailer & 80517 Generator 50,00050,000 ELEC VEH1ELEC: 80500, 80502 Box Pick Up 100,000100,000 EV CHARG 70,000PRKG: EV Charging Plan 70,000 ST LT PLS 15,000 25,000 25,000 25,000ELEC: Street Lighting Poles 240,00025,000 25,000 25,000 25,000 25,00025,000 TR SGNL EQ 35,000 45,000 45,000 45,000ELEC: Traffic Signal Equipment 440,00045,000 45,000 45,000 45,000 45,00045,000 1,025,00050,000 140,000 70,000 120,000 70,0000801 - Traffic/Lighting Total 95,000 120,000 70,000 170,000 120,000 0810 - Sign Division 50,00020,000 30,0002000-Trade-In 220,000100,000 120,0004401- GO Debt 270,000120,000 150,0000810 - Sign Division Total SGN TRUCK 120,000SIGN: Sign Work Truck 120,000 SIGN B TRK 150,000SIGN: Sign Bucket Truck 150,000 270,000120,000 150,0000810 - Sign Division Total 1070 - Museum Friday, October 31, 2025Page 10 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 1,325,000775,0004401- GO Debt 50,000 500,000 325,000325,0004952-Donations 1,650,000775,000 325,0001070 - Museum Total 50,000 500,000 26 MUS ROOTS 325,000MUS: Deep Roots Exhibit 1,025,000700,000 27 MUS TFFNYMUS: Tiffany Window Removal/Re-Install 75,00075,000 30 MUS EX UPMUS: EXH - People of the Waters 550,00050,000 500,000 1,650,000775,000 325,0001070 - Museum Total 50,000 500,000 1717 - Parking Utility 7,500,000750,000 750,000 750,000 750,000 750,0004401- GO Debt 750,000 750,000 750,000 750,000 750,000 40,00040,0009000-To Be Determined 7,540,000750,000 790,000 750,000 750,000 750,0001717 - Parking Utility Total 750,000 750,000 750,000 750,000 750,000 PRKG 300 LT 750,000PRKG: 300 W. Lot Improvement (Grand)750,000 PRKG LOT IMP 750,000 750,000 750,000PRKG: Parking Lot Improvements 6,750,000750,000 750,000 750,000 750,000 750,000750,000 PRKG LT SIGN 40,000PRKG: Parking Lot Signs 40,000 7,540,000750,000 790,000 750,000 750,000 750,0001717 - Parking Utility Total 750,000 750,000 750,000 750,000 750,000 1728 - Transit 24 TRANS CTR 2,000,000TR: Downtown Transit Center 2,000,000 BKE PED 50,000 50,000 50,000 50,000TR: Bike and Pedestrian 500,00050,000 50,000 50,000 50,000 50,00050,000 CLEAN D BUS 4,900,000TR: Clean Diesel Buses 7,000,0002,100,000 HOIST MNT GRTR: Hoist Maintenance Garage 250,000250,000 PRTS WASH 14,000TR: Parts Washer 14,000 TIRE CHNGR 25,000TR: Tire Changer 25,000 TR DATA BX 400,000TR: Transit Data Boxes 400,000 TR STF VEH 40,000TR: Staff Vehicle 40,000 TR STP IMP 10,000 10,000 10,000 10,000TR: Transit Stop Improvements 100,00010,000 10,000 10,000 10,000 10,00010,000 10,329,0002,485,000 114,000 310,000 60,000 4,960,0001728 - Transit Total 2,160,000 60,000 60,000 60,000 60,000 Friday, October 31, 2025Page 11 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 550,00050,000 50,000 50,000 50,000 50,0004100-Levy 50,000 100,000 50,000 50,000 50,000 6,200,000328,000 8,000 208,000 8,000 3,928,0004206-FED TRANSIT GRANT 80%1,688,000 8,000 8,000 8,000 8,000 1,700,0001,700,0004260-Grant 1,450,00050,000 980,0004401- GO Debt 420,000 179,000107,000 56,000 2,000 2,000 2,0005299T-Transit Fund Balance 2,000 2,000 2,000 2,000 2,000 300,000300,0006000-Carryover from a Prior CIP 10,379,0002,485,000 114,000 310,000 60,000 4,960,0001728 - Transit Total 2,160,000 110,000 60,000 60,000 60,000 1810 - Water 00A WD MTERS 1,029,000 1,132,000 1,365,000 1,501,000WD: Meter Change-Out Program 16,345,0001,245,000 1,651,000 1,816,000 2,195,000 2,414,0001,997,000 23 WD VEH3WD: Replace Mini Dump Trucks 240,000240,000 23 WF CLRWLL 25,000,000 20,500,000WFP: Clearwell Replacement 45,500,000 23 WF MEDIA 3,400,000WFP: Dual Media Filter Repairs/Rplcmnt 3,400,000 24 WD SNSUS 50,000WD: Sensus Water Meter Base St 255,00060,000 70,000 75,000 24 WF GAC FT 4,200,000WFP: Granulated Actvd Carbon Filter Media 4,200,000 25 WD BLDG 225,000 3,200,000WD: Building Addition/Remodel 3,425,000 25 WD EQP3WD: Tractor Backhoe/Loaders 375,000375,000 25 WD VEH1 65,000WD: Replace 1/2-Ton Vans 270,00065,000 70,000 70,000 25 WD VEH2WD: 1-Ton Ext Cab Pickup Trks w/Srv Body 200,000200,000 25 WF A SCBR 600,000WFP: Ammonia Gas Scrubber 600,000 25 WF C SCBR 600,000WFP: Chlorine Gas Scrubber 600,000 25 WF FLUOR 600,000WFP: Fluoride Tanks/Feed Pumps Rplcmnt 600,000 26 WD ROOFWD: Building Roof Replacement 150,000150,000 26 WD VEH1 350,000WD:Tri-Axle Dump Trucks 1,075,000350,000 375,000 26 WF CL MON 45,000WFP: Chlorine Monitors Repl 45,000 26 WF FR AL 36,000WFP: Fire Alarm Syst Ctrl Panel 36,000 26 WF INTAKE 1,600,000WFP: Back-up Water Intakes Repl 16,000,00014,400,000 27 WD VEH1 65,000WD: 1/2-Ton 4WD Ext Cab Pickup Trucks 135,00070,000 27 WF SLUDGE 50,000WFP: Sludge Pumps Replacement 230,000180,000 28 WD EQP1WD: #811 Air Compressor 45,00045,000 28 WD VEH1WD: Repl Step Service Van 400,000400,000 28 WD VEH2WD: Repl Wachs Valve Turner 120,000120,000 28 WF BCKWS H WFP: Backwash Controls/Air Scour 660,000660,000 Friday, October 31, 2025Page 12 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 45,500,00025,000,000 20,500,0005275-Safe Drinking Water Loan 40,817,0002,850,000 1,225,000 15,875,000 11,760,000 180,0005275-Water Revenue Bonds 2,081,000 4,841,000 1,400,000 605,000 19,351,0001,110,000 1,197,000 1,710,000 2,855,000 1,501,0005299W-Water Utility Fund Balance 2,121,000 1,866,000 2,157,000 2,420,000 2,414,000 105,668,00028,960,000 22,922,000 17,585,000 14,615,000 1,681,0001810 - Water Total 4,202,000 6,707,000 3,557,000 3,025,000 2,414,000 Blower Repl 28 WF TANKS 750,000WFP: Alum Piping/Day Tanks/Transfer Pumps Repl 810,00060,000 29 SW WTR TW 1,400,000WFP: SW Wtr Twr Painting/Add Mixing 1,400,000 29 WD VEH1 120,000WD: #828 1-Ton Service TRK w/Valve- Turning Mach 120,000 29 WF CARPET 25,000WFP: WFP Administration Area Carpet 25,000 29 WF VEH1 90,000WFP: 3/4 Ton 4WD PU Trucks w/ Lift Gate/Plow 180,00090,000 30 SDV REPL 60,000WFP: Rapid & Slow Mix/Sed Basin Valve Repl 1,416,0001,356,000 30 WD EQP2 120,000WD: Ditch Witch/Vac-All Trailer/Valve Turner 120,000 31 SED PAINTWFP: Sedimentation Basin Ext Painting 200,000200,000 31 SYS SEDWFP: Repl Systems Sedimentation Basins 1,900,000100,000 1,800,000 31 WF CL FDWFP: Replace Chlorine Feed Equipment 1,100,000100,000 1,000,000 31 WF TANKSWFP: Ammonia Bulk Storage Tanks/Scales Replacement 1,156,000100,000 1,056,000 31 WF VALVESWFP: Ammonia Storage System Valves Replacement 590,00050,000 540,000 32 WD MSN SLWD: Reapplication of WDC Masonry Sealing 50,00050,000 33 ANALYZERSWFP: Replace WFP Analyzers 500,000500,000 33 SED SLDGEWFP: Sed Basin Sludge Pump Repl 250,000200,00050,000 33 WD VEH1#838 Hydro Excavator 700,000700,000 33 WF TANKSWFP: Chem Storage Tank Maint 170,000150,00020,000 34 WF VEH1WFP: #891 Pickup Truck 75,00075,000 105,668,00028,960,000 22,922,000 17,585,000 14,615,000 1,681,0001810 - Water Total 4,202,000 6,707,000 3,557,000 3,025,000 2,414,000 1910 - Sewer 21 WW DUMP 600,000 600,000WW: Update/Relocation of Dump Site 1,200,000 23 WW CL DIG 130,000 110,000WW: Clean Digesters 715,000110,000 135,000 115,000115,000 23 WW INSPEC 1,680,000WW: Collection System Inspections 1,680,000 Friday, October 31, 2025Page 13 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 25 WW BAR SC 3,700,000WW: Replace WWTP Influent Bar Screens 3,700,000 25 WW HVAC 650,000WW: Replace Wastewater Facility HVAC 650,000 25 WW PHOSP H 10,800,000 25,700,000WW: Phosphorus Limits Study/Construction 36,500,000 25 WW SHORE 500,000WW: Shorewood Lift Station Piping & Valves 500,000 25 WW VEH1 700,000WW: Replace Jetter Vacs 1,425,000725,000 26 DAFT SLDG 50,000WW: WWTP DAFT Sludge Pump Repl 50,000 26 WW GENER 1,000,000 3,000,000WW: WWTP Generator Installation 4,000,000 26 WW S MAIN 40,000 130,000WW: Repl S Main St Pump Station Generator & Equip 795,000625,000 26 WW SLUDG E 30,000WW: WWTP Blended Sludge Pump Repl 30,000 26 WW UV 950,000 6,400,000WW: UV Disinfection 7,350,000 27 INFLUENT 650,000 340,000 1,500,000WW: Raw Influent Piping Condition Assess 2,490,000 27 WW BAR SC 114,000WW: Lift Station Bar Screens Rehabilitation 664,000550,000 27 WW CTH Y 56,000WW: Rehab County Hwy Y Pump Station 406,000350,000 27 WW MOWER 15,000WW: #173 Zero-Turn Lawn Mower 15,000 28 WW EUSS 9,500,000WW: Replace Electrical Unit Substations 11,350,0001,850,000 28 WW RA/WAS 2,200,000WW: Repl RAS and WAS Pumping System 2,620,000420,000 28 WW SLUDG E 675,000WW: Repl Primary Sludge Piping and Valves 825,000150,000 29 FLUME LNR 55,000 370,000WW: Parshall Flume Liners Replacement 425,000 29 WW VEH1 70,000WW: 4x4 Pickup Trucks w/Plow & Lift Gates 140,00070,000 30 CL CONTCT 525,000WW: Chlorine Contact Basin Improvements 3,525,0003,000,000 30 WW CNTRF G 187,200WW: Installation of Additional Centrifuge 1,187,2001,000,000 30 WW CNTRT E 355,000WW: Incr Centrate Storage Capacity 1,855,0001,500,000 30 WW VEH1 110,000WW: #975 Single-Axle Dump Truck 110,000 31 DAFT CTRLWW: DAFT Control Equipment Replacement 580,00080,000 500,000 31 GRIT CHBRWW: Grit Chamber Replacement 876,000126,000 750,000 32 FE TNKWW: Ferric Chloride Bulk Storage Tank Repl 1,165,000165,000 1,000,000 32 OUTFL INSWW: WWTP Outfall Inspections 50,00050,000 33 DIGST GASWW: Digester Gas Equipment Replacement 1,130,0001,000,000130,000 34 WW SLUDG E WW: WWTP Blended Sludge Piping & Valves Repl 620,000100,000 520,000 Friday, October 31, 2025Page 14 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 3,380,0001,980,000 1,400,0003100-Prior Year Funding-Sewer Revenue Bonds 600,000300,000 300,0003300-Prior Year Funding-Storm Revenue Bonds 82,985,70017,640,000 35,300,000 3,945,000 3,270,000 12,547,2005273-Sewer Revenue Bonds 5,706,000 1,777,500 1,130,000 1,100,000 570,000 712,500350,0005278-Storm Revenue Bonds 362,500 1,055,00080,000 15,000 110,000 200,000 110,0005299S-Sewer Utility Fund Balance 50,000 115,000 205,000 170,000 88,733,20020,000,000 37,365,000 4,055,000 3,470,000 12,657,2001910 - Sewer Total 5,706,000 2,190,000 1,245,000 1,305,000 740,000 35 WW AERAT N WW: WWTP Aeration Blowers Repl 50,00050,000 35 WW SBSWW: WWTP Sodium Bisulfite Tank Repl 55,00055,000 88,733,20020,000,000 37,365,000 4,055,000 3,470,000 12,657,2001910 - Sewer Total 5,706,000 2,190,000 1,245,000 1,305,000 740,000 2010 - Storm Water 1,905,000625,000 420,000 430,0005278-Storm Revenue Bonds 430,000 528,50085,000 103,500 85,0005299SW-Storm Water Utility Fund Balance 85,000 85,000 85,000 2,433,50085,000 728,500 420,000 85,000 430,0002010 - Storm Water Total 85,000 515,000 85,000 22 SW EQP2 85,000 85,000 85,000SW: Leaf Blowers-Storm Water 340,00085,000 22 SW TRL PMSW: Replace Trailered Water Pumps 50,00050,000 23 SW VEH1 430,000SW: Replace Street Sweepers 1,280,000420,000 430,000 26 SW EQP1 18,500SW: Zero-Turn Lawn Mowers 103,50085,000 26 SW VEH1 625,000SW: Vac All Catch Basin Cleaners 625,000 33 SW CHPPERSW: #101 Trailered Wood Chipper 35,00035,000 2,433,50085,000 728,500 420,000 85,000 430,0002010 - Storm Water Total 85,000 515,000 85,000 6610 - Park Land Imprv 0325 44P AIRS 60,00044th Parallel Park Open Air Shelter 60,000 44P BALL REC44th Parallel Park Ballfield Reconstruction 300,000300,000 ABE RO PRK 275,000Abe Rochlin Park Play Equipment 275,000 ABY EQUIPAbbey Park Play Equipment & Surfacing 275,000275,000 BAUMAN PRK 100,000Bauman Park Play Equipment Surfacing 100,000 Friday, October 31, 2025Page 15 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # BOAT LAUNCHBoat Launch Repairs 150,000150,000 CONG LOTCongress Tot Lot Perimeter Fence 40,00040,000 FGL BT LCH 2,000,000Fugleberg Boat Launch 2,000,000 FGL TEI PRK 200,000Fugleberg Park and Teichmiller Park Resurfacing 200,000 LAKE PRK DEV 300,000 300,000Lakeshore Park Development 900,000300,000 MEN PRK ZOO 100,000 100,000Menominee Park Zoo Improvements 500,000100,000 100,000 100,000 MIL BAY DRED 5,000,000Miller's Bay Dredging 5,000,000 MILL ST BOATMill Street Boat Launch Deck Replacement 30,00030,000 MJEW BF 350,000Mary Jewell Ballfield Reconstruction 350,000 MN BEACH HS 500,000 5,000,000Menominee Park Beach House Reno 5,500,000 MP TP LTSMenominee Tennis/Pickleball Court Lights 200,000200,000 MPRK LIGHTS 100,000Menominee Park Lighting Replacement 100,000 PCKRT TBC 300,000Pickart Park Tennis and Basketball Courts 300,000 PCKT AIR GAMPickart Park Open Air Shelter and Games Area 350,000350,000 PCKT PRK LTS 300,000Pickart Park Paths and Lighting 300,000 POOL HTRS 40,000 40,000PCWP Heaters 120,00040,000 PRK TRLS IMP 50,000 50,000 50,000 50,000Park Trails Improvements 500,00050,000 50,000 50,000 50,000 50,00050,000 QRRY PRK D 50,000Quarry Park Development 100,00050,000 RB PRK IPRainbow Memorial Park Improvements 5,500,000500,000 5,000,000 RB PRK RR 130,000Rainbow Park Restroom Renovation 130,000 RD ARW SKTE 100,000Red Arrow Skate Park 100,000 RED ARW EQP 275,000Red Arrow Park Play Equipment 275,000 RED ARW LGH T 75,000Red Arrow Park Lighting Replacement 75,000 RTZ B RENO 600,000Reetz Ballfields Renovation 600,000 RTZ FSReetz Ballfields Fencing and Scoreboards 500,000500,000 RTZ NF LTS 350,000Reetz North Field Ball Field Lights Replacement 350,000 RTZ SF LTS 350,000Reetz South Ball Field Lights Replacement 350,000 RUSCH BW RE 450,000Rusch Park Boardwalk Replacement 450,000 RUSCH PED BR 400,000Rusch Park Pedestrian Bridge 400,000 SITE A DEV 400,000Site "A"- Ripple & Oregon 600,000200,000 SP SPL PD 550,000South Park Splash Pad 550,000 SPBR FSSpanbauer Field Scoreboard 30,00030,000 SPBR LTS RESpanbauer Field Light Replacements 300,000300,000 Friday, October 31, 2025Page 16 Total2026 2027 2028 2029 2030Department 2031 2032 2033 2034 2035Project # 1,700,0001,000,000 700,0004263-State Grant 25,625,000590,000 3,645,000 3,140,000 5,810,000 4,600,0004401- GO Debt 805,000 1,035,000 5,800,000 150,000 50,000 2,500,0002,500,0004952-Donations 300,000300,0009000-To Be Determined 30,125,000590,000 3,645,000 3,140,000 6,810,000 8,100,0006610 - Park Land Imprv 0325 Total 805,000 1,035,000 5,800,000 150,000 50,000 STGB EQ REStoegbauer Park Playground Equipment Replacement 275,000275,000 STGBR BCStoegbauer Park Basketball Court Overlay 15,00015,000 STGBR BLDStoegbauer Park Restrooms/Shelter Constr 500,000500,000 TEICH EQP RETeichmiller Park Playground Equipment Replacement 275,000275,000 TEICH PRK EQ 150,000Teichmiller Park Play Equipment Surfacing 150,000 W ALG EQPWest Algoma Park Play Equipment & Surfacing 275,000275,000 WESTH BBCWesthaven Circle Park Basketball Court 25,00025,000 WHCRL PADWesthaven Circle Park - Splash Pad 700,000700,000 WL ST PRKWilliam Steiger Park Fishing Dock Decking 50,00050,000 30,125,000590,000 3,645,000 3,140,000 6,810,000 8,100,0006610 - Park Land Imprv 0325 Total 805,000 1,035,000 5,800,000 150,000 50,000 99,153,350 133,845,300 81,214,000 101,428,500 117,913,400Grand Total 735,612,47055,840,100 39,691,300 44,845,300 32,130,700 29,550,520 Friday, October 31, 2025Page 17 TO:Honorable Mayor and Members of the Common Council FROM:Justin Gierach, Engineering Division Manager/City Engineer DATE:November 11, 2025 SUBJECT:Res 25-582 Award Bid for Public Works Contract No. 26-03 to PTS Contractors, Inc. for Ohio Street and West 16th Avenue Reconstruction ($7,161,242.35) BACKGROUND Th e pu rpose of th is Project is to recon stru ct O h io Street, from West Sou th Park Av en u e to West 1 7 th Av en u e, an d West 1 6 th Av en u e, from O h io Street to O regon Street. San itary sewer an d laterals, water m ain an d laterals, an d storm sewer an d laterals will be in stalled, replaced, or repaired, as n eeded, prior to placin g th e con crete pav em en t. New con crete driv eway apron s w ill be con stru cted w h ere n eeded, prov ided property own ers h av e retu rn ed th e Con stru ction Access Ag reem en t th e City m ailed to th em . Sidew alk s an d driv e apron s abu ttin g properties wh ose property ow n ers h av e n ot retu rn ed th e Con stru ction Access Agreem en t w ill h av e partial sidew alk section s rem ov ed an d patch ed. In 2 0 2 7 , property own ers will be respon sible for repairin g driv e apron s an d all patch ed an d n on - ADA com plian t sidew alk s th at can n ot be con stru cted w ith th is Project. ANALYSIS En gin eerin g staff rev iewed six (6 ) bids. Th e low Bid was receiv ed from PTS Con tractors, In c. of G reen Bay, Wiscon sin . FISCAL IMPACT Fu n din g for th e O h io Street an d West 1 6 th Av en u e R econ stru ction Project is in th e 2 0 2 6 Capital Im prov em en t Program (CIP) (Accou n t No. 0 3 2 1 0 4 1 0 -6 8 0 1 -0 4 6 0 3 /Con tract Con trol-Pav in g-2 6 - 0 3 O h io St/W 1 6 th Av e R econ , 0 3 2 1 0 4 1 0 -6 8 0 4 -0 4 6 0 3 /Con tract Con trol-Storm Sew er-2 6 -0 3 O h io St/W 1 6 th Av e R econ , 0 3 2 1 0 4 1 0 -6 8 0 2 -0 4 6 0 3 /Con tract Con trol-San itary Sewer-2 6 -0 3 O h io St/W 1 6 th Av e R econ , 0 3 2 1 0 4 1 0 -6 8 0 3 -0 4 6 0 3 /Con tract Con trol-Water Main -2 6 -0 3 O h io St/W 1 6 th Av e R econ , 0 3 2 1 0 4 1 0 -6 8 0 6 -0 4 6 0 3 /Con tract Con trol-Sidewalk -2 6 -0 3 O h io St/W 1 6 th Av e R econ , 0 3 2 1 0 4 1 0 -6 8 0 9 -0 4 6 0 3 /Con tract Con trol-Traffic-2 6 -0 3 O h io St/W 1 6 th Av e R econ , an d 0 3 2 1 0 4 1 0 -6 8 1 0 -0 4 6 0 3 /Con tract Con trol-Adm in -2 6 -0 3 O h io St/W 1 6 th Av e R econ ). Followin g is a su m m ary of th e av ailable fu n ds an d th e estim ated total con stru ction cost, in clu din g an cillary costs su ch as en gin eerin g fees, lan dfill tippin g fees, con stru ction m aterials testin g fees, an d oth er con stru ction -related expen ses. Special Assessm en ts will be lev ied to adjoin in g property own ers per th e City's Special Assessm en t Policy. CIP Section CIP Fu n ds Bu dgeted Estim ated Total Con stru ction Cost Streets $3 ,1 7 7 ,9 0 0 $2 ,7 9 5 ,5 2 8 Storm Sew er $2 ,3 0 7 ,0 0 0 $1 ,6 0 3 ,3 7 1 San itary Sewer $2 ,4 5 1 ,8 0 0 $1 ,6 2 2 ,7 1 4 Water Main $2 ,1 2 2 ,9 0 0 $1 ,7 7 0 ,7 7 0 Sidew alk $3 5 0 ,4 0 0 $1 0 1 ,3 8 7 Traffic $5 0 ,0 0 0 $3 1 ,2 7 1 Adm in $4 ,0 0 0 $4 ,0 0 0 Totals $1 0 ,4 6 4 ,0 0 0 $7 ,9 2 9 ,0 4 1 RECOMMENDATION I recom m en d aw ard to th e low bidder, PTS Con tractors, In c. in th e am ou n t of $7 ,1 6 1 ,2 4 2 .3 5 . Atta chments Res 25-582 26-03 bid tab 11/11/2025 25-582 RESOLUTION                  PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 26-03 TO PTS CONTRACTORS, INC. FOR OHIO STREET AND WEST 16TH AVENUE RECONSTRUCTION ($7,161,242.35) INITIATED BY : DEPARTMENT OF PUBLIC WORKS         WHEREAS, the City of Oshkosh has heretofore advertised for bids to reconstruct Ohio Street, from West South Park Avenue to West 17th Avenue, and West 16th Avenue, from Ohio Street to Oregon Street; and     WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid:          PTS Contractors, Inc.         4075 Eaton Road         Green Bay, WI  54311     Total Bid:     $7,161,242.35 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to Plans, Specifications, and Bid on file.  Money for this purpose is hereby appropriated from:  Acct. Nos.  03210410-6801-04603/Contract Control-Paving-26-03 Ohio St/W 16th Ave Recon 03210410-6804-04603/Contract Control-Storm Sewer-26-03 Ohio St/W 16th Ave Recon 03210410-6802-04603/Contract Control-Sanitary Sewer-26-03 Ohio St/W 16th Ave Recon 03210410-6803-04603/Contract Control-Water Main-26-03 Ohio St/W 16th Ave Recon 03210410-6806-04603/Contract Control-Sidewalk-26-03 Ohio St/W 16th Ave Recon 03210410-6809-04603/Contract Control-Traffic-26-03 Ohio St/W 16th Ave Recon 03210410-6810-04603/Contract Control-Admin-26-03 Ohio St/W 16th Ave Recon   Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Section 1 $7,161,242.35 $7,250,281.47 1011 Clearing; complete as specified Inch Diameter 549.00 $23.60 $12,956.40 $20.90 $11,474.10 1021 Grubbing; complete as specified Inch Diameter 549.00 $16.40 $9,003.60 $20.90 $11,474.10 1050 Mobilization; complete as specified Lump Sum 1.00 $418,000.00 $418,000.00 $221,933.00 $221,933.00 1051 Business access plan and signage; complete as specified Each 2.00 $578.00 $1,156.00 $366.00 $732.00 1100 Removing pavement; complete as specified Square Yards 9,725.00 $0.01 $97.25 $5.60 $54,460.00 1110 Removing curb and gutter; complete as specified Linear Feet 4,800.00 $0.01 $48.00 $3.60 $17,280.00 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 71,250.00 $0.72 $51,300.00 $0.80 $57,000.00 1200 Unclassified excavation; complete as specified Cubic Yards 5,880.00 $21.10 $124,068.00 $15.00 $88,200.00 1220 Excavation special (paving); complete as specified Tons 870.00 $1.00 $870.00 $0.01 $8.70 1301 7" concrete pavement; with 5" CABC and grading; complete as specified Square Yards 16,000.00 $54.60 $873,600.00 $53.80 $860,800.00 1303 7" concrete pavement HES; with 5" CABC and grading; complete as specified Square Yards 2,000.00 $56.60 $113,200.00 $55.90 $111,800.00 1313 8" concrete pavement HES; with 6" CABC and grading; complete as specified Square Yards 805.00 $86.50 $69,632.50 $85.30 $68,666.50 1334 Concrete pavement gaps; complete as specified Each 2.00 $1.00 $2.00 $0.01 $0.02 1340 Crushed aggregate base course; complete as specified Tons 870.00 $15.10 $13,137.00 $12.50 $10,875.00 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 1 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 1350 Pavement ties; complete as specified Each 51.00 $9.20 $469.20 $9.40 $479.40 1352 Drilled dowel bars; 1"; complete as specified Each 134.00 $14.40 $1,929.60 $14.60 $1,956.40 1354 Drilled dowel bars; 1 1/4"; complete as specified Each 128.00 $17.00 $2,176.00 $17.30 $2,214.40 1360 Adjust manholes and inlets; complete as specified Each 117.00 $410.00 $47,970.00 $418.20 $48,929.40 1370 Turf restoration; complete as specified Square Yards 8,950.00 $6.90 $61,755.00 $10.50 $93,975.00 1372 Restore gravel driveway/apron; complete as specified Square Yards 65.00 $31.00 $2,015.00 $11.50 $747.50 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 1,845.00 $0.01 $18.45 $0.01 $18.45 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 365.00 $0.01 $3.65 $0.01 $3.65 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 963.00 $13.40 $12,904.20 $13.80 $13,289.40 1440 30" curb and gutter; 7"; with 5" CABC and grading; complete as specified Linear Feet 40.00 $68.80 $2,752.00 $73.70 $2,948.00 1460 Sidewalk curb; complete as specified Linear Feet 285.00 $46.20 $13,167.00 $78.40 $22,344.00 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 34,250.00 $8.30 $284,275.00 $7.10 $243,175.00 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 27,500.00 $9.30 $255,750.00 $7.30 $200,750.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 2 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 1514 6" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete as specified Square Feet 5,960.00 $9.70 $57,812.00 $7.60 $45,296.00 1530 6" concrete step; complete as specified Square Feet 1,260.00 $77.00 $97,020.00 $78.40 $98,784.00 1540 Curb ramp detectable warning field (natural/non-painted); complete as specified Square Feet 460.00 $33.00 $15,180.00 $41.80 $19,228.00 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 11,500.00 $1.80 $20,700.00 $2.10 $24,150.00 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 690.00 $6.20 $4,278.00 $8.40 $5,796.00 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 6,760.00 $0.05 $338.00 $0.01 $67.60 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 6,760.00 $0.10 $676.00 $0.01 $67.60 1590 Up-charge for late season cold weather concrete sidewalk; complete as specified Cubic Yards 105.00 $25.70 $2,698.50 $15.70 $1,648.50 1600 Furnish and install tree; complete as specified Each 54.00 $668.00 $36,072.00 $575.00 $31,050.00 1650 Locate existing property monuments; complete as specified Each 53.00 $128.00 $6,784.00 $131.00 $6,943.00 1651 Replace section corner; complete as specified Each 1.00 $1,080.00 $1,080.00 $1,098.00 $1,098.00 1652 Replace existing property monuments; complete as specified Each 53.00 $26.00 $1,378.00 $26.00 $1,378.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 3 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 1700 Sawing existing pavement; complete as specified Linear Feet 1,835.00 $1.80 $3,303.00 $2.20 $4,037.00 1710 Sawing concrete pavement full depth; complete as specified Linear Feet 565.00 $2.60 $1,469.00 $3.90 $2,203.50 1900 Tack coat; complete as specified Gallons 40.00 $9.00 $360.00 $9.10 $364.00 1911 4" asphaltic transition LT with 10" CABC and grading; complete as specified Square Yards 405.00 $56.00 $22,680.00 $55.50 $22,477.50 1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 185.00 $60.00 $11,100.00 $56.10 $10,378.50 1917 2" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 50.00 $68.00 $3,400.00 $66.60 $3,330.00 1918 Asphaltic cold weather paving up-charge; complete as specified Square Yards 58.00 $1.00 $58.00 $1.00 $58.00 2002 Furnish and install 10" storm sewer; complete as specified Linear Feet 45.00 $99.00 $4,455.00 $81.00 $3,645.00 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 898.00 $98.00 $88,004.00 $72.00 $64,656.00 2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 875.00 $97.00 $84,875.00 $74.00 $64,750.00 2009 Furnish and install 18" storm sewer; complete as specified Linear Feet 1,550.00 $97.00 $150,350.00 $79.00 $122,450.00 2012 Furnish and install 21" storm sewer; complete as specified Linear Feet 1,180.00 $180.00 $212,400.00 $95.00 $112,100.00 2018 Furnish and install 27" storm sewer; complete as specified Linear Feet 850.00 $142.00 $120,700.00 $139.00 $118,150.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 4 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 2021 Furnish and install 30" storm sewer; complete as specified Linear Feet 30.00 $214.00 $6,420.00 $194.00 $5,820.00 2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 102.00 $708.00 $72,216.00 $887.00 $90,474.00 2202 Furnish and install standard storm sewer manhole (5' diameter); complete as specified Vertical Feet 49.00 $958.00 $46,942.00 $965.00 $47,285.00 2203 Furnish and install standard storm sewer manhole (6' diameter); complete as specified Vertical Feet 6.00 $1,126.00 $6,756.00 $1,233.00 $7,398.00 2213 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as specified Vertical Feet 9.00 $730.00 $6,570.00 $1,025.00 $9,225.00 2235 Furnish and install Type 1 inlet (with 18" sump); complete as specified Each 2.00 $3,516.00 $7,032.00 $3,709.00 $7,418.00 2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 50.00 $2,800.00 $140,000.00 $3,358.00 $167,900.00 2400 Furnish and install 6" storm sewer lateral; complete as specified Linear Feet 4,300.00 $69.00 $296,700.00 $58.00 $249,400.00 2402 Furnish and install 8" storm sewer lateral; complete as specified Linear Feet 57.00 $97.00 $5,529.00 $81.00 $4,617.00 2404 Furnish and install storm sewer marker balls; complete as specified Each 250.00 $43.00 $10,750.00 $32.00 $8,000.00 2406 Furnish and install storm sewer clay dams; complete as specified Each 123.00 $87.00 $10,701.00 $102.00 $12,546.00 2408 Furnish and install storm sewer lateral inlet; complete as specified Each 121.00 $870.00 $105,270.00 $1,153.00 $139,513.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 5 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 2414 Storm lateral inlet adjustments; complete as specified Each 20.00 $1.00 $20.00 $77.00 $1,540.00 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 96.00 $77.00 $7,392.00 $89.00 $8,544.00 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 88.00 $26.00 $2,288.00 $16.00 $1,408.00 2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 2.00 $1,160.00 $2,320.00 $1,046.00 $2,092.00 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 130.00 $26.00 $3,380.00 $10.00 $1,300.00 2518 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specified Linear Feet 100.00 $6.30 $630.00 $13.00 $1,300.00 2524 Furnish; install; maintain; and remove dewatering tank system; complete as specified Each 2.00 $1.00 $2.00 $3,137.00 $6,274.00 2750 Rock excavation; complete as specified Cubic Yards 100.00 $1.00 $100.00 $0.01 $1.00 2800 Abandon 8" - 12" storm sewer; complete as specified Linear Feet 205.00 $10.80 $2,214.00 $11.00 $2,255.00 2802 Abandon 15" and larger storm sewer; complete as specified Linear Feet 780.00 $20.00 $15,600.00 $23.00 $17,940.00 2804 Remove 30" and smaller storm sewer; complete as specified Linear Feet 770.00 $35.00 $26,950.00 $36.00 $27,720.00 2810 Abandon storm sewer manholes and inlets; complete as specified Each 14.00 $290.00 $4,060.00 $440.00 $6,160.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 6 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 2812 Remove storm sewer manholes and inlets; complete as specified Each 21.00 $290.00 $6,090.00 $595.00 $12,495.00 2850 Connect to existing storm sewer main; complete as specified Each 12.00 $1,793.00 $21,516.00 $1,508.00 $18,096.00 2852 Connect to existing storm sewer lateral; complete as specified Each 2.00 $173.00 $346.00 $279.00 $558.00 2856 Connect to existing storm sewer manhole; complete as specified Each 3.00 $1,735.00 $5,205.00 $1,330.00 $3,990.00 2858 Connect to existing storm sewer inlet; complete as specified Each 5.00 $290.00 $1,450.00 $1,154.00 $5,770.00 2914 Storm sewer utility line opening (ULO); complete as specified Each 4.00 $1.00 $4.00 $1,282.00 $5,128.00 2950 Excavation special (storm); complete as specified Tons 150.00 $1.00 $150.00 $23.00 $3,450.00 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 4,320.00 $126.00 $544,320.00 $175.00 $756,000.00 3002 Furnish and install 10" sanitary sewer (relay); complete as specified Linear Feet 50.00 $276.00 $13,800.00 $230.00 $11,500.00 3004 Furnish and install 12" sanitary sewer (relay); complete as specified Linear Feet 35.00 $320.00 $11,200.00 $235.00 $8,225.00 3006 Furnish and install 15" sanitary sewer (relay); complete as specified Linear Feet 50.00 $223.00 $11,150.00 $200.00 $10,000.00 3012 Furnish and install 24" sanitary sewer (relay); complete as specified Linear Feet 15.00 $485.00 $7,275.00 $280.00 $4,200.00 3060 Furnish and install 8" sanitary sewer drop; complete as specified Vertical Feet 10.00 $1,145.00 $11,450.00 $995.00 $9,950.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 7 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 3064 Furnish and install 12" sanitary sewer drop; complete as specified Vertical Feet 5.00 $1,690.00 $8,450.00 $1,532.00 $7,660.00 3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 220.00 $570.00 $125,400.00 $590.00 $129,800.00 3114 Furnish and install sanitary sewer external manhole chimney seal; complete as specified Each 22.00 $565.00 $12,430.00 $575.00 $12,650.00 3118 Furnish and install sanitary sewer internal manhole chimney seal; complete as specified Each 5.00 $462.00 $2,310.00 $915.00 $4,575.00 3119 Furnish and install 10" sanitary sewer internal manhole chimney seal; complete as specified Each 5.00 $513.00 $2,565.00 $810.00 $4,050.00 3200 Furnish and install 8" x 4" sanitary sewer factory wyes or tees; complete as specified Each 1.00 $141.00 $141.00 $211.00 $211.00 3210 Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specified Each 131.00 $162.00 $21,222.00 $296.00 $38,776.00 3230 Furnish and install 4" sanitary sewer laterals (new); complete as specified Linear Feet 40.00 $129.00 $5,160.00 $111.00 $4,440.00 3234 Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specified Linear Feet 4,700.00 $112.00 $526,400.00 $118.00 $554,600.00 3235 Furnish and install 4"/6" sanitary sewer riser (relay); complete as specified Linear Feet 100.00 $102.00 $10,200.00 $164.00 $16,400.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 8 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 3236 Furnish and install sanitary sewer lateral marker balls; complete as specified Each 270.00 $43.00 $11,610.00 $32.00 $8,640.00 3238 Furnish and install clay dams; complete as specified Each 132.00 $86.00 $11,352.00 $102.00 $13,464.00 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 4.00 $1,800.00 $7,200.00 $3,455.00 $13,820.00 3302 Furnish and install connection to existing 10" sanitary sewer mains; complete as specified Each 3.00 $1,845.00 $5,535.00 $3,709.00 $11,127.00 3304 Furnish and install connection to existing 12" sanitary sewer mains; complete as specified Each 1.00 $1,771.00 $1,771.00 $3,873.00 $3,873.00 3306 Furnish and install connection to existing 15" sanitary sewer mains; complete as specified Each 1.00 $1,800.00 $1,800.00 $4,110.00 $4,110.00 3312 Furnish and install connection to existing 24" sanitary sewer mains; complete as specified Each 1.00 $3,075.00 $3,075.00 $4,477.00 $4,477.00 3330 Furnish and install sanitary sewer concrete collars; complete as specified Each 2.00 $1.00 $2.00 $469.00 $938.00 3601 Utility trench rock excavation (sanitary); complete as specified Linear Feet 850.00 $1.00 $850.00 $0.01 $8.50 3700 Closed circuit televising; complete as specified Linear Feet 4,470.00 $1.10 $4,917.00 $1.40 $6,258.00 3710 Closed circuit televising - using push camera; complete as specified Each 5.00 $1.00 $5.00 $255.00 $1,275.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 9 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 3800 Abandon sanitary sewer manholes; complete as specified Each 4.00 $290.00 $1,160.00 $501.00 $2,004.00 3806 Abandon 12" sanitary sewer; complete as specified Linear Feet 30.00 $12.00 $360.00 $12.00 $360.00 3818 Abandon 30" sanitary sewer; complete as specified Linear Feet 1,170.00 $35.00 $40,950.00 $43.00 $50,310.00 3852 Remove sanitary sewer manholes; complete as specified Each 3.00 $580.00 $1,740.00 $591.00 $1,773.00 3854 Remove sanitary sewer; complete as specified Linear Feet 200.00 $37.50 $7,500.00 $65.00 $13,000.00 3890 Sanitary sewer utility line opening (ULO); complete as specified Each 3.00 $1.00 $3.00 $1,282.00 $3,846.00 3892 Excavation special (sanitary); complete as specified Tons 40.00 $1.00 $40.00 $23.00 $920.00 4000 Furnish and install 4" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 30.00 $152.00 $4,560.00 $160.00 $4,800.00 4002 Furnish and install 6" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 230.00 $137.00 $31,510.00 $140.00 $32,200.00 4004 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 4,600.00 $132.00 $607,200.00 $158.00 $726,800.00 4006 Furnish and install 10" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 5.00 $280.00 $1,400.00 $200.00 $1,000.00 4008 Furnish and install 12" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 170.00 $250.00 $42,500.00 $220.00 $37,400.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 10 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 4036 Furnish and install 1" water service (relay); complete as specified Linear Feet 4,600.00 $107.00 $492,200.00 $90.00 $414,000.00 4042 Furnish and install 1" water service (new); complete as specified Linear Feet 50.00 $107.00 $5,350.00 $92.00 $4,600.00 4048 Furnish and install 1" corporation and stop box; complete as specified Each 128.00 $538.00 $68,864.00 $627.00 $80,256.00 4055 Furnish and install water service clay dams; complete as specified Each 129.00 $87.00 $11,223.00 $128.00 $16,512.00 4056 Furnish and install connections to existing 4" water main; complete as specified Each 1.00 $1,960.00 $1,960.00 $2,948.00 $2,948.00 4058 Furnish and install connections to existing 6" water main; complete as specified Each 4.00 $2,050.00 $8,200.00 $3,240.00 $12,960.00 4060 Furnish and install connections to existing 8" water main; complete as specified Each 6.00 $2,160.00 $12,960.00 $3,638.00 $21,828.00 4062 Furnish and install connections to existing 10" water main; complete as specified Each 1.00 $2,610.00 $2,610.00 $4,067.00 $4,067.00 4064 Furnish and install connections to existing 12" water main; complete as specified Each 2.00 $3,110.00 $6,220.00 $4,483.00 $8,966.00 4080 Temporary water main; complete as specified Lump Sum 1.00 $1.00 $1.00 $19,167.00 $19,167.00 4109 Furnish and install 8" x 4" water main tee; complete as specified Each 1.00 $595.00 $595.00 $803.00 $803.00 4110 Furnish and install 8" x 6" water main tee; complete as specified Each 9.00 $750.00 $6,750.00 $968.00 $8,712.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 11 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 4111 Furnish and install 8" x 8" water main tee; complete as specified Each 5.00 $850.00 $4,250.00 $1,075.00 $5,375.00 4189 Furnish and install 8" x 8" water main cross; complete as specified Each 2.00 $1,112.00 $2,224.00 $1,360.00 $2,720.00 4191 Furnish and install 8" x 12" water main cross; complete as specified Each 1.00 $1,490.00 $1,490.00 $1,767.00 $1,767.00 4219 Furnish and install 8" 11- 1/4 degree water main bend; complete as specified Each 1.00 $460.00 $460.00 $621.00 $621.00 4227 Furnish and install 6" 22- 1/2 degree water main bend; complete as specified Each 2.00 $350.00 $700.00 $463.00 $926.00 4236 Furnish and install 6" 45 degree water main bend; complete as specified Each 28.00 $360.00 $10,080.00 $478.00 $13,384.00 4237 Furnish and install 8" 45 degree water main bend; complete as specified Each 12.00 $485.00 $5,820.00 $648.00 $7,776.00 4239 Furnish and install 12" 45 degree water main bend; complete as specified Each 4.00 $1,005.00 $4,020.00 $1,247.00 $4,988.00 4264 Furnish and install 8" x 6" water main reducer; complete as specified Each 4.00 $446.00 $1,784.00 $575.00 $2,300.00 4267 Furnish and install 10" x 8" water main reducer; complete as specified Each 1.00 $577.00 $577.00 $753.00 $753.00 4350 Cut and cap existing 4" water main; complete as specified Each 2.00 $1,270.00 $2,540.00 $1,086.00 $2,172.00 4352 Cut and cap existing 6" water main; complete as specified Each 2.00 $1,330.00 $2,660.00 $1,149.00 $2,298.00 4354 Cut and cap existing 8" water main; complete as specified Each 2.00 $1,705.00 $3,410.00 $1,433.00 $2,866.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 12 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 4358 Cut and cap existing 12" water main; complete as specified Each 2.00 $2,140.00 $4,280.00 $1,778.00 $3,556.00 4400 Furnish and install 4" water main gate valve; complete as specified Each 1.00 $1,700.00 $1,700.00 $1,974.00 $1,974.00 4401 Furnish and install 6" water main gate valve; complete as specified Each 10.00 $2,015.00 $20,150.00 $2,304.00 $23,040.00 4402 Furnish and install 8" water main gate valve; complete as specified Each 40.00 $2,805.00 $112,200.00 $3,199.00 $127,960.00 4403 Furnish and install 10" water main gate valve; complete as specified Each 1.00 $3,990.00 $3,990.00 $4,513.00 $4,513.00 4404 Furnish and install 12" water main gate valve; complete as specified Each 2.00 $4,910.00 $9,820.00 $5,530.00 $11,060.00 4500 Furnish and install hydrant; complete as specified Each 9.00 $5,920.00 $53,280.00 $6,862.00 $61,758.00 4801 Utility trench rock excavation; complete as specified Linear Feet 175.00 $1.00 $175.00 $0.01 $1.75 4900 Abandon water main on West 16th Avenue; complete as specified Lump Sum 1.00 $2,895.00 $2,895.00 $3,573.00 $3,573.00 4902 Abandon water main on Ohio Street; complete as specified Lump Sum 1.00 $2,895.00 $2,895.00 $2,297.00 $2,297.00 4920 Remove water main; complete as specified Linear Feet 800.00 $39.00 $31,200.00 $43.00 $34,400.00 4990 Excavation special (water); complete as specified Tons 40.00 $1.00 $40.00 $23.00 $920.00 5016 Furnish and install pull box (steel); 24" x 36"; complete as specified Each 5.00 $900.00 $4,500.00 $915.00 $4,575.00 5025 Adjust pull box; complete as specified Each 5.00 $5.00 $25.00 $110.00 $550.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 13 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 5027 Remove concrete base; complete as specified Each 6.00 $205.00 $1,230.00 $209.00 $1,254.00 5130 Furnish and install 3" Schedule 40 PVC; complete as specified Linear Feet 450.00 $12.30 $5,535.00 $12.50 $5,625.00 5181 Connect to existing conduit; complete as specified Each 5.00 $128.00 $640.00 $131.00 $655.00 5262 Furnish and install 10 gauge green-coated wire; complete as specified Linear Feet 450.00 $1.00 $450.00 $0.90 $405.00 5356 Furnish and install 14 gauge stranded single pair twisted with shield; complete as specified Linear Feet 750.00 $1.80 $1,350.00 $1.80 $1,350.00 5372 Furnish and install 14 AWG solid 21 conductor; complete as specified Linear Feet 850.00 $4.90 $4,165.00 $5.00 $4,250.00 5421 Install CITY-supplied 13' traffic signal pole with a pedestal base; complete as specified Each 2.00 $103.00 $206.00 $105.00 $210.00 5424 Install CITY-supplied 20' traffic signal pole with a pedestal base; complete as specified Each 2.00 $308.00 $616.00 $314.00 $628.00 5430 Install CITY-supplied 20' trombone arm; complete as specified Each 2.00 $308.00 $616.00 $314.00 $628.00 5434 Install CITY-supplied three-section traffic signal head; back plate; and LED modules; complete as specified Each 5.00 $154.00 $770.00 $157.00 $785.00 5436 Install CITY-supplied five- section traffic signal head; back plate; and LED modules; complete as specified Each 1.00 $180.00 $180.00 $183.00 $183.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 14 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 4075 Eaton Road Green Bay, WI 54311 PTS Contractors, Inc Dorner Inc. 5438 Install CITY-supplied pedestrian signal head with countdown timer; complete as specified Each 4.00 $128.00 $512.00 $131.00 $524.00 5440 Install CITY-supplied pedestrian push button; complete as specified Each 4.00 $128.00 $512.00 $131.00 $524.00 5502 Furnish and install Type 2 base; complete as specified Each 4.00 $890.00 $3,560.00 $1,830.00 $7,320.00 5506 Furnish and install Type 9 base; complete as specified Each 1.00 $2,260.00 $2,260.00 $2,300.00 $2,300.00 Bid Total:$7,161,242.35 $7,250,281.47 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 15 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Section 1 1011 Clearing; complete as specified Inch Diameter 549.00 1021 Grubbing; complete as specified Inch Diameter 549.00 1050 Mobilization; complete as specified Lump Sum 1.00 1051 Business access plan and signage; complete as specified Each 2.00 1100 Removing pavement; complete as specified Square Yards 9,725.00 1110 Removing curb and gutter; complete as specified Linear Feet 4,800.00 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 71,250.00 1200 Unclassified excavation; complete as specified Cubic Yards 5,880.00 1220 Excavation special (paving); complete as specified Tons 870.00 1301 7" concrete pavement; with 5" CABC and grading; complete as specified Square Yards 16,000.00 1303 7" concrete pavement HES; with 5" CABC and grading; complete as specified Square Yards 2,000.00 1313 8" concrete pavement HES; with 6" CABC and grading; complete as specified Square Yards 805.00 1334 Concrete pavement gaps; complete as specified Each 2.00 1340 Crushed aggregate base course; complete as specified Tons 870.00 Unit Price Extension Unit Price Extension $7,259,127.48 $7,454,832.72 $20.75 $11,391.75 $20.00 $10,980.00 $20.75 $11,391.75 $20.00 $10,980.00 $370,000.00 $370,000.00 $334,750.00 $334,750.00 $725.00 $1,450.00 $350.00 $700.00 $0.02 $194.50 $5.00 $48,625.00 $0.02 $96.00 $3.00 $14,400.00 $0.71 $50,587.50 $0.55 $39,187.50 $21.00 $123,480.00 $19.50 $114,660.00 $0.02 $17.40 $12.00 $10,440.00 $54.20 $867,200.00 $52.65 $842,400.00 $56.25 $112,500.00 $54.65 $109,300.00 $85.95 $69,189.75 $83.56 $67,265.80 $0.02 $0.04 $0.01 $0.02 $15.00 $13,050.00 $10.00 $8,700.00 David Tenor Corporation Advance Construction Inc. I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 16 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 1350 Pavement ties; complete as specified Each 51.00 1352 Drilled dowel bars; 1"; complete as specified Each 134.00 1354 Drilled dowel bars; 1 1/4"; complete as specified Each 128.00 1360 Adjust manholes and inlets; complete as specified Each 117.00 1370 Turf restoration; complete as specified Square Yards 8,950.00 1372 Restore gravel driveway/apron; complete as specified Square Yards 65.00 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 1,845.00 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 365.00 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 963.00 1440 30" curb and gutter; 7"; with 5" CABC and grading; complete as specified Linear Feet 40.00 1460 Sidewalk curb; complete as specified Linear Feet 285.00 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 34,250.00 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 27,500.00 Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $9.18 $468.18 $9.00 $459.00 $14.28 $1,913.52 $14.00 $1,876.00 $16.83 $2,154.24 $16.50 $2,112.00 $408.00 $47,736.00 $400.00 $46,800.00 $6.95 $62,202.50 $6.75 $60,412.50 $30.50 $1,982.50 $6.50 $422.50 $0.01 $18.45 $0.01 $18.45 $0.01 $3.65 $0.01 $3.65 $13.25 $12,759.75 $13.20 $12,711.60 $68.35 $2,734.00 $66.50 $2,660.00 $46.35 $13,209.75 $75.00 $21,375.00 $8.35 $285,987.50 $6.80 $232,900.00 $9.25 $254,375.00 $7.05 $193,875.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 17 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 1514 6" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete as specified Square Feet 5,960.00 1530 6" concrete step; complete as specified Square Feet 1,260.00 1540 Curb ramp detectable warning field (natural/non-painted); complete as specified Square Feet 460.00 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 11,500.00 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 690.00 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 6,760.00 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 6,760.00 1590 Up-charge for late season cold weather concrete sidewalk; complete as specified Cubic Yards 105.00 1600 Furnish and install tree; complete as specified Each 54.00 1650 Locate existing property monuments; complete as specified Each 53.00 1651 Replace section corner; complete as specified Each 1.00 1652 Replace existing property monuments; complete as specified Each 53.00 Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $9.68 $57,692.80 $7.30 $43,508.00 $77.25 $97,335.00 $75.00 $94,500.00 $32.96 $15,161.60 $40.00 $18,400.00 $1.80 $20,700.00 $2.00 $23,000.00 $6.15 $4,243.50 $8.00 $5,520.00 $0.01 $67.60 $0.01 $67.60 $0.01 $67.60 $0.01 $67.60 $0.01 $1.05 $15.00 $1,575.00 $670.00 $36,180.00 $650.00 $35,100.00 $127.50 $6,757.50 $125.00 $6,625.00 $1,080.00 $1,080.00 $1,050.00 $1,050.00 $25.75 $1,364.75 $25.00 $1,325.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 18 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 1700 Sawing existing pavement; complete as specified Linear Feet 1,835.00 1710 Sawing concrete pavement full depth; complete as specified Linear Feet 565.00 1900 Tack coat; complete as specified Gallons 40.00 1911 4" asphaltic transition LT with 10" CABC and grading; complete as specified Square Yards 405.00 1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 185.00 1917 2" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 50.00 1918 Asphaltic cold weather paving up-charge; complete as specified Square Yards 58.00 2002 Furnish and install 10" storm sewer; complete as specified Linear Feet 45.00 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 898.00 2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 875.00 2009 Furnish and install 18" storm sewer; complete as specified Linear Feet 1,550.00 2012 Furnish and install 21" storm sewer; complete as specified Linear Feet 1,180.00 2018 Furnish and install 27" storm sewer; complete as specified Linear Feet 850.00 Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $2.00 $3,670.00 $1.95 $3,578.25 $2.50 $1,412.50 $2.35 $1,327.75 $9.00 $360.00 $8.75 $350.00 $55.75 $22,578.75 $52.75 $21,363.75 $59.78 $11,059.30 $52.95 $9,795.75 $68.70 $3,435.00 $61.60 $3,080.00 $1.00 $58.00 $1.00 $58.00 $87.00 $3,915.00 $98.00 $4,410.00 $89.00 $79,922.00 $104.00 $93,392.00 $95.00 $83,125.00 $93.00 $81,375.00 $110.00 $170,500.00 $91.50 $141,825.00 $125.00 $147,500.00 $101.00 $119,180.00 $160.00 $136,000.00 $134.50 $114,325.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 19 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 2021 Furnish and install 30" storm sewer; complete as specified Linear Feet 30.00 2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 102.00 2202 Furnish and install standard storm sewer manhole (5' diameter); complete as specified Vertical Feet 49.00 2203 Furnish and install standard storm sewer manhole (6' diameter); complete as specified Vertical Feet 6.00 2213 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as specified Vertical Feet 9.00 2235 Furnish and install Type 1 inlet (with 18" sump); complete as specified Each 2.00 2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 50.00 2400 Furnish and install 6" storm sewer lateral; complete as specified Linear Feet 4,300.00 2402 Furnish and install 8" storm sewer lateral; complete as specified Linear Feet 57.00 2404 Furnish and install storm sewer marker balls; complete as specified Each 250.00 2406 Furnish and install storm sewer clay dams; complete as specified Each 123.00 2408 Furnish and install storm sewer lateral inlet; complete as specified Each 121.00 Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $160.00 $4,800.00 $175.50 $5,265.00 $1,050.00 $107,100.00 $870.00 $88,740.00 $1,155.00 $56,595.00 $1,100.00 $53,900.00 $1,250.00 $7,500.00 $1,275.00 $7,650.00 $1,050.00 $9,450.00 $864.00 $7,776.00 $4,000.00 $8,000.00 $3,510.00 $7,020.00 $3,560.00 $178,000.00 $3,690.00 $184,500.00 $70.00 $301,000.00 $60.00 $258,000.00 $80.00 $4,560.00 $73.00 $4,161.00 $30.00 $7,500.00 $35.00 $8,750.00 $50.00 $6,150.00 $300.00 $36,900.00 $1,200.00 $145,200.00 $1,294.00 $156,574.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 20 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 2414 Storm lateral inlet adjustments; complete as specified Each 20.00 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 96.00 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 88.00 2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 2.00 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 130.00 2518 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specified Linear Feet 100.00 2524 Furnish; install; maintain; and remove dewatering tank system; complete as specified Each 2.00 2750 Rock excavation; complete as specified Cubic Yards 100.00 2800 Abandon 8" - 12" storm sewer; complete as specified Linear Feet 205.00 2802 Abandon 15" and larger storm sewer; complete as specified Linear Feet 780.00 2804 Remove 30" and smaller storm sewer; complete as specified Linear Feet 770.00 2810 Abandon storm sewer manholes and inlets; complete as specified Each 14.00 Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $75.00 $1,500.00 $50.00 $1,000.00 $80.00 $7,680.00 $75.00 $7,200.00 $26.00 $2,288.00 $25.00 $2,200.00 $1,000.00 $2,000.00 $1,000.00 $2,000.00 $11.30 $1,469.00 $11.00 $1,430.00 $6.25 $625.00 $6.10 $610.00 $2,000.00 $4,000.00 $1,000.00 $2,000.00 $0.01 $1.00 $0.01 $1.00 $10.00 $2,050.00 $10.00 $2,050.00 $20.00 $15,600.00 $35.00 $27,300.00 $50.00 $38,500.00 $55.00 $42,350.00 $450.00 $6,300.00 $400.00 $5,600.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 21 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 2812 Remove storm sewer manholes and inlets; complete as specified Each 21.00 2850 Connect to existing storm sewer main; complete as specified Each 12.00 2852 Connect to existing storm sewer lateral; complete as specified Each 2.00 2856 Connect to existing storm sewer manhole; complete as specified Each 3.00 2858 Connect to existing storm sewer inlet; complete as specified Each 5.00 2914 Storm sewer utility line opening (ULO); complete as specified Each 4.00 2950 Excavation special (storm); complete as specified Tons 150.00 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 4,320.00 3002 Furnish and install 10" sanitary sewer (relay); complete as specified Linear Feet 50.00 3004 Furnish and install 12" sanitary sewer (relay); complete as specified Linear Feet 35.00 3006 Furnish and install 15" sanitary sewer (relay); complete as specified Linear Feet 50.00 3012 Furnish and install 24" sanitary sewer (relay); complete as specified Linear Feet 15.00 3060 Furnish and install 8" sanitary sewer drop; complete as specified Vertical Feet 10.00 Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $500.00 $10,500.00 $500.00 $10,500.00 $1,400.00 $16,800.00 $1,000.00 $12,000.00 $200.00 $400.00 $300.00 $600.00 $600.00 $1,800.00 $1,200.00 $3,600.00 $450.00 $2,250.00 $800.00 $4,000.00 $550.00 $2,200.00 $750.00 $3,000.00 $16.00 $2,400.00 $14.00 $2,100.00 $136.00 $587,520.00 $179.00 $773,280.00 $137.00 $6,850.00 $283.50 $14,175.00 $151.00 $5,285.00 $293.00 $10,255.00 $166.00 $8,300.00 $224.00 $11,200.00 $350.00 $5,250.00 $308.00 $4,620.00 $550.00 $5,500.00 $831.00 $8,310.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 22 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 3064 Furnish and install 12" sanitary sewer drop; complete as specified Vertical Feet 5.00 3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 220.00 3114 Furnish and install sanitary sewer external manhole chimney seal; complete as specified Each 22.00 3118 Furnish and install sanitary sewer internal manhole chimney seal; complete as specified Each 5.00 3119 Furnish and install 10" sanitary sewer internal manhole chimney seal; complete as specified Each 5.00 3200 Furnish and install 8" x 4" sanitary sewer factory wyes or tees; complete as specified Each 1.00 3210 Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specified Each 131.00 3230 Furnish and install 4" sanitary sewer laterals (new); complete as specified Linear Feet 40.00 3234 Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specified Linear Feet 4,700.00 3235 Furnish and install 4"/6" sanitary sewer riser (relay); complete as specified Linear Feet 100.00 Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $900.00 $4,500.00 $1,178.00 $5,890.00 $682.00 $150,040.00 $631.00 $138,820.00 $560.00 $12,320.00 $550.00 $12,100.00 $500.00 $2,500.00 $425.00 $2,125.00 $530.00 $2,650.00 $275.00 $1,375.00 $130.00 $130.00 $108.00 $108.00 $150.00 $19,650.00 $129.00 $16,899.00 $115.00 $4,600.00 $132.00 $5,280.00 $110.00 $517,000.00 $132.00 $620,400.00 $120.00 $12,000.00 $132.00 $13,200.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 23 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 3236 Furnish and install sanitary sewer lateral marker balls; complete as specified Each 270.00 3238 Furnish and install clay dams; complete as specified Each 132.00 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 4.00 3302 Furnish and install connection to existing 10" sanitary sewer mains; complete as specified Each 3.00 3304 Furnish and install connection to existing 12" sanitary sewer mains; complete as specified Each 1.00 3306 Furnish and install connection to existing 15" sanitary sewer mains; complete as specified Each 1.00 3312 Furnish and install connection to existing 24" sanitary sewer mains; complete as specified Each 1.00 3330 Furnish and install sanitary sewer concrete collars; complete as specified Each 2.00 3601 Utility trench rock excavation (sanitary); complete as specified Linear Feet 850.00 3700 Closed circuit televising; complete as specified Linear Feet 4,470.00 3710 Closed circuit televising - using push camera; complete as specified Each 5.00 Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $30.00 $8,100.00 $35.00 $9,450.00 $95.00 $12,540.00 $300.00 $39,600.00 $2,000.00 $8,000.00 $1,000.00 $4,000.00 $2,000.00 $6,000.00 $1,000.00 $3,000.00 $2,000.00 $2,000.00 $1,500.00 $1,500.00 $2,300.00 $2,300.00 $1,000.00 $1,000.00 $2,850.00 $2,850.00 $4,000.00 $4,000.00 $500.00 $1,000.00 $500.00 $1,000.00 $0.01 $8.50 $0.01 $8.50 $1.39 $6,213.30 $1.35 $6,034.50 $300.00 $1,500.00 $300.00 $1,500.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 24 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 3800 Abandon sanitary sewer manholes; complete as specified Each 4.00 3806 Abandon 12" sanitary sewer; complete as specified Linear Feet 30.00 3818 Abandon 30" sanitary sewer; complete as specified Linear Feet 1,170.00 3852 Remove sanitary sewer manholes; complete as specified Each 3.00 3854 Remove sanitary sewer; complete as specified Linear Feet 200.00 3890 Sanitary sewer utility line opening (ULO); complete as specified Each 3.00 3892 Excavation special (sanitary); complete as specified Tons 40.00 4000 Furnish and install 4" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 30.00 4002 Furnish and install 6" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 230.00 4004 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 4,600.00 4006 Furnish and install 10" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 5.00 4008 Furnish and install 12" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 170.00 Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $500.00 $2,000.00 $500.00 $2,000.00 $15.00 $450.00 $12.00 $360.00 $55.00 $64,350.00 $45.00 $52,650.00 $750.00 $2,250.00 $600.00 $1,800.00 $100.00 $20,000.00 $75.00 $15,000.00 $750.00 $2,250.00 $750.00 $2,250.00 $16.00 $640.00 $14.00 $560.00 $175.00 $5,250.00 $163.00 $4,890.00 $149.00 $34,270.00 $128.00 $29,440.00 $140.00 $644,000.00 $144.00 $662,400.00 $170.00 $850.00 $338.00 $1,690.00 $225.00 $38,250.00 $225.00 $38,250.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 25 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 4036 Furnish and install 1" water service (relay); complete as specified Linear Feet 4,600.00 4042 Furnish and install 1" water service (new); complete as specified Linear Feet 50.00 4048 Furnish and install 1" corporation and stop box; complete as specified Each 128.00 4055 Furnish and install water service clay dams; complete as specified Each 129.00 4056 Furnish and install connections to existing 4" water main; complete as specified Each 1.00 4058 Furnish and install connections to existing 6" water main; complete as specified Each 4.00 4060 Furnish and install connections to existing 8" water main; complete as specified Each 6.00 4062 Furnish and install connections to existing 10" water main; complete as specified Each 1.00 4064 Furnish and install connections to existing 12" water main; complete as specified Each 2.00 4080 Temporary water main; complete as specified Lump Sum 1.00 4109 Furnish and install 8" x 4" water main tee; complete as specified Each 1.00 4110 Furnish and install 8" x 6" water main tee; complete as specified Each 9.00 Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $83.00 $381,800.00 $95.00 $437,000.00 $85.00 $4,250.00 $95.00 $4,750.00 $525.00 $67,200.00 $691.00 $88,448.00 $75.00 $9,675.00 $150.00 $19,350.00 $2,000.00 $2,000.00 $2,022.00 $2,022.00 $2,500.00 $10,000.00 $2,514.00 $10,056.00 $2,800.00 $16,800.00 $2,921.00 $17,526.00 $3,000.00 $3,000.00 $3,283.00 $3,283.00 $3,600.00 $7,200.00 $3,591.00 $7,182.00 $20,000.00 $20,000.00 $19,800.00 $19,800.00 $585.00 $585.00 $584.00 $584.00 $775.00 $6,975.00 $768.00 $6,912.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 26 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 4111 Furnish and install 8" x 8" water main tee; complete as specified Each 5.00 4189 Furnish and install 8" x 8" water main cross; complete as specified Each 2.00 4191 Furnish and install 8" x 12" water main cross; complete as specified Each 1.00 4219 Furnish and install 8" 11- 1/4 degree water main bend; complete as specified Each 1.00 4227 Furnish and install 6" 22- 1/2 degree water main bend; complete as specified Each 2.00 4236 Furnish and install 6" 45 degree water main bend; complete as specified Each 28.00 4237 Furnish and install 8" 45 degree water main bend; complete as specified Each 12.00 4239 Furnish and install 12" 45 degree water main bend; complete as specified Each 4.00 4264 Furnish and install 8" x 6" water main reducer; complete as specified Each 4.00 4267 Furnish and install 10" x 8" water main reducer; complete as specified Each 1.00 4350 Cut and cap existing 4" water main; complete as specified Each 2.00 4352 Cut and cap existing 6" water main; complete as specified Each 2.00 4354 Cut and cap existing 8" water main; complete as specified Each 2.00 Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $900.00 $4,500.00 $888.00 $4,440.00 $1,200.00 $2,400.00 $1,138.00 $2,276.00 $1,555.00 $1,555.00 $1,502.00 $1,502.00 $500.00 $500.00 $450.00 $450.00 $365.00 $730.00 $328.00 $656.00 $380.00 $10,640.00 $342.00 $9,576.00 $525.00 $6,300.00 $475.00 $5,700.00 $1,040.00 $4,160.00 $982.00 $3,928.00 $450.00 $1,800.00 $397.00 $1,588.00 $580.00 $580.00 $537.00 $537.00 $1,000.00 $2,000.00 $2,113.00 $4,226.00 $1,150.00 $2,300.00 $2,467.00 $4,934.00 $1,400.00 $2,800.00 $2,757.00 $5,514.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 27 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 4358 Cut and cap existing 12" water main; complete as specified Each 2.00 4400 Furnish and install 4" water main gate valve; complete as specified Each 1.00 4401 Furnish and install 6" water main gate valve; complete as specified Each 10.00 4402 Furnish and install 8" water main gate valve; complete as specified Each 40.00 4403 Furnish and install 10" water main gate valve; complete as specified Each 1.00 4404 Furnish and install 12" water main gate valve; complete as specified Each 2.00 4500 Furnish and install hydrant; complete as specified Each 9.00 4801 Utility trench rock excavation; complete as specified Linear Feet 175.00 4900 Abandon water main on West 16th Avenue; complete as specified Lump Sum 1.00 4902 Abandon water main on Ohio Street; complete as specified Lump Sum 1.00 4920 Remove water main; complete as specified Linear Feet 800.00 4990 Excavation special (water); complete as specified Tons 40.00 5016 Furnish and install pull box (steel); 24" x 36"; complete as specified Each 5.00 5025 Adjust pull box; complete as specified Each 5.00 Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $1,700.00 $3,400.00 $2,900.00 $5,800.00 $1,700.00 $1,700.00 $1,608.00 $1,608.00 $2,025.00 $20,250.00 $1,926.00 $19,260.00 $2,825.00 $113,000.00 $2,731.00 $109,240.00 $3,985.00 $3,985.00 $3,900.00 $3,900.00 $4,925.00 $9,850.00 $4,833.00 $9,666.00 $6,050.00 $54,450.00 $6,766.00 $60,894.00 $10.00 $1,750.00 $50.00 $8,750.00 $9,250.00 $9,250.00 $12,500.00 $12,500.00 $7,000.00 $7,000.00 $8,500.00 $8,500.00 $62.00 $49,600.00 $50.00 $40,000.00 $16.00 $640.00 $14.00 $560.00 $900.00 $4,500.00 $875.00 $4,375.00 $5.15 $25.75 $5.00 $25.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 28 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 5027 Remove concrete base; complete as specified Each 6.00 5130 Furnish and install 3" Schedule 40 PVC; complete as specified Linear Feet 450.00 5181 Connect to existing conduit; complete as specified Each 5.00 5262 Furnish and install 10 gauge green-coated wire; complete as specified Linear Feet 450.00 5356 Furnish and install 14 gauge stranded single pair twisted with shield; complete as specified Linear Feet 750.00 5372 Furnish and install 14 AWG solid 21 conductor; complete as specified Linear Feet 850.00 5421 Install CITY-supplied 13' traffic signal pole with a pedestal base; complete as specified Each 2.00 5424 Install CITY-supplied 20' traffic signal pole with a pedestal base; complete as specified Each 2.00 5430 Install CITY-supplied 20' trombone arm; complete as specified Each 2.00 5434 Install CITY-supplied three-section traffic signal head; back plate; and LED modules; complete as specified Each 5.00 5436 Install CITY-supplied five- section traffic signal head; back plate; and LED modules; complete as specified Each 1.00 Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $206.00 $1,236.00 $200.00 $1,200.00 $12.36 $5,562.00 $12.00 $5,400.00 $128.75 $643.75 $125.00 $625.00 $0.93 $418.50 $0.90 $405.00 $1.80 $1,350.00 $1.75 $1,312.50 $4.90 $4,165.00 $4.75 $4,037.50 $103.00 $206.00 $100.00 $200.00 $310.00 $620.00 $300.00 $600.00 $310.00 $620.00 $300.00 $600.00 $155.00 $775.00 $150.00 $750.00 $180.00 $180.00 $175.00 $175.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 29 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 5438 Install CITY-supplied pedestrian signal head with countdown timer; complete as specified Each 4.00 5440 Install CITY-supplied pedestrian push button; complete as specified Each 4.00 5502 Furnish and install Type 2 base; complete as specified Each 4.00 5506 Furnish and install Type 9 base; complete as specified Each 1.00 Bid Total: Unit Price Extension Unit Price Extension David Tenor Corporation Advance Construction Inc. $130.00 $520.00 $125.00 $500.00 $130.00 $520.00 $125.00 $500.00 $1,805.00 $7,220.00 $1,750.00 $7,000.00 $2,275.00 $2,275.00 $2,200.00 $2,200.00 $7,259,127.48 $7,454,832.72 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 30 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity Section 1 1011 Clearing; complete as specified Inch Diameter 549.00 1021 Grubbing; complete as specified Inch Diameter 549.00 1050 Mobilization; complete as specified Lump Sum 1.00 1051 Business access plan and signage; complete as specified Each 2.00 1100 Removing pavement; complete as specified Square Yards 9,725.00 1110 Removing curb and gutter; complete as specified Linear Feet 4,800.00 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 71,250.00 1200 Unclassified excavation; complete as specified Cubic Yards 5,880.00 1220 Excavation special (paving); complete as specified Tons 870.00 1301 7" concrete pavement; with 5" CABC and grading; complete as specified Square Yards 16,000.00 1303 7" concrete pavement HES; with 5" CABC and grading; complete as specified Square Yards 2,000.00 1313 8" concrete pavement HES; with 6" CABC and grading; complete as specified Square Yards 805.00 1334 Concrete pavement gaps; complete as specified Each 2.00 1340 Crushed aggregate base course; complete as specified Tons 870.00 Unit Price Extension Unit Price Extension $7,490,020.29 $7,859,647.24 $24.15 $13,258.35 $20.00 $10,980.00 $16.80 $9,223.20 $20.00 $10,980.00 $685,000.00 $685,000.00 $837,500.00 $837,500.00 $400.00 $800.00 $350.00 $700.00 $0.01 $97.25 $5.00 $48,625.00 $0.01 $48.00 $3.00 $14,400.00 $0.75 $53,437.50 $0.70 $49,875.00 $21.65 $127,302.00 $20.00 $117,600.00 $0.01 $8.70 $0.01 $8.70 $55.80 $892,800.00 $53.15 $850,400.00 $57.90 $115,800.00 $55.15 $110,300.00 $88.50 $71,242.50 $83.26 $67,024.30 $0.01 $0.02 $0.01 $0.02 $15.45 $13,441.50 $14.70 $12,789.00 Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 31 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 1350 Pavement ties; complete as specified Each 51.00 1352 Drilled dowel bars; 1"; complete as specified Each 134.00 1354 Drilled dowel bars; 1 1/4"; complete as specified Each 128.00 1360 Adjust manholes and inlets; complete as specified Each 117.00 1370 Turf restoration; complete as specified Square Yards 8,950.00 1372 Restore gravel driveway/apron; complete as specified Square Yards 65.00 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 1,845.00 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 365.00 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 963.00 1440 30" curb and gutter; 7"; with 5" CABC and grading; complete as specified Linear Feet 40.00 1460 Sidewalk curb; complete as specified Linear Feet 285.00 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 34,250.00 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 27,500.00 Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $9.45 $481.95 $9.00 $459.00 $14.70 $1,969.80 $14.00 $1,876.00 $17.35 $2,220.80 $16.50 $2,112.00 $600.00 $70,200.00 $400.00 $46,800.00 $7.10 $63,545.00 $10.00 $89,500.00 $31.50 $2,047.50 $30.00 $1,950.00 $0.01 $18.45 $0.01 $18.45 $0.01 $3.65 $0.01 $3.65 $13.65 $13,144.95 $13.00 $12,519.00 $70.35 $2,814.00 $67.00 $2,680.00 $78.75 $22,443.75 $75.00 $21,375.00 $8.30 $284,275.00 $7.75 $265,437.50 $8.40 $231,000.00 $8.00 $220,000.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 32 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 1514 6" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete as specified Square Feet 5,960.00 1530 6" concrete step; complete as specified Square Feet 1,260.00 1540 Curb ramp detectable warning field (natural/non-painted); complete as specified Square Feet 460.00 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 11,500.00 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 690.00 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 6,760.00 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 6,760.00 1590 Up-charge for late season cold weather concrete sidewalk; complete as specified Cubic Yards 105.00 1600 Furnish and install tree; complete as specified Each 54.00 1650 Locate existing property monuments; complete as specified Each 53.00 1651 Replace section corner; complete as specified Each 1.00 1652 Replace existing property monuments; complete as specified Each 53.00 Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $8.85 $52,746.00 $8.25 $49,170.00 $78.75 $99,225.00 $75.00 $94,500.00 $42.00 $19,320.00 $40.00 $18,400.00 $2.10 $24,150.00 $2.00 $23,000.00 $8.40 $5,796.00 $8.00 $5,520.00 $0.01 $67.60 $0.01 $67.60 $0.01 $67.60 $0.01 $67.60 $15.75 $1,653.75 $0.01 $1.05 $685.00 $36,990.00 $700.00 $37,800.00 $135.00 $7,155.00 $125.00 $6,625.00 $1,100.00 $1,100.00 $1,050.00 $1,050.00 $30.00 $1,590.00 $25.00 $1,325.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 33 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 1700 Sawing existing pavement; complete as specified Linear Feet 1,835.00 1710 Sawing concrete pavement full depth; complete as specified Linear Feet 565.00 1900 Tack coat; complete as specified Gallons 40.00 1911 4" asphaltic transition LT with 10" CABC and grading; complete as specified Square Yards 405.00 1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 185.00 1917 2" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 50.00 1918 Asphaltic cold weather paving up-charge; complete as specified Square Yards 58.00 2002 Furnish and install 10" storm sewer; complete as specified Linear Feet 45.00 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 898.00 2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 875.00 2009 Furnish and install 18" storm sewer; complete as specified Linear Feet 1,550.00 2012 Furnish and install 21" storm sewer; complete as specified Linear Feet 1,180.00 2018 Furnish and install 27" storm sewer; complete as specified Linear Feet 850.00 Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $3.00 $5,505.00 $2.00 $3,670.00 $5.00 $2,825.00 $2.50 $1,412.50 $9.20 $368.00 $8.75 $350.00 $57.00 $23,085.00 $53.75 $21,768.75 $61.00 $11,285.00 $57.65 $10,665.25 $67.30 $3,365.00 $66.30 $3,315.00 $1.05 $60.90 $0.01 $0.58 $79.00 $3,555.00 $95.00 $4,275.00 $76.00 $68,248.00 $97.00 $87,106.00 $81.00 $70,875.00 $100.00 $87,500.00 $93.00 $144,150.00 $108.00 $167,400.00 $106.00 $125,080.00 $138.00 $162,840.00 $118.00 $100,300.00 $180.00 $153,000.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 34 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 2021 Furnish and install 30" storm sewer; complete as specified Linear Feet 30.00 2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 102.00 2202 Furnish and install standard storm sewer manhole (5' diameter); complete as specified Vertical Feet 49.00 2203 Furnish and install standard storm sewer manhole (6' diameter); complete as specified Vertical Feet 6.00 2213 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as specified Vertical Feet 9.00 2235 Furnish and install Type 1 inlet (with 18" sump); complete as specified Each 2.00 2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 50.00 2400 Furnish and install 6" storm sewer lateral; complete as specified Linear Feet 4,300.00 2402 Furnish and install 8" storm sewer lateral; complete as specified Linear Feet 57.00 2404 Furnish and install storm sewer marker balls; complete as specified Each 250.00 2406 Furnish and install storm sewer clay dams; complete as specified Each 123.00 2408 Furnish and install storm sewer lateral inlet; complete as specified Each 121.00 Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $130.00 $3,900.00 $190.00 $5,700.00 $1,090.00 $111,180.00 $600.00 $61,200.00 $1,280.00 $62,720.00 $825.00 $40,425.00 $1,500.00 $9,000.00 $1,100.00 $6,600.00 $1,150.00 $10,350.00 $650.00 $5,850.00 $3,500.00 $7,000.00 $3,500.00 $7,000.00 $3,350.00 $167,500.00 $4,000.00 $200,000.00 $79.00 $339,700.00 $80.00 $344,000.00 $85.00 $4,845.00 $82.00 $4,674.00 $30.00 $7,500.00 $25.00 $6,250.00 $75.00 $9,225.00 $100.00 $12,300.00 $1,100.00 $133,100.00 $1,500.00 $181,500.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 35 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 2414 Storm lateral inlet adjustments; complete as specified Each 20.00 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 96.00 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 88.00 2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 2.00 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 130.00 2518 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specified Linear Feet 100.00 2524 Furnish; install; maintain; and remove dewatering tank system; complete as specified Each 2.00 2750 Rock excavation; complete as specified Cubic Yards 100.00 2800 Abandon 8" - 12" storm sewer; complete as specified Linear Feet 205.00 2802 Abandon 15" and larger storm sewer; complete as specified Linear Feet 780.00 2804 Remove 30" and smaller storm sewer; complete as specified Linear Feet 770.00 2810 Abandon storm sewer manholes and inlets; complete as specified Each 14.00 Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $100.00 $2,000.00 $100.00 $2,000.00 $80.00 $7,680.00 $100.00 $9,600.00 $30.00 $2,640.00 $10.00 $880.00 $750.00 $1,500.00 $0.01 $0.02 $11.50 $1,495.00 $10.00 $1,300.00 $6.30 $630.00 $10.00 $1,000.00 $0.01 $0.02 $0.01 $0.02 $0.01 $1.00 $0.01 $1.00 $10.00 $2,050.00 $15.00 $3,075.00 $25.00 $19,500.00 $20.00 $15,600.00 $44.00 $33,880.00 $25.00 $19,250.00 $500.00 $7,000.00 $400.00 $5,600.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 36 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 2812 Remove storm sewer manholes and inlets; complete as specified Each 21.00 2850 Connect to existing storm sewer main; complete as specified Each 12.00 2852 Connect to existing storm sewer lateral; complete as specified Each 2.00 2856 Connect to existing storm sewer manhole; complete as specified Each 3.00 2858 Connect to existing storm sewer inlet; complete as specified Each 5.00 2914 Storm sewer utility line opening (ULO); complete as specified Each 4.00 2950 Excavation special (storm); complete as specified Tons 150.00 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 4,320.00 3002 Furnish and install 10" sanitary sewer (relay); complete as specified Linear Feet 50.00 3004 Furnish and install 12" sanitary sewer (relay); complete as specified Linear Feet 35.00 3006 Furnish and install 15" sanitary sewer (relay); complete as specified Linear Feet 50.00 3012 Furnish and install 24" sanitary sewer (relay); complete as specified Linear Feet 15.00 3060 Furnish and install 8" sanitary sewer drop; complete as specified Vertical Feet 10.00 Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $500.00 $10,500.00 $500.00 $10,500.00 $1,500.00 $18,000.00 $1,200.00 $14,400.00 $750.00 $1,500.00 $200.00 $400.00 $2,000.00 $6,000.00 $500.00 $1,500.00 $1,500.00 $7,500.00 $500.00 $2,500.00 $750.00 $3,000.00 $600.00 $2,400.00 $0.01 $1.50 $15.00 $2,250.00 $139.00 $600,480.00 $140.00 $604,800.00 $144.00 $7,200.00 $160.00 $8,000.00 $150.00 $5,250.00 $200.00 $7,000.00 $160.00 $8,000.00 $225.00 $11,250.00 $200.00 $3,000.00 $275.00 $4,125.00 $1,100.00 $11,000.00 $800.00 $8,000.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 37 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 3064 Furnish and install 12" sanitary sewer drop; complete as specified Vertical Feet 5.00 3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 220.00 3114 Furnish and install sanitary sewer external manhole chimney seal; complete as specified Each 22.00 3118 Furnish and install sanitary sewer internal manhole chimney seal; complete as specified Each 5.00 3119 Furnish and install 10" sanitary sewer internal manhole chimney seal; complete as specified Each 5.00 3200 Furnish and install 8" x 4" sanitary sewer factory wyes or tees; complete as specified Each 1.00 3210 Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specified Each 131.00 3230 Furnish and install 4" sanitary sewer laterals (new); complete as specified Linear Feet 40.00 3234 Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specified Linear Feet 4,700.00 3235 Furnish and install 4"/6" sanitary sewer riser (relay); complete as specified Linear Feet 100.00 Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $1,500.00 $7,500.00 $1,750.00 $8,750.00 $540.00 $118,800.00 $575.00 $126,500.00 $600.00 $13,200.00 $550.00 $12,100.00 $500.00 $2,500.00 $450.00 $2,250.00 $750.00 $3,750.00 $500.00 $2,500.00 $100.00 $100.00 $250.00 $250.00 $125.00 $16,375.00 $350.00 $45,850.00 $105.00 $4,200.00 $100.00 $4,000.00 $106.00 $498,200.00 $110.00 $517,000.00 $106.00 $10,600.00 $115.00 $11,500.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 38 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 3236 Furnish and install sanitary sewer lateral marker balls; complete as specified Each 270.00 3238 Furnish and install clay dams; complete as specified Each 132.00 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 4.00 3302 Furnish and install connection to existing 10" sanitary sewer mains; complete as specified Each 3.00 3304 Furnish and install connection to existing 12" sanitary sewer mains; complete as specified Each 1.00 3306 Furnish and install connection to existing 15" sanitary sewer mains; complete as specified Each 1.00 3312 Furnish and install connection to existing 24" sanitary sewer mains; complete as specified Each 1.00 3330 Furnish and install sanitary sewer concrete collars; complete as specified Each 2.00 3601 Utility trench rock excavation (sanitary); complete as specified Linear Feet 850.00 3700 Closed circuit televising; complete as specified Linear Feet 4,470.00 3710 Closed circuit televising - using push camera; complete as specified Each 5.00 Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $30.00 $8,100.00 $25.00 $6,750.00 $75.00 $9,900.00 $100.00 $13,200.00 $1,000.00 $4,000.00 $1,500.00 $6,000.00 $1,200.00 $3,600.00 $1,800.00 $5,400.00 $1,500.00 $1,500.00 $2,300.00 $2,300.00 $2,000.00 $2,000.00 $2,800.00 $2,800.00 $10,000.00 $10,000.00 $3,500.00 $3,500.00 $1,000.00 $2,000.00 $800.00 $1,600.00 $0.01 $8.50 $0.01 $8.50 $1.50 $6,705.00 $2.00 $8,940.00 $400.00 $2,000.00 $400.00 $2,000.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 39 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 3800 Abandon sanitary sewer manholes; complete as specified Each 4.00 3806 Abandon 12" sanitary sewer; complete as specified Linear Feet 30.00 3818 Abandon 30" sanitary sewer; complete as specified Linear Feet 1,170.00 3852 Remove sanitary sewer manholes; complete as specified Each 3.00 3854 Remove sanitary sewer; complete as specified Linear Feet 200.00 3890 Sanitary sewer utility line opening (ULO); complete as specified Each 3.00 3892 Excavation special (sanitary); complete as specified Tons 40.00 4000 Furnish and install 4" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 30.00 4002 Furnish and install 6" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 230.00 4004 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 4,600.00 4006 Furnish and install 10" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 5.00 4008 Furnish and install 12" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 170.00 Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $500.00 $2,000.00 $800.00 $3,200.00 $15.00 $450.00 $16.00 $480.00 $36.00 $42,120.00 $25.00 $29,250.00 $500.00 $1,500.00 $800.00 $2,400.00 $60.00 $12,000.00 $60.00 $12,000.00 $750.00 $2,250.00 $600.00 $1,800.00 $0.01 $0.40 $15.00 $600.00 $135.00 $4,050.00 $140.00 $4,200.00 $125.00 $28,750.00 $130.00 $29,900.00 $137.00 $630,200.00 $138.00 $634,800.00 $180.00 $900.00 $160.00 $800.00 $170.00 $28,900.00 $170.00 $28,900.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 40 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 4036 Furnish and install 1" water service (relay); complete as specified Linear Feet 4,600.00 4042 Furnish and install 1" water service (new); complete as specified Linear Feet 50.00 4048 Furnish and install 1" corporation and stop box; complete as specified Each 128.00 4055 Furnish and install water service clay dams; complete as specified Each 129.00 4056 Furnish and install connections to existing 4" water main; complete as specified Each 1.00 4058 Furnish and install connections to existing 6" water main; complete as specified Each 4.00 4060 Furnish and install connections to existing 8" water main; complete as specified Each 6.00 4062 Furnish and install connections to existing 10" water main; complete as specified Each 1.00 4064 Furnish and install connections to existing 12" water main; complete as specified Each 2.00 4080 Temporary water main; complete as specified Lump Sum 1.00 4109 Furnish and install 8" x 4" water main tee; complete as specified Each 1.00 4110 Furnish and install 8" x 6" water main tee; complete as specified Each 9.00 Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $88.00 $404,800.00 $110.00 $506,000.00 $88.00 $4,400.00 $105.00 $5,250.00 $550.00 $70,400.00 $500.00 $64,000.00 $50.00 $6,450.00 $100.00 $12,900.00 $1,750.00 $1,750.00 $1,800.00 $1,800.00 $2,000.00 $8,000.00 $2,000.00 $8,000.00 $2,250.00 $13,500.00 $2,500.00 $15,000.00 $2,500.00 $2,500.00 $3,000.00 $3,000.00 $2,750.00 $5,500.00 $3,500.00 $7,000.00 $15,000.00 $15,000.00 $18,000.00 $18,000.00 $620.00 $620.00 $750.00 $750.00 $800.00 $7,200.00 $800.00 $7,200.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 41 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 4111 Furnish and install 8" x 8" water main tee; complete as specified Each 5.00 4189 Furnish and install 8" x 8" water main cross; complete as specified Each 2.00 4191 Furnish and install 8" x 12" water main cross; complete as specified Each 1.00 4219 Furnish and install 8" 11- 1/4 degree water main bend; complete as specified Each 1.00 4227 Furnish and install 6" 22- 1/2 degree water main bend; complete as specified Each 2.00 4236 Furnish and install 6" 45 degree water main bend; complete as specified Each 28.00 4237 Furnish and install 8" 45 degree water main bend; complete as specified Each 12.00 4239 Furnish and install 12" 45 degree water main bend; complete as specified Each 4.00 4264 Furnish and install 8" x 6" water main reducer; complete as specified Each 4.00 4267 Furnish and install 10" x 8" water main reducer; complete as specified Each 1.00 4350 Cut and cap existing 4" water main; complete as specified Each 2.00 4352 Cut and cap existing 6" water main; complete as specified Each 2.00 4354 Cut and cap existing 8" water main; complete as specified Each 2.00 Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $910.00 $4,550.00 $100.00 $500.00 $1,175.00 $2,350.00 $650.00 $1,300.00 $1,575.00 $1,575.00 $1,250.00 $1,250.00 $460.00 $460.00 $1,600.00 $1,600.00 $335.00 $670.00 $45.00 $90.00 $350.00 $9,800.00 $550.00 $15,400.00 $490.00 $5,880.00 $600.00 $7,200.00 $1,050.00 $4,200.00 $1,200.00 $4,800.00 $415.00 $1,660.00 $650.00 $2,600.00 $565.00 $565.00 $800.00 $800.00 $1,500.00 $3,000.00 $450.00 $900.00 $1,600.00 $3,200.00 $500.00 $1,000.00 $1,700.00 $3,400.00 $550.00 $1,100.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 42 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 4358 Cut and cap existing 12" water main; complete as specified Each 2.00 4400 Furnish and install 4" water main gate valve; complete as specified Each 1.00 4401 Furnish and install 6" water main gate valve; complete as specified Each 10.00 4402 Furnish and install 8" water main gate valve; complete as specified Each 40.00 4403 Furnish and install 10" water main gate valve; complete as specified Each 1.00 4404 Furnish and install 12" water main gate valve; complete as specified Each 2.00 4500 Furnish and install hydrant; complete as specified Each 9.00 4801 Utility trench rock excavation; complete as specified Linear Feet 175.00 4900 Abandon water main on West 16th Avenue; complete as specified Lump Sum 1.00 4902 Abandon water main on Ohio Street; complete as specified Lump Sum 1.00 4920 Remove water main; complete as specified Linear Feet 800.00 4990 Excavation special (water); complete as specified Tons 40.00 5016 Furnish and install pull box (steel); 24" x 36"; complete as specified Each 5.00 5025 Adjust pull box; complete as specified Each 5.00 Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $1,800.00 $3,600.00 $700.00 $1,400.00 $1,825.00 $1,825.00 $2,100.00 $2,100.00 $2,175.00 $21,750.00 $2,500.00 $25,000.00 $3,100.00 $124,000.00 $3,200.00 $128,000.00 $4,400.00 $4,400.00 $4,500.00 $4,500.00 $5,400.00 $10,800.00 $5,500.00 $11,000.00 $5,900.00 $53,100.00 $6,000.00 $54,000.00 $0.01 $1.75 $0.01 $1.75 $14,000.00 $14,000.00 $10,000.00 $10,000.00 $14,000.00 $14,000.00 $2,000.00 $2,000.00 $50.00 $40,000.00 $30.00 $24,000.00 $0.01 $0.40 $15.00 $600.00 $915.00 $4,575.00 $875.00 $4,375.00 $105.00 $525.00 $105.00 $525.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 43 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 5027 Remove concrete base; complete as specified Each 6.00 5130 Furnish and install 3" Schedule 40 PVC; complete as specified Linear Feet 450.00 5181 Connect to existing conduit; complete as specified Each 5.00 5262 Furnish and install 10 gauge green-coated wire; complete as specified Linear Feet 450.00 5356 Furnish and install 14 gauge stranded single pair twisted with shield; complete as specified Linear Feet 750.00 5372 Furnish and install 14 AWG solid 21 conductor; complete as specified Linear Feet 850.00 5421 Install CITY-supplied 13' traffic signal pole with a pedestal base; complete as specified Each 2.00 5424 Install CITY-supplied 20' traffic signal pole with a pedestal base; complete as specified Each 2.00 5430 Install CITY-supplied 20' trombone arm; complete as specified Each 2.00 5434 Install CITY-supplied three-section traffic signal head; back plate; and LED modules; complete as specified Each 5.00 5436 Install CITY-supplied five- section traffic signal head; back plate; and LED modules; complete as specified Each 1.00 Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $210.00 $1,260.00 $200.00 $1,200.00 $12.60 $5,670.00 $12.00 $5,400.00 $130.00 $650.00 $125.00 $625.00 $0.95 $427.50 $0.90 $405.00 $1.85 $1,387.50 $1.75 $1,312.50 $5.00 $4,250.00 $4.75 $4,037.50 $105.00 $210.00 $100.00 $200.00 $315.00 $630.00 $300.00 $600.00 $315.00 $630.00 $300.00 $600.00 $160.00 $800.00 $150.00 $750.00 $185.00 $185.00 $175.00 $175.00 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 44 of 45 11/3/2025 Contract 26-03 - Ohio Street and West 16th Avenue Reconstruction (#9909642) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 11/03/2025 11:00 AM CST Section Title Item Code Item Description UofM Quantity 5438 Install CITY-supplied pedestrian signal head with countdown timer; complete as specified Each 4.00 5440 Install CITY-supplied pedestrian push button; complete as specified Each 4.00 5502 Furnish and install Type 2 base; complete as specified Each 4.00 5506 Furnish and install Type 9 base; complete as specified Each 1.00 Bid Total: Unit Price Extension Unit Price Extension Jossart Brothers, Inc.Carl Bowers & Sons Const. Co., Inc. $130.00 $520.00 $125.00 $500.00 $130.00 $520.00 $125.00 $500.00 $1,850.00 $7,400.00 $1,750.00 $7,000.00 $2,300.00 $2,300.00 $2,200.00 $2,200.00 $7,490,020.29 $7,859,647.24 I:\Engineering\2021 - 2030 Contracts\2026 CONTRACTS\26-03 Ohio St & W 16th Ave\Administrative\Contract Information\26-03 PTS Bid Tab_11-3-25 Page 45 of 45 11/3/2025 D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Discussion and direction to staff regarding the options available to address the storm sewer easements at 3820 Jackson Street, 3835 Summerset Way, and 3847 Summerset Way A t t a c h m e n t sAttachments Staff Memo - SW Easement Table of Options - SW Easement Brown and Caldwell Technical Memorandum TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager / City Engineer and Sara Rutkowski, Community Development Director DATE: November 6, 2025 RE: Discussion and Direction to Staff Regarding the Options Available to Address the Storm Sewer Easement at 3820 Jackson Street, 3835 Summerset Way, and 3847 Summerset Way BACKGROUND At the September 9, 2025 Council Meeting, the Common Council asked staff to further review different alternatives which would avoid the need for acquiring easements from 3820 Jackson Street (Parcel 91527190100), 3835 Summerset Way (Parcel 91527310000), and 3847 Summerset Way (Parcel 91527320000). Following the meeting, Engineering staff worked with Brown and Caldwell (B&C) to consider potential alternate routes so the existing storm sewer could be abandoned. This work entailed creating a hydrologic and hydraulic (H&H) storm water model and cost estimates of the alternate routes. Community Development staff worked on other alterative options. ANALYSIS B&C began their analysis with four (4) options identified by staff as possible alternatives. Two (2) of the four (4) routes (Route B and Route C) are not hydraulically feasible as they divert runoff into the adjacent Fernau Watershed, which increases flooding near the Jackson Street and West Snell Road intersection. These routes are also among the more expensive options, so further evaluation of these options was not pursued past the preliminary analysis stage. Of the remaining two (2) Engineering options, Route A is the longest route of new or upsized storm sewers at just under 1,900 linear feet, and comes with an estimated construction cost of over $1,600,000. The shortest route, Route D, still requires over 1,200 linear feet of new and upsized storm sewer with an estimated construction cost of over $500,000. Besides the significant construction costs, both Routes A and D require the enlargement of the subdivision outfall to County Park, and involves work within existing easements in the side yards and backyards of four (4) to five (5) properties. Lastly, Route D will still require easements to be obtained; but these easements would be obtained from different property owners than the current property owners under discussion. Route D also has less working space available for construction of a storm sewer (approximately a total of twelve feet (12’), as measured from aerial photography) than the originally-requested area with the existing 24” storm sewer already installed. Community Development staff also looked at the possibility of purchasing the two (2) residential properties. This would allow City staff to have the full access needed to remove and replace the current pipe, put down new pipe, and remove any impediments in the easement area. The properties would then have the easements placed on the parcels, and the properties would be sold to offset the costs. The current assessed values of the two (2) residential properties are $255,300 (3847 Summerset Way) and $258,600 (3835 Summerset Way). It is important to note that acquiring these properties would require consent from the owners to do so, as eminent domain is only an option for the easement area, not the entire property. The final option would be the original staff suggestion of proceeding with negotiations to acquire the easements where the pipe is currently located. Staff would then hire a contractor to try and use trenchless technology to remove the fence posts that have impaled the storm water pipe and structurally line the pipe to allow for the pipe to operate at full capacity. Staff would attempt to minimize the impact to the trees and fence. However, the non-permitted shed would need to be relocated. FISCAL IMPACT There is no fiscal impact to the City at this time until Council determines the next steps. RECOMMENDATION Staff requests direction from Council as to which option to pursue. JLG/tlt Altered Table 1. Alternative Routes Conceptual Design Summary Design Item and Considerations Route A Route B Route C Route D Option E – Purchase Properties Original Offer – Purchase Easements General Location North through North Park Estates Neighborhood South along Jackson Street South on Jackson Street and east along Snell Road to Main Street East through new easement to Summerset Way 3835 Summerset Way, 3847 Summerset Way 3835 Summerset Way, 3847 Summerset Way Total Pipe Length (LF) 2,300 1,705 2,365 1,270 N/A N/A Hydraulic Impacts Addressed with expanded route Impacts along Jackson St & Main St Pond in Fernau Watershed Impacts along Main St & Main St Pond in Fernau Watershed Minor impact at connection point N/A N/A Utility Impacts - Lowering water main (5 locations) - Lowering water laterals (9) - Crossing AT&T duct bank (2 locations) - Lowering water main (2 locations) - Crossing AT&T duct bank (2 locations) - Lowering water main (3 locations) - Crossing AT&T duct bank (2 locations) None None None Tree Impacts - Yes - 6 - Yes - 1 - Yes - 1 - Yes - 13 Yes – remove all impediments Yes – will attempt to minimize Permitting - WisDOT permit for work within Jackson St - WisDOT permit for work within Jackson St - WisDOT permit for work within Jackson St - None None None Permanent Easements - None - None - None - Yes - 2 (3761 and 3749 Summerset Way) Yes – 2 Yes - 2 Construction Cost (Attachment D more details) $1.64 million Cost Excluded (Route isn’t hydraulically feasible) Cost Excluded (Route isn’t hydraulically feasible) $0.52 million Cost of repairing line, removing trees, fencing and shed (internal) Estimated cost of repairing line via trenchless technologies (contractor $30- 40,000) Other Notes & Potential Additional Costs - Would require work within backyard easements of 4-5 residential properties for North Park Estates outfall improvements - Requires disturbance of Snell Road, which was recently reconstructed. - Requires construction between multi-family residential buildings, approx. 12-ft separation - Would require work within backyard easements of 4- 5 residential properties for North Park Estates outfall improvements - Conflicts with ADVOCAP site plan / sanitary sewer - Immediate cost of purchasing property, can be offset by sale of properties - No easement purchase cost as City would put in when owners of properties - Minor administrative costs in purchasing/selling properties (title company etc.) - Cost of easement purchase/eminent domain process if necessary Technical Memorandum Limitations: This document was prepared solely for City of Oshkosh in accordance with professional standards at the time the services were performed and in accordance with the contract between City of Oshkosh and Brown and Caldwell dated September 29, 2025. This document is governed by the specific scope of work authorized by City of Oshkosh; it is not intended to be relied upon by any other party except for regulatory authorities contemplated by the scope of work. We have relied on information or instructions provided by City of Oshkosh and other parties and, unless otherwise expressly indicated, have made no independent investigation as to the validity, completeness, or accuracy of such information. 250 East Wisconsin Avenue, Suite 1600 Milwaukee, WI 53202 T: 414-273-8800 Prepared for: City of Oshkosh Project Title: Jackson Street / Summerset Way Storm Sewer Evaluation Project No.: 197184: 2025 General Storm Water Services Task Order No. 2 Technical Memorandum Subject: Findings Summary TM Date: October 31, 2025 To: Justin Gierach, P.E., Engineering Divisions Manager / City Engineer Alyssa Deckert, P.E., Civil Engineering Supervisor From: Mike Wegner, P.E. Copy to: Chuck Boehm, P.E. Jefferson-Summerset Storm Sewer Evaluation Findings Summary TM ii TO2_StormSewerEval_TM.docx Table of Contents List of Figures ........................................................................................................................................................... iii List of Tables ............................................................................................................................................................. iii Section 1: Background ............................................................................................................................................. 1 1.1 Purpose ............................................................................................................................................................... 1 1.2 Route Evaluation Overview ................................................................................................................................ 1 1.3 Existing Information Review .............................................................................................................................. 1 Section 2: Hydraulic Modeling Approach ................................................................................................................ 2 2.1 Model Updates ................................................................................................................................................... 2 2.2 Model Results .................................................................................................................................................... 2 2.3 H&H Modeling Conclusions ............................................................................................................................... 4 Section 3: Alternatives Analysis ............................................................................................................................... 5 3.1 Evaluation Considerations and Assumptions ................................................................................................... 5 3.2 Alternatives Analysis .......................................................................................................................................... 6 3.3 Cost Estimating .................................................................................................................................................. 7 3.4 Detailed Route Descriptions.............................................................................................................................. 7 3.4.1 Route A ............................................................................................................................................... 7 3.4.2 Route B & C ........................................................................................................................................ 8 3.4.3 Route B ............................................................................................................................................... 9 3.4.4 Route C ............................................................................................................................................... 9 3.4.5 Route D ............................................................................................................................................. 10 3.5 Conceptual Design Alternatives Summary ..................................................................................................... 10 Attachment A: Figures ........................................................................................................................................... A-1 Attachment B: Record Information ....................................................................................................................... B-1 Attachment C: Model Results ............................................................................................................................... C-1 Attachment D: Cost Estimates .............................................................................................................................. D-1 Jefferson-Summerset Storm Sewer Evaluation Findings Summary TM – DRAFT iii TO2_StormSewerEval_TM.docx List of Figures All figures found in Attachment A. Figure 1. Alternative Routes Overview Map Figure 2. Site Drainage Basins Map Figure 3. Revised Storm Sewer Routes Overiew Map Figure 4. Route A Overview Map Figure 5. Route A Jackson St Map Figure 6. Routes B & C Jackson St Map Figure 7. Route B Jackson St Map Figure 8. Route C Snell Rd Map Figure 9. Route D Overview Map List of Tables Table 1. Alternative Routes Conceptual Design Summary .................................................................................... 6 Jackson Street / Summerset Way Storm Sewer Evaluation 1 TO2_StormSewerEval_TM.docx Section 1: Background 1.1 Purpose The City of Oshkosh wishes to evaluate the feasibility of abandoning an existing 24-inch storm sewer located within private property between Jackson Street and Summerset Way. As part of a proposed development at 3870 Jackson Street, a 24-inch storm sewer was discovered during site survey. Subsequent investigation by the City revealed it flows east from the site between two single-family residential homes (3847 Summerset Way and 3835 Summerset Way). The investigation also revealed that the pipe was damaged by 5 fence posts which were installed and penetrated into the pipe. Figure 1 in Attachment A shows the existing storm sewer in question. The City of Oshkosh requested Brown and Caldwell (BC) to consider potential alternative routes to abandon the existing storm sewer. To understand the feasibility of the various alternatives, BC evaluated potential util- ity conflicts, built and updated hydrologic and hydraulic (H&H) stormwater models, and prepared cost esti- mates. The purpose of this technical memorandum is to summarize findings for the storm sewer analysis. This memo presents background information, an assessment of existing conditions, and an evaluation of alterna- tives for a storm sewer relocation. 1.2 Route Evaluation Overview The four (4) routes described below were evaluated in terms of feasibility. The routes were expected to ex- tend from the site to where it can connect to a sewer 30-inches or larger in diameter. The route evaluations were extended to conceptual design level and plan view figures for each route were prepared (included in Attachment A). A “do nothing” alternative was not evaluated. • Route A: North along Jackson Street to Sharratt Drive, East along Sharratt Drive to Summerview Drive, East along Summerview Drive to Prairie Court. • Route B: South along Jackson Street. • Route C: South along Jackson Street to Snell Road, East along Snell Road to Main Street. • Route D: Sewer would go east to Summerset Way between homes and then north along Summerset Way to intersection with Chateau Terrace. Note: “Route B & C” described in this TM is the upstream portion of Routes B and C that will run south along Jackson Street to Snell Road. This portion of the route is the same for both Routes B and C. Route B then extends further south from along Jackson Street from Snell Road. From the intersection Route C would ex- tend to the east along Snell Road. 1.3 Existing Information Review Record information was reviewed by the BC team to obtain a better understanding of the project area and its site constraints. The following items were reviewed within the project area. • Various GIS data layers provided by the City were the primary data source. Data layers included storm sewer, sanitary sewer, water main, parcels, trees, pavement ratings, and aerial photography. • As-Built Drawings (included in Attachment B). Jackson Street / Summerset Way Storm Sewer Evaluation 2 TO2_StormSewerEval_TM.docx o AT&T underground conduit drawings from 1930 and 1993. The drawings were obtained by the City of Oshkosh from AT&T and provided to BC. o City of Oshkosh water main drawings for the 12-inch water main on the east side of Jackson Street. • Construction drawings for the Advocap Daycare Facility were obtained from the City’s Evolve site plan review tracking system (included in Attachment B). Section 2: Hydraulic Modeling Approach Hydrologic and hydraulic (H&H) modeling was completed to understand the impacts of the various storm sewer routes. The existing conditions of the area around the project site and along the potential sewer routes was assessed by H&H modeling. The 24-inch storm sewer that is the subject of this evaluation drains east through the North Park Estates Neighborhood and discharges through a 36-inch storm sewer into an open channel within Winnebago County Community Park. Alternative Routes A and D would result in runoff continuing to drain to this outfall. Alternative Routes B and C would result in diverting the 24-inch storm sewer into the Fernau Watershed. Thus, the project considered modeling of two watersheds: 2.1 Model Updates The Fernau Watershed XPSWWMM model from the prior Fernau Watershed study completed by BC was ob- tained to serve as the starting point for this analysis. • North Park Estates Neighborhood Watershed: This area was currently not covered by an existing H&H model. BC expanded the Fernau Watershed XPSWMM model to include this area and to understand ex- isting conditions within the neighborhood. The model includes the area tributary to the 36-inch storm sewer discharging from the neighborhood into the Winnebago County Community Park located south- east of Prairie Court. All City storm sewer mains 18-inch and larger were included in the model (private storm sewer was not included). Drainage basins for this area were also delineated to support the modeling efforts for this area. Existing impervious area mapping and topography was used to delineated the drainage basins and develop perti- nent model inputs. The Advocap site survey data shown as part of the site plans for the development was used to assist in drainage basin delineations. Under existing conditions, the southern portion of the site does not have positive drainage. Runoff ponds on the southeastern corner behind a berm and it does not enter the storm sewer system. Additionally, there appears to be a low point and yard drain just east of the site along the existing storm sewer route. Runoff from the backyards of the homes that front Summerset Way drain towards this location. The drainage basins associated with the Advocap site area are shown in Figure 2 in Attachment A. • Fernau Watershed: Routes B and C would shift area into the Fernau Avenue Watershed. This area was previously modeled using XPSWMM. The existing conditions model for the Fernau Avenue Watershed was obtained and the pertinent area for this project was extracted from the model (the area upstream of the Main Street detention basin). Boundary modifications were made for subwatersheds located on the northwest corner of the Fernau watershed to include runoff from 3851 Jackson Street. These changes were updated in the revised existing conditions model. 2.2 Model Results The revised existing conditions model was executed for the 10-, 25-, and 100-year, 3-hour design storms. It should be noted that the 3-hour duration design storm was utilized because it is the critical duration for the Ferna Watershed. These results were used as the basis when comparing impacts of the potential storm Jackson Street / Summerset Way Storm Sewer Evaluation 3 TO2_StormSewerEval_TM.docx sewer routes. The existing conditions model results show that the storm sewer within the North Park Estates Neighborhood does not meet the City’s level of service (LOS) goals for stormwater management. In particu- lar, there is widespread street flooding observed during the 10-year storm event and in the 100-year event stormwater leaves the ROW in several locations. Each of the storm sewer routes were evaluated in the model. Pertinent information from the conceptual de- sign was inputted to represent the proposed sewers and the model for each route was executed for the 10-, 25-, and 100-year, 3-hour design storms. The analysis started by utilizing storm sewer layouts that repre- sented the minimum expected storm sewer improvements needed. This meant using a 24-inch storm sewer along the route shown on Figure 1 in Attachment A and connecting to the nearest storm sewer along that route which was larger than 24-inches (i.e. 30-inches). At the Advocap site, the locations where the drainage basins enter the storm sewer system were revised. Runoff from the site was assumed to directly enter the storm sewer. Under existing conditions, the southern portion of the site does not have positive drainage. Runoff ponds on the southeastern corner behind a berm and it does not enter the storm sewer system. It was assumed this area would be revised to have positive drainage and discharge directly into the storm sewer as well. Initial results showed that each route may impact downstream storm sewer systems using the starting lay- outs. The following observations were made. • Route A: This route changes the drainage pattern within the North Park Estates Neighborhood. This route would still discharge from the 36-inch outfall, however, under current conditions it flows east along Chateau Terrace. As part of Route A, it would shift north and flow through storm sewer in Summerview Drive. This shift in runoff direction results in decreased peak water surface elevations (WSEs) along Cha- teau Terrace, however, it increases peak WSEs along Summerview Drive and areas further north (Farm- stead Lane), which is an area that does not meet City LOS criteria. • Route B: As part of this route, drainage is diverted from the North Park Estates Neighborhood into the Fernau Watershed along Jackson Street. This resulted in increased flows and WSEs along Jackson Street. It does decrease WSEs in North Park Estates. At the intersection of Jackson Street and Snell Road, increased flooding was observed in the 25-year and 100-year storm events. • Route C: Drainage is also diverted into the Fernau Watershed, in this case, along Snell Road and Main Street. This again resulted in increased flows and WSEs within the Fernau Watershed along Snell Road and Main Street. The intersection of Jackson Street and Snell Road showed increased flooding in the 25- year and 100-year storm events. • It should be noted that in both Routes B and C, when runoff is diverted to the Fernau Watershed, an in- crease in peak WSE within the Main Street Pond was observed. Under the conditions considered, the peak WSE is below the spillway elevation. However, the critical storm duration for the pond varies from the storm sewer system in the watershed. Additional analysis would be needed to fully understand po- tential impacts within the Main Street Pond. • Route D: This route generally maintains the existing storm sewer route downstream of the site. However, the removal of the ponding on the southeast corner of the site impacts peak WSEs downstream. There were minor increases (0.2-feet or less) in ponding observed downstream. It should be noted, as part of the H&H modeling, any future changes at the Advocap site were disregarded. This included changes in impervious area, new on-site storm sewer, and any on-site stormwater control measures (SCMs). As a result of this initial analysis, revisions were considered. The routes were revised to develop a potential solution that could potentially meet LOS criteria along the route, and/or avoid negative impacts. These revi- sions are shown in Figure 3 in Attachment A, which provides an updated overview of the routes. The routes are then shown in greater detail in Figures 4 through 9 in Attachment A. Jackson Street / Summerset Way Storm Sewer Evaluation 4 TO2_StormSewerEval_TM.docx • Route A: Because of the impacts caused by the initial Route A set-up, revisions were made. The storm sewer size was increased in select locations to mitigate the increases in peak WSEs that were observed initially. To accomplish this the storm sewer size was increased at the outfall pipe (36-inch to 48-inch) and from the Summerview Dr / Prairie Court intersection to the outfall pipe (30-inch to 29-inch by 45- inch). These improvements extend the length of Route A above the initial concept. It should be noted that there are still areas within the neighborhood that do not meet the City’s LOS criteria. To fully meet LOS criteria additional improvements would be needed to storm sewers not along the relief sewer route. This could influence sizing of the outfall sewer. It is outside the scope of this study to fully evaluate storm sewer performance within the neighborhood. • Route B: Increased flooding was seen along Snell Road and Jackson Street during the 25-yr and 100-yr storm events. To mitigate this, the storm sewer along Jackson St south of Snell Road was increased from 24-inches to 30-inches. With the increased pipe size, flooding was reduced for the 10-yr and 25-yr events, but increased flooding was still seen for the 100-yr event around the intersection of Jackson Street and Snell Road. Based on these results, this route is believed to be not feasible, unless other im- provements are made. Additional evaluation is needed to determine feasibility. • Route C: As a result of increased flooding at the intersection of Jackson Street and Snell Road, the size of the relief sewer on Snell Road east of Jackson Street was increased to 30-inches. With the increased pipe size, the flooding at the Jackson Street and Snell Road intersection is reduced to less than is ob- served in the existing conditions model. However, increased flooding is observed at a low point in Main Street, approximately 375-feet south of Snell Road. Based on these results, it is believed that this route is not feasible, unless there were to be additional storm sewer improvements within Main Street and ad- ditional evaluation would be needed to determine feasibility. • Route D: To offset the minor increased in peak WSEs observed, the storm sewer at the outfall from North Park Estates was increased in size (36-inch to 48-inch). A single location with a WSE increase of approximately 0.1-feet was observed at the intersection of Summerset Way and Chateau Terrace, where the Route D sewer connects to existing sewer. Also, as with Route A, there would still be areas within the neighborhood that do not meet the City’s LOS criteria. Additional analysis would be needed to determine improvements needed to meet these criteria. The results from each of the revised alternatives (peak water surface elevation and flow rates) were com- pared to existing conditions results at selected locations. The peak water surface elevation results for select locations are summarized in Table 2-1 and the flow rates at select locations are summarized in Table 2-2 in Attachment C. 2.3 H&H Modeling Conclusions As a result of the H&H modeling the following observations were made regarding the impact of the potential storm sewer modifications. • Each of the alternatives had to be modified from the original concept in order to offset impacts of the changes. • Route D is closest to the original drainage pattern and the impacts from the original concept were the least. On-site stormwater management at the Advocap site could reduce the impacts, and potentially eliminate the need for the added improvements at the outfall from the North Park Estates Neighbor- hood. • Route A modifies the drainage pattern within the North Park Estates Neighborhood. Storm sewer im- provements were identified that would offset this change. • Route B and C would result in downstream impacts that are not easily addressed with revisions to the diversion route. These routes both direct runoff to a new watershed (Fernau Watershed) and result in Jackson Street / Summerset Way Storm Sewer Evaluation 5 TO2_StormSewerEval_TM.docx increased peak WSEs within Main Street Pond for the storm events considered. Thus, these routes are not considered feasible. Additional evaluation and improvements would be needed to develop a feasible alternative. Section 3: Alternatives Analysis 3.1 Evaluation Considerations and Assumptions The evaluation included the consideration of utility conflicts based upon mapping provided by the City of Oshkosh for sanitary sewer, water main, and private utilities. Also considered were potential tree impacts, permitting requirements, and easement acquisition requirements. Each route will require impacts to existing pavement; the pavement year and condition rating (based on City-provided records) was utilized. Other conceptual design considerations and assumptions for all routes are as follows: • Proposed Storm Sewer o The upstream invert elevation for the proposed storm sewer will match the existing storm sewer’s invert elevation at that location. o Existing storm sewer alignments will be utilized for the proposed storm sewer where feasible. o There will be a minimum cover depth of 18 inches above the proposed storm sewer. o New manhole structures will be installed at downstream tie-ins to the existing system (i.e., existing manholes will be replaced). • Existing Water Mains o The new storm sewer will maintain a minimum 8-ft horizontal separation from existing water distri- bution mains. o A water main bury depth of 6.5-ft was assumed. Where vertical conflicts would exist it was assumed the water main could be lowered to obtain adequate separation. • AT&T Conduits o There are existing AT&T conduit lines (duct bank) located on the east side of Jackson Street. Along the entire corridor there is one duct bank. There is also a second duct bank located south of the site (beginning near 3764 Jackson Street and extending south). The locations of the duct banks were approximated for this evaluation. o It was assumed the duct banks could not be relocated and that there would be a minimum vertical separation of 6 inches between the proposed storm sewer and the existing AT&T lines. • Pavement restoration for street would be as per the City’s 2025 Standard Specifications. The pavement rating (based on City provided records) was considered in determining restoration requirements. • Easements would be required for Route D. Other routes would be located within the existing right-of-way (ROW). • A Wisconsin Department of Transportation (WisDOT) permit will be required for work within the Jackson Street ROW. • The proposed Advocap development site will have on-site storm infrastructure installed to manage run- off and will tie-in to the new system. On-site storm sewer, or stormwater BMPs, were not included in the analysis. Note: Ultimately detailed survey, including utility locates, will need to be completed prior to a detailed design phase for any of the routes. The presence, and location, of some existing utilities (such as existing gas and Jackson Street / Summerset Way Storm Sewer Evaluation 6 TO2_StormSewerEval_TM.docx electrical utilities on Jackson Street) were estimated based on available record drawings. The detailed survey may necessitate changes to a route, and/or increase the cost associated with a route. 3.2 Alternatives Analysis Each of the routes were evaluated for site constraints based on the information available. All routes were deemed to be feasible. Further detail regarding the routes are provided in Section 3.4. Cost estimates (AACEi Class 4) for each route were prepared and additional information is provided in Section 3.3. The results of the route evaluation and cost estimating are summarized in Table 1 below. Table 1. Alternative Routes Conceptual Design Summary Design Item and Con- siderations Route A Route B Route C Route D General Location North through North Park Es- tates Neighborhood South along Jackson Street South on Jackson Street and east along Snell Road to Main Street East through new easement to Summerset Way Pipe Size and Material 24” RCP to 48” RCP 24” to 30” RCP 24” to 30” RCP 24” RCP to 48” RCP Total Pipe Length (LF) 2,300 1,705 2,365 1,270 Hydraulic Impacts Addressed with expanded route Impacts along Jackson St & Main St Pond in Fernau Wa- tershed Impacts along Main St & Main St Pond in Fernau Wa- tershed Minor impact at connection point Utility Impacts - Lowering water main (5 locations) - Lowering water laterals (9) - Crossing AT&T duct bank (2 locations) - Lowering water main (2 locations) - Crossing AT&T duct bank (2 locations) - Lowering water main (3 locations) - Crossing AT&T duct bank (2 locations) None Tree Impacts - Yes - 6 - Yes - 1 - Yes - 1 - Yes - 13 Permitting - WisDOT permit for work within Jackson St - WisDOT permit for work within Jackson St - WisDOT permit for work within Jackson St - None Permanent Easements - None - None - None - Yes - 2 (3761 and 3749 Summerset Way) Construction Cost (Refer to Attachment D for details) $1.64 million Cost Excluded (Route isn’t hydraulically feasible) Cost Excluded (Route isn’t hydraulically feasible) $0.52 million Other Notes - Would require work within backyard easements of 4-5 residential properties for North Park Estates outfall im- provements - Requires disturbance of Snell Road, which was re- cently reconstructed. - Requires construction be- tween multi-family residen- tial buildings, approx. 12-ft separation - Would require work within backyard easements of 4-5 residential properties for North Park Estates outfall im- provements Conflicts with Advocap site plan / sanitary sewer Jackson Street / Summerset Way Storm Sewer Evaluation 7 TO2_StormSewerEval_TM.docx 3.3 Cost Estimating Cost estimates were prepared for each of the four routes. The estimates were based on bid tabs from prior City of Oshkosh projects. It should be noted, that these are preliminary cost estimates based on available information. Additional information is needed for detailed design, and this may influence the cost. Detailed cost estimates are provided in Attachment D. Route D represents the lowest cost with Routes A, B, and C being substantially higher cost. This is largely related to the length of storm sewer and amount of pavement impacted for each alternative. As part of the cost estimates the following items should be noted. • Estimates were based on bid tabs from projects bid in 2025 within the City of Oshkosh. • The estimates are based on expected construction costs. Easements acquisition would be required for Route D. The cost for acquiring easements is not included. • Assumptions regarding pavement restoration were based on City pavement replacement details and street ratings. Based on the condition of the streets impacted, full panel concrete pavement restoration is assumed for any concrete streets. Jackson Street is currently an asphalt over concrete cross section. It was assumed the same type of pavement would be restored and replacement of a full driving lane would be required. 3.4 Detailed Route Descriptions Additional detail regarding proposed Routes A through D are described in the following subsections. While other alignments may be possible, we provided our best estimate as to which alignments would be most fea- sible due to the various site constraints. 3.4.1 Route A North along Jackson Street to Sharratt Drive, East along Sharratt Drive to Summerview Drive, East along Summerview Drive to Prairie Court (See Figures 3 to 5 in Attachment A) • This alternative assumes approximately 1,690 LF of 24” RCP, 445 LF of 29” x 45” horizontal elliptical RCP, and 170 LF of 48” RCP storm sewer and 14 manholes. The slope of the storm sewer will be ap- proximately 0.15% to 0.5% to match existing slopes or invert elevations where possible. • The proposed storm sewer alignment on Jackson Street is set to be a minimum of 8-ft west of the exist- ing 12” water main and west of the existing AT&T line to maintain adequate clearance and avoid poten- tial conflicts between utilities. The potential to place the storm sewer east of the water main and AT&T line was considered. However, there is not adequate room within the ROW to locate the storm sewer in this area. Additionally, there are other utility conflicts (overhead power poles, gas, hydrants) that would be encountered in this area and additional tree impacts. • The storm sewer on Sharratt Drive and Summerview Drive will be replaced in the same alignment as ex- isting. Existing storm catch basin inlets and sewer connections will be tied into new manhole structures. • Utility crossings o The proposed storm sewer will cross the existing AT&T line in two locations. It is expected that the storm sewer will be able to cross under the AT&T line. o The proposed storm sewer will cross the existing 12” water main on Jackson Street at the intersec- tion with Sharratt Drive (two locations). o The proposed storm sewer will cross the existing 8” water main on Summerview Drive at the inter- section with Sharratt Drive and at the intersection with Prairie Lane (two locations). Jackson Street / Summerset Way Storm Sewer Evaluation 8 TO2_StormSewerEval_TM.docx o The proposed storm sewer will cross the existing 6” water main on Summerview Drive at the inter- section with Prairie Lane (one location). o Water services (approximately 9) on Sharratt Drive, Summerview Drive, and Prairie Lane will also cross the proposed storm sewer. It was assumed that the water services will need lowered to allow for adequate clearance. o The storm sewer will cross over the 8” sanitary sewer in multiple locations (Sharratt Drive and Sum- merview Drive, Summerview Drive and Summerset Way, and Summerview Drive and Prairie Lane). Gravity sanitary sewer conflicts with the proposed storm sewer are not anticipated. Note: Sanitary sewer lateral locations on Summerview Drive are not mapped in GIS but are assumed to exist. It is expected that there would not be conflicts with these laterals. o The storm sewer will cross over the 6” sanitary force main that travels north on Prairie Lane from and existing lift station and then west on Summerview Drive before tying in to the gravity system at Summerset Way. However, limited information on the force main is known. For the purpose of this analysis, BC assumed that force main relocation will not be needed. This will need verified during detailed design. • Permanent easements are not expected to be needed. All work will be performed within existing state or city ROW or within existing utility easements. Work within approximately 4 or 5 existing utility easements is required for construction of new outlet sewer from North Park Estates neighborhood. This would im- pact side and/or rear yards of single family properties. • Impacts to one tree at the upstream tie-in location at 3870 Jackson Street is included in the cost esti- mate. It may be possible to avoid this impact. Other assumed tree impacts include within the City ROW at Prairie Court (one tree) and within the existing utility easement south of Prairie Court (six trees). 3.4.2 Route B & C South along Jackson Street to Snell Road (See Figures 3, 6, and 7 in Attachment A). This portion would be included in both Routes B and C. • This alternative assumes approximately 1,070 LF of 24” RCP storm sewer and 6 manholes. The slope of the storm sewer will be approximately 0.3% to match existing slopes or invert elevations where possible. • The proposed storm sewer alignment on Jackson Street is set a minimum of 8-ft west of the existing sanitary sewer and west of the existing water main and AT&T lines to maintain adequate clearance and avoid potential conflicts. • Utility crossings o The proposed storm sewer will cross the existing AT&T line in two locations (in front of 3870 Jackson Street and at the intersection of Jackson Street and Snell Road). o The proposed storm sewer will cross the existing 12” water line at the upstream tie-in location in front of 3870 Jackson Street. o The proposed storm sewer will cross an existing 8” sanitary sewer near 3792 Jackson Street. It is expected that there would not be any conflicts with this sewer. • Permanent easements are not expected to be needed. All work will be performed within existing state ROW. • Impacts to one tree at the upstream tie-in location at 3870 Jackson Street is included in the cost esti- mate. It may be possible to avoid this impact. • Locating the proposed storm sewer alignment east of the existing water main was reviewed, but elimi- nated from consideration. It would not be feasible to locate the sewer within the ROW, it would result in additional utility conflicts, and additional tree impacts. Jackson Street / Summerset Way Storm Sewer Evaluation 9 TO2_StormSewerEval_TM.docx 3.4.3 Route B South along Jackson Street (See Figures 3, 6, and 7 in Attachment A) • As a continuation along Jackson Street south of Snell Road from the area described as Route B & C above, this alternative assumes an additional approximately 630 LF of 30” RCP storm sewer and 2 man- holes. The slope of the storm sewer will be approximately 0.5% to match existing slopes or invert eleva- tions where possible. • The proposed storm sewer will follow the existing storm sewer alignment starting at the intersection of Jackson Street before connecting to the existing system. Existing storm catch basin inlets will be tied in to new manhole structures. • Utility crossings o The proposed storm sewer will cross an existing 12” water line at the southeast corner of the inter- section of Jackson Street and Snell Road. o The proposed storm sewer will cross an existing water service in front of 3650 Jackson Street. It is expected that there would not be any conflicts with this service. • Permanent easements are not expected to be needed. All work will be performed within existing state ROW. • No tree impacts are anticipated. 3.4.4 Route C South along Jackson Street to Snell Road, East along Snell Road to Main Street (See Figures 3, 6, and 8 in Attachment A) • As a continuation of Route B & C described above, this alternative assumes an additional approximately 710 LF of 24” RCP and 585 LF of 30” RCP storm sewer and 5 manholes. The proposed storm pipe would be installed at an approximate 0.3% slope between Jackson Street and Summerset Way and then increase to 0.5% slope before matching the existing storm sewer’s invert elevation. Existing storm catch basin inlets will be tied in to new manhole structures. Existing storm service laterals (approximately 11) will be tied in to the new storm sewer. • The proposed storm sewer will follow the current alignment from Jackson Street and Snell Road but with flow reversed from west to east compared to existing conditions. It will then extend east to connect to the existing system at Snell Road and Summerset Way and continue toward N Main Street. Existing storm catch basin inlets, service laterals, and sewer connections will be tied in to the proposed sewer or manhole structures. • Utility crossings o The proposed storm sewer will cross an existing 12” water main located east of the intersection of Jackson Street and Snell Road and an existing 6” water line in front of 45 Snell Road. o The proposed storm sewer will cross one water service in front of 101 Snell Road. It was assumed that this service would not be impacted. o The proposed storm sewer will cross an existing 12” sanitary sewer at Snell Road and N Main Street. It was assumed that the sewer would not be impacted. o The proposed storm sewer will cross existing sanitary sewer laterals (3). It was assumed that these laterals would not be impacted. • Permanent easements are not expected to be needed. All work will be performed within existing state ROW. • No tree impacts are anticipated. Jackson Street / Summerset Way Storm Sewer Evaluation 10 TO2_StormSewerEval_TM.docx 3.4.5 Route D Sewer would go east to Summerset Way between homes and then north along Summerset Way to intersec- tion with Chateau Terrace. The downstream sewer discharging from the North Park Estates Neighborhood, south of Prairie Lane will also be replaced. (See Figures 3 and 9 in Attachment A) • This alternative assumes approximately 1,100 LF of 24” and 170 LF of 48” RCP storm sewer and 6 manholes. The slope of the storm sewer will be approximately 0.16% to 0.33% to match existing slopes or invert elevations where possible. • The proposed storm sewer will run directly between two existing buildings located at 3761 and 3749 Summerset Way. There is approximately 12-ft of available space between the two buildings. Additional evaluation is needed to verify construction feasibility and protection of buildings. • The proposed storm sewer will follow the existing storm sewer alignment along Summerset Way before connecting to the existing system at the intersection with Chateau Terrace. • Utility crossings o Approximately 4 existing water services cross the proposed storm sewer. It was assumed that these services would not be impacted. • Permanent easements (2) and increased community disturbance are anticipated. • Work would also occur within approximately 4 or 5 existing utility easements for construction of new out- let sewer from North Park Estates neighborhood. This would impact side and/or rear yards of single fam- ily properties. • Pavement restoration will include new curb and gutter on Summerset Way. Sidewalk and residential driveway replacement will also be required. • Approximately 13 existing trees may be impacted, including those located on Jackson Street (4), be- tween the two Summerset Way buildings (3), on Summerset Way at Chateau Terrace (1), and at the downstream storm sewer outlet south of Prairie Lane (5). 3.5 Conceptual Design Alternatives Summary Each of the alternative routes was deemed to be feasible. However, challenges are presented by each alter- native. The following observations provides a summary of the analysis. • Route D presents the shortest route. This route is also most similar to the existing stormwater flow path. However, it requires construction between buildings. Easements would be needed and construction be- tween buildings would need to be further evaluated. • Route A would divert runoff to the north through a different branch of storm sewer in the North Park Es- tates Neighborhood. Additional storm sewer improvements are needed to offset the impact of diverting the storm sewer. • Route A and D include enlarging outfall sewer from North Park Estates neighborhood, which would result in construction within 4 or 5 side and/or back-yards. • Route B and C divert runoff into the adjacent Fernau Watershed. Hydraulic impacts in the Fernau Water- shed are observed that cannot be resolved within the limits of the current routes. Additional analysis and improvements would be required. • Routes A, B, and C require crossing the AT&T duct bank. Based on available information it is expected these crossings can be accomplished, however, they represent a risk and additional information would be needed to verify location and depth of the AT&T lines. • The relative cost of alternatives is largely based on length of storm sewer required and amount of pave- ment impacted. Thus, Route D is expected to have the lowest cost. Jackson Street / Summerset Way Storm Sewer Evaluation A-1 TO2_StormSewerEval_TM.docx Attachment A: Figures Jackson Street / Summerset Way Storm Sewer Evaluation B-1 TO2_StormSewerEval_TM.docx Attachment B: Record Information REMOVE SIGN POSTS REMOVE LIGHT POLE REMOVE LIGHT POLE REMOVE STORM PIPE TO EXTENTS APPROX. EX. 24" STORM PIPE, PROTECT. FIELD VERIFY PRIOR TO CONSTRUCTION. SAWCUT AND REMOVE ASPHALT AND BASE REMOVE STORM STRUCTURE SHEET NUMBER PROJECT INFORMATION PROFESSIONAL SEAL JOB NUMBER 250071800 PR O P O S E D D A Y C A R E F A C I L I T Y F O R : AD V O C A P 38 2 0 J A C K S O N S T R E E T ● O S H K O S H , W I 5 4 9 0 1 SHEET DATES ISSUED FOR CONSTRUCTION C1.0 CIVIL EXISTING SITE AND DEMOLITION PLAN IFC JUNE 19, 2025 REMOVE PAVEMENT & BASE REMOVE FEATURES LEGEND: 30'0 30'60' SCALE: 1"= 30' NORTH GENERAL NOTE: CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES AND PROVIDE INFORMATION TO DESIGN ENGINEER PRIOR TO CONSTRUCTION. DOWNSTREAM UTILITY CONNECTIONS MUST BE VERIFIED PRIOR TO CONSTRUCTION AND PROVIDED TO ENGINEER. 1.CUT "X" SET ON CONCRETE WEST OF BUILDING AT SOUTHEAST CORNER OF PARCEL. ELEV.=782.14 (NAVD 88) BENCHMARK: Jackson Street / Summerset Way Storm Sewer Evaluation C-1 TO2_StormSewerEval_TM.docx Attachment C: Model Results 10-year Storm 25-year Storm 100-year Storm 10-year Storm 25-year Storm 100-year Storm 10-year Storm 25-year Storm 100-year Storm 10-year Storm 25-year Storm 100-year Storm 10-year Storm 25-year Storm 100-year Storm Flood Depth Flood Depth Flood Depth Flood Depth Flood Depth Flood Depth Flood Depth Flood Depth Flood Depth Flood Depth Flood Depth Flood Depth Flood Depth Flood Depth Flood Depth (feet)(feet)(feet)(feet)(feet)(feet)(feet)(feet)(feet)(feet)(feet)(feet)(feet)(feet)(feet)(feet) 15-1342 Sharratt Dr - Route A connection point 783.74 -1.7 -1.6 -1.6 -3.2 -2.2 -1.9 -1.7 -1.6 -1.6 -1.7 -1.6 -1.6 -1.7 -1.6 -1.6 15-1346 Intersection of Summerview Dr and Prairie Ct 778.63 -2.5 -1.8 -1.3 -3.4 -2.5 -1.8 -2.6 -1.9 -1.3 -2.6 -1.9 -1.3 -3.2 -2.3 -1.7 15-1384 Summerview Dr - Inbetween intersections with Prairie Ln 775.62 1.2 1.8 2.3 0.5 1.4 2.1 1.0 1.8 2.3 1.0 1.8 2.3 0.8 1.5 2.2 15-1323 Intersection of Summerset Way & Chateau Terrace 778.96 0.2 0.2 0.3 -0.2 0.1 0.2 -0.2 0.1 0.2 -0.2 0.1 0.2 0.3 0.3 0.4 15-1586 Cul-de-sac on Chateay Terrace 773.66 2.0 2.5 2.9 1.0 1.8 2.6 1.4 2.3 2.8 1.4 2.3 2.8 1.4 2.2 2.7 15-2031 Intersection of Farmstead Ln & Summerview Dr (North)776.59 1.1 1.2 1.4 1.0 1.2 1.3 1.1 1.2 1.4 1.1 1.2 1.4 1.0 1.2 1.4 15-2067 Backyard inlet southwest of Greenbriar Ct 782.23 1.4 1.5 1.7 1.4 1.5 1.7 1.4 1.5 1.7 1.4 1.5 1.7 1.4 1.5 1.7 Priv_4 Undeveloped space south of 3870 Jackson St 780.89 0.6 0.7 0.9 0.0 0.0 0.5 0.0 0.0 0.8 0.0 0.0 0.1 -5.1 -5.1 -5.1 15-1862 Intersection of Jackson St & Snell Rd 781.76 -5.1 -2.5 -1.4 -5.1 -2.5 -1.4 -3.9 -2.1 -1.3 -6.0 -3.1 -1.3 -5.1 -2.5 -1.4 15-1867 Jackson St - Route B connection point 777.97 -3.8 -2.7 -1.7 -3.8 -2.7 -1.7 -2.3 -1.3 -0.5 -4.1 -2.8 -1.6 -3.8 -2.7 -1.7 15-1876 Intersection of Jackson St and Logan Dr (North)772.71 -1.2 -0.4 0.3 -1.2 -0.4 0.3 -0.8 -0.1 0.3 -1.4 -0.5 0.3 -1.2 -0.4 0.3 15-1888 Intersection of Jackson St and Logan Dr (South)766.79 -2.0 -1.7 -1.3 -2.0 -1.7 -1.3 -1.9 -1.6 -1.3 -2.0 -1.7 -1.3 -2.0 -1.7 -1.3 15-1889 Jackson St - At storm sewer bend to Main St Pond 766.17 -5.1 -5.0 -4.3 -5.1 -5.0 -4.3 -5.1 -5.0 -4.1 -5.1 -5.0 -4.0 -5.1 -5.0 -4.3 15-2476 Intersection of Snell Rd & Main St 776.72 -8.2 -8.0 -6.8 -8.2 -8.0 -6.8 -8.2 -8.0 -6.8 -7.8 -7.5 -3.9 -8.2 -8.0 -6.8 15-1104 Main St - South of Snell Rd 771.31 -5.8 -5.5 -4.0 -5.8 -5.5 -4.0 -5.8 -5.5 -4.0 -5.6 -5.2 -2.3 -5.8 -5.5 -4.0 15-1098 Main St - South of Snell Rd @ inlet to Main St Pond 764.12 -4.6 -4.0 -2.6 -4.6 -4.0 -2.6 -4.6 -3.9 -2.5 -4.5 -3.8 -2.2 -4.6 -4.0 -2.6 15-1861 Snell Rd - East of Jackson St 780.3 -3.1 -1.0 0.1 -3.1 -1.0 0.1 -2.4 -0.6 0.1 -5.8 -5.5 -1.2 -3.1 -1.0 0.1 12-1526 Snell Rd - West of Jackson St 781.36 -4.0 -1.2 0.1 -4.0 -1.2 0.1 -2.8 -0.7 0.3 -4.9 -1.6 -0.2 -4.0 -1.2 0.1 15-1105 Main St - South of Snell Rd 770.65 -3.8 -3.5 -1.3 -3.8 -3.5 -1.3 -3.8 -3.5 -1.3 -3.5 -2.9 0.4 -3.8 -3.5 -1.3 MainPnd Main St Pond (NWL = 756, Spillway = 763)763 -3.8 -2.9 -1.5 -3.8 -2.9 -1.5 -3.6 -2.7 -1.3 -3.6 -2.7 -1.1 -3.8 -2.9 -1.5 XX XX Red shading & text = increase in peak WSE above ground. Orange shading & text = increase in peak WSE below ground. Table 2-1: Comparison of Peak WSE's between Existing Conditions and Alternative Routes Route DExisting Conditions XPSWMM Node Rim Elevation Route A Route B Route C Location 10-yr 25-yr 100-yr 10-yr 25-yr 100-yr 10-yr 25-yr 100-yr 10-yr 25-yr 100-yr 10-yr 25-yr 100-yr Peak Flow Peak Flow Peak Flow Peak Flow Peak Flow Peak Flow Peak Flow Peak Flow Peak Flow Peak Flow Peak Flow Peak Flow Peak Flow Peak Flow Peak Flow cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs NP_Outfall Outfall into Winnebago County Community Park 56.1 60.3 65.5 66.9 79.4 90.5 53.3 59.4 65.1 53.3 59.4 65.1 61.3 70.5 80.3 Link473 Existing 24" storm sewer between houses 10.5 12.6 16.5 2.3 3.2 6.8 2.4 3.2 5.8 2.4 3.2 5.1 2.3 3.2 5.1 Varies Proposed 24" storm sewer leaving site NA NA NA 7.3 8.5 10.5 10.3 12.4 15.6 10.4 13.9 17.1 9.8 11.6 12.1 P_15-1862 Jackson St - South of Snell 12.2 15.2 16.9 12.2 15.2 16.9 20.9 24.9 26.5 10.6 13.9 15.4 12.2 15.2 16.9 P_15-1867 Jackson St - South of potential conneciton point 15.1 19.3 22.4 15.1 19.3 22.4 24.3 29.3 32 13.8 18.5 23.2 15.1 19.3 22.4 Link477 - Route A Sharratt Dr - East of Jackson NA NA NA 10.7 11.3 11.2 NA NA NA NA NA NA NA NA NA Link477 - Route B/C Snell Rd - East of Jackson NA NA NA NA NA NA 16.5 19.9 21.3 9.6 12.6 15.8 NA NA NA N_15-2476 Main St - South of Snell 14.6 19.3 28.4 14.6 19.3 28.4 14.6 19.3 28.4 24.3 31.9 44.6 14.6 19.3 28.4 Table 2-2: Peak Flows from Existing Conditions and Alternative Routes Alt C Alt D Link Location Existing Alt A Alt B Jackson Street / Summerset Way Storm Sewer Evaluation D-1 TO2_StormSewerEval_TM.docx Attachment D: Cost Estimates Est. Qty Total Cost Est. Qty Total Cost Est. Qty Total Cost Est. Qty Total Cost 1011 Clearing ID 40$ 72 2,880$ 12 480$ 12 480$ 156 6,240$ 1021 Grubbing ID 25$ 72 1,800$ 12 300$ 12 300$ 156 3,900$ 1050 Mobilization LS 10% 1 114,727$ 1 119,347$ 1 140,038$ 1 36,844$ 1308 7" Concrete Pavement Removal and Replacement (Summerview Subdivision) SY 85$ 2562 217,770$ 0 -$ 0 -$ 433 36,805$ 1318 8" Concrete Pavement Removal and Replacement (Snell Road) SY 95$ 0 -$ 0 -$ 2137 203,015$ 0 -$ 1340 Asphalt over Concrete Pavement Removal and Replacement (Jackson St) SY 135$ 1104 149,040$ 2500 337,500$ 1588 214,380$ 0 -$ 1370 Turf Restoration SY 9$ 429 3,861$ 0 -$ 0 -$ 1336 12,024$ 1510 6" Concrete Sidewalk/Driveway/Ramp with 3" CABC and Grading SF 13$ 47 588$ 0 -$ 0 -$ 847 10,588$ 1600 Furnish and Install Tree EA 650$ 6 3,900$ 1 650$ 1 650$ 4 2,600$ 2015 Furnish and Install 24" Storm Sewer LF 150$ 1685 252,750$ 1070 160,500$ 1774 266,100$ 1100 165,000$ 2021 Furnish and Install 30" Storm Sewer LF 225$ 0 -$ 633 142,425$ 590 132,750$ 0 -$ 2030 Furnish and Install 48" Storm Sewer LF 350$ 168 58,800$ 0 -$ 0 -$ 168 58,800$ 2051 Furnish and Install 29" x 45" HERCP Class III Storm Sewer LF 325$ 445 144,625$ 0 -$ 0 -$ 0 -$ 2149 Furnish and Install 48" RCP Class III Apron Endwall with Joint Ties EA 3,500$ 1 3,500$ 0 -$ 0 -$ 1 3,500$ 2201 Furnish and Install Standard Storm Sewer Manhole (4' diameter) VF 800$ 40 32,000$ 48 38,400$ 32 25,600$ 5 4,000$ 2202 Furnish and Install Standard Storm Sewer Manhole (5' diameter) VF 1,100$ 42 46,200$ 35 38,500$ 59 64,900$ 14 15,400$ 2205 Furnish and Install Standard Storm Sewer Manhole (8' diameter) VF 1,800$ 16 28,800$ 0 -$ 0 -$ 8 14,400$ 2214 Furnish and Install Standard Storm Sewer Inlet Manhole (5' diameter) VF 1,200$ 16 19,200$ 0 -$ 0 -$ 9 10,800$ 2804 Remove 30" and Smaller Storm Sewer LF 35$ 1473 51,555$ 633 22,155$ 1035 36,225$ 268 9,380$ 2806 Remove 33" - 60" Storm Sewer LF 50$ 168 8,400$ 0 -$ 0 -$ 168 8,400$ 2850 Connect to Existing Storm Sewer Main EA 1,650$ 12 19,800$ 8 13,200$ 13 21,450$ 4 6,600$ 2852 Connect to Existing Storm Sewer Lateral EA 225$ 0 -$ 0 -$ 11 2,475$ 0 -$ 2856 Connect to Existing Manhole EA 750$ 0 -$ 0 -$ 0 -$ 0 -$ 4002 Furnish and Install 6" Ductile Iron Water Main Relay with Polywrap LF 140$ 20 2,800$ 0 -$ 20 2,800$ 0 -$ 4004 Furnish and Install 8" Ductile Iron Water Main Relay with Polywrap LF 175$ 40 7,000$ 0 -$ 0 -$ 0 -$ 4008 Furnish and Install 12" Ductile Iron Water Main Relay with Polywrap LF 220$ 60 13,200$ 40 8,800$ 20 4,400$ 0 -$ 4036 Furnish and Install 1" Water Service (Relay) LF 105$ 180 18,900$ 0 -$ 0 -$ 0 -$ 4058 Furnish and Install Connections to Existing 6" Water Main EA 2,500$ 2 5,000$ 0 -$ 2 5,000$ 0 -$ 4060 Furnish and Install Connections to Existing 8" Water Main EA 3,000$ 4 12,000$ 0 -$ 0 -$ 0 -$ 4064 Furnish and Install Connections to Existing 12" Water Main EA 4,000$ 6 24,000$ 4 16,000$ 2 8,000$ 0 -$ 4236 Furnish and Install 6" 45 degree Water Main Bend EA 425$ 4 1,700$ 0 -$ 4 1,700$ 0 -$ 4237 Furnish and Install 8" 45 degree Water Main Bend EA 500$ 8 4,000$ 0 -$ 0 -$ 0 -$ 4239 Furnish and Install 12" 45 degree Water Main Bend EA 1,100$ 12 13,200$ 8 8,800$ 4 4,400$ 0 -$ 1,260,000$ 907,000$ 1,135,000$ 400,000$ 30%378,000$ 273,000$ 341,000$ 120,000$ 1,638,000$ 1,180,000$ 1,476,000$ 520,000$ 1 Routes B and C are not considered feasible due to hydraulic impacts to Fernau Watershed. Additional evaluation, and improvements would be required. This evaluation and improvements would result in additional project costs. Cost displayed on this table represents costs for improvements shown on figures within this memo. City of Oshkosh, WI Jackson Street / Summerset Way Storm Sewer Analysis Table D-1: Detailed Cost Estimates Construction Total Bid Item Jackson Street to Summerview Way Jackson Street Easement to Summerset Way Construction Sub-Total Contingency Description Units Unit Cost Route A Route B1 Route DRoute C1 Jackson Street to Snell Road https://us-partner-integrations.egnyte.com/msoffice/wopi/files/47175139-54ba-4867-a87e-2e4ce6cecc06/WOPIServiceId_TP_EGNYTE_PLUS/WOPIUserId_-/ Alternatives Cost Estimating.xlsx 10/31/2025 D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Workshop - League of Wisconsin Municipalities Mutual Insurance services, November 25, 2025 (5:15pm, Room 404) D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Appointment to fill Council vacancy, November 25, 2025 (during regular meeting at 6pm) B a c k g r o u n dBackground Th e O sh k osh Com m on Cou n cil is acceptin g application s from city residen ts to fill a v acan cy of an at-large cou n cil seat. Th e term of th e appoin ted Com m on Cou n cil m em ber w ou ld ru n th rou gh April 2 0 2 6 . Th e process is ou tlin ed below, an d th e sam e in form ation can be fou n d on ou r website at osh k osh w i.g ov /citycou n cil/cou n cil_v acan cy.aspx. In terested citizen s m u st su bm it a letter of in terest, resu m e an d Cou n cil Can didate Q u estion n aire to th e City Clerk n o later th an 4 :3 0 PM on Wedn esday, Nov em ber 1 2 R equ irem en ts: 1 8 years of age U.S. Citizen R esiden t of th e city Q u alified to reg ister to v ote Fin d all m in im u m qu alification s on th e Wiscon sin Election s Com m ission 's website Com pleted application s m ay be em ailed, sen t v ia th e U.S. Postal Serv ice, or h an d deliv ered to th e O ffice of th e City Clerk at City Hall (2 1 5 Ch u rch Av e.) Em ail: city_clerk @osh k osh wi.gov O ffice of th e City Clerk City of O sh k osh P.O . Box 1 1 3 0 O sh k osh , WI 5 4 9 0 3 -1 1 3 0 Applican t in form ation w ill be forwarded to City Cou n cil m em bers an d w ill be m ade av ailable to th e pu blic in th e office of th e City Clerk an d on lin e (a lin k to su bm itted application s can be fou n d on th e Cou n cil v acan cy page) Applican ts will m ak e brief presen tation s at th e Com m on Cou n cil m eetin g on Tu esday, Nov em ber 2 5 at 6 PM Th ere will th en be an opportu n ity for pu blic com m en ts, Com m on Cou n cil discu ssion , an d fin ally, Cou n cil will v ote an d m ak e an appoin tm en t th at n ig h t. D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Workshop - Menominee Park train, January 13, 2026 (5pm) D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :City of Oshkosh 2025-2026 Strategic Plan - 3Q 2025 updates B a c k g r o u n dBackground At th e Ju n e 2 5 , 2 0 2 4 m eetin g , Cou n cil approv ed th e City of O sh k osh 2 0 2 5 -2 0 2 6 Strateg ic Plan . An in teractiv e dash board is av ailable for th is plan an d can be fou n d on ou r City's Strateg ic Plan web pag e, an d a PDF of th e th ird qu arter plan u pdates is attach ed to th is item . Please reach ou t to th e City Man ager or th e respon sible City departm en t staff if you h av e an y qu estion s. Updates w ill be prov ided approxim ately qu arterly v ia th e dash board. A t t a c h m e n t sAttachments 2025 3Q Strategic Plan Progress Report Overall Plan Progress Report 2025-2026 City of Oshkosh Strategic Plan Report Created On: Nov 07, 2025 3Q 2025 Update Page 1 6 Goal 25 Objective 92 Strategy Report Legend Priority No Update Overdue Overall Summary % Status Pending 4 On Track 80 Some Disruption 4 Upcoming 1 Discontinued 1 Completed 9 Status 0 100 # Progress 9% Page 2 ENHANCE OUR QUALITY OF LIFE SERVICES AND ASSETS Library Museum Parks Department Future State: Natural, cultural, and recreational assets of the City are recognized as a source of pride for the community. Owner: Kami Zuercher %# Status Pending 36 4 On Track 64 7 Provide Improved Park and Senior Center Facilities Owner: Ray Maurer %# On Track 100 3 Implement projects approved for this timeframe from the Comprehensive Outdoor Recreation Plan (CORP) Owner: Ray Maurer Update provided by Tyler Klaver on Sep 30, 2025 05:00:01 Following are projects to be completed as indicated in the Comprehensive Outdoor Recreation Plan (CORP) in addition to the projects included in the 2025 Capital Improvement Plan (CIP): New City Park Identification Signs - Conceptual designs and cost estimates have been collected. Will present to Advisory Parks Board at an upcoming meeting. Park Benches - All benches have been ordered and installed. Construct Accessible Walkways - Walkways as part of the 44th Parallel Park Tennis Court Project will be constructed by the end of October. Rainbow Memorial Park walkways have been completed. Reconstruction of the New York Avenue Fishing Pier - Project complete. Lakeshore Park Westside Trail/Parking Lot - Finalizing kiosk design, materials needed for project, and map design with consultant. Goal 1 Progress 0% Objective: 4 Strategy: 11 Objective 1.1 Progress 0% Strategy: 3 Strategy 1.1.1 Jan 01, 2025 - Ongoing On Track Page 3 Provide Broadly Appealing Museum Programs and Exhibitions Owner: Anna Cannizzo %# On Track 100 4 Implement Parks and Senior Center Capital Improvement Program (CIP) projects approved for this timeframe Owner: Ray Maurer Update provided by Tyler Klaver on Sep 30, 2025 05:00:01 Following are the approved projects included in the 2025 Parks Department Capital Improvement Plan (CIP): Park Trails Improvements - Anticipated Trail improvements for Rusch Park to be deferred and completed by spring 2026. Menominee Park Zoo paths have been improved. Pickart Park Development - As part of Phase 1 development, installation of play equipment is currently underway and will be completed by November 1st. 44th Parallel Park Tennis Court Resurfacing - Project is complete, which included the addition of two pickleball courts. Stevens Park Playground Equipment & Surfacing - Project complete. Stevens Park Tennis & Basketball Courts - Project complete. Leach Amphitheater LED Sign - The Common Council decided to not move forward with the project. Menominee Park LED Sign - The Common Council decided to not move forward with the project. South Park LED Sign - The Common Council decided to not move forward with the project. Rusch Park Trail Lighting - Anticipate award by Common Council in October to purchase the light poles. Installation is anticipated to be completed spring 2026. Rainbow Memorial Park Playground Equipment & Surfacing - Project complete. Riverwalk Light Bollards Replacement - Working with city Electric Division staff to review quotes for product. Following are the approved projects included in the 2025 Seniors Center Capital Improvement Plan (CIP): Heating, Ventilation, and Air Conditioning (HVAC)/Roofing Replacement - Project complete. South Building Flooring Improvements - Project complete. South Building Wall Systems - Project complete. Explore expanding operational hours for the Senior Center Owner: Ray Maurer Update provided by Tyler Klaver on Sep 30, 2025 05:00:01 The Seniors Center is completing the onboarding of two new Personal Trainers. These positions are structured and intended to have the flexibility to have working hours outside of our current window of operating hours. A limited number of test sessions and times have been completed recently and more times will be tested through the end of 2025 with an eye to having formal offerings beginning in 2026. Additionally, there have been test classes of craft programming in evening hours through October. These have been successful and there will be further tests of this type going forward into 2026. Strategy 1.1.2 Jan 01, 2025 - Ongoing On Track Strategy 1.1.3 Jan 01, 2025 - Ongoing On Track Objective 1.2 Progress 0% Strategy: 4 Page 4 Preserve the Public Library as a Source of Pride for the Residents of Oshkosh Owner: Lisa Voss %# Status Pending 100 1 Enhance representation of and appeal to local and regional community through education and public programming Owner: Anna Cannizzo Update provided by Anna Cannizzo on Sep 30, 2025 05:00:02 This is an ongoing activity. The Museum continues to offer diverse programming that caters to various age groups and that celebrate the regionʼs history, art, and culture. Planning for the Museumʼs 4th annual Dia de los Muertos celebration is underway and is scheduled to take place in early Q4. For the 2025 event, staff has developed numerous collaborative community partnerships to develop and implement event programming including: UW-Oshkoshʼs Department of Global Languages and Cultures Chicana/o & Latinx Program, OASDʼs Vel Phillips Spanish program, and the Oshkosh Public Library. OPM also secured support for the event from various partnerships like the Oshkosh Area Community Foundation, The Taqueria (sponsored free admission for the event), and Fox Communities Credit Union. Evaluate, address, and adjust public offerings for families and adults to better serve the community Owner: Anna Cannizzo Update provided by Anna Cannizzo on Sep 30, 2025 05:00:01 This is an ongoing activity. For the past two years, OPM staff has gathered audience feedback on all field trips and programs. This practice has become an essential part of daily operations. Teacher evaluations of OPMʼs Field Trip programs have improved communication with instructors and provided insights into effectively engaging with students in Oshkosh and neighboring areas. OPM began the initial planning for the second Wisconsin Arts Board Grant funded “Bridging Past and Present: Exploring Native American Cultural Heritage” program series that will take place 2026. Develop “Art in Public Spaces” program Owner: Anna Cannizzo Update provided by Anna Cannizzo on Sep 30, 2025 05:00:01 This is an ongoing activity. In Q3, staff developed and held a second workshop to review and collect feedback for the first draft of the Public Art and Cultural Heritage Policy. This is the next step in developing a Public Art Program. Staff is currently working on a second draft that incorporated MAC Board feedback to send to associated City departments for their review and feedback before firming up a final draft of the policy narrative. Staff will create needed forms following the completion of the final draft narrative. Promote permanent and some consolidated collections storage Owner: Anna Cannizzo Update provided by Anna Cannizzo on Sep 30, 2025 05:00:01 This is an ongoing activity. During Q3, the Museumʼs Collection Review Committee continued to evaluate and cull outdated and obsolete resources stored in the Museumʼs research library and deaccession 3-D collections that do not advance the Museumʼs mission in accordance with the Museumʼs Collections Management Policy to create more efficient use of current storage spaces. Update Library Department plan and align with the Cityʼs strategic plan Owner: Lisa Voss Strategy 1.2.1 Jan 01, 2025 - Ongoing On Track Strategy 1.2.2 Jan 01, 2025 - Ongoing On Track Strategy 1.2.3 Jan 01, 2025 - Ongoing On Track Strategy 1.2.4 Jan 01, 2025 - Ongoing On Track Objective 1.3 Progress 0% Strategy: 1 Strategy 1.3.1 Jan 01, 2025 - Ongoing Status Pending Page 5 Establish Quality-of-Life Fund Development Activities Owner: Ray Maurer %# Status Pending 100 3 Create a working group to explore options related to giving, partnership, and alternative funding sources for quality-of-life projects and initiatives Owner: Ray Maurer Explore the possibility of a tiered recognition program for volunteers Owner: Ray Maurer Develop a City-wide sponsorship policy Owner: Ray Maurer Objective 1.4 Progress 0% Strategy: 3 Strategy 1.4.1 Jan 01, 2025 - Ongoing Status Pending Strategy 1.4.2 Jan 01, 2025 - Ongoing Status Pending Strategy 1.4.3 Jan 01, 2025 - Ongoing Status Pending Page 6 IMPROVE AND MAINTAIN OUR INFRASTRUCTURE Administrative Services Department Public Works Department Transportation Department Future State: Safe and effective infrastructure that provides a framework for full-scale community enjoyment. Owner: Kami Zuercher %# On Track 77 10 Some Disruption 8 1 Completed 15 2 Improve our Streets, Transit, Bicycle, and Pedestrian Facilities Owner: Jim Collins %# On Track 33 1 Some Disruption 33 1 Completed 33 1 Update provided by Jim Collins on Mar 31, 2025 14:40:05 Grant funding was awarded for a bike/ped bridge over Hwy. 41 however; it is "paused" by the feds. A new fare collection system called WisGO powered by WisGO was implemented in 2024. The system includes fare capping. Facilitate route and system changes to the 2024 Transit Development Plan (TDP) to increase fixed route accessibility by 2026 Owner: Jim Collins Update provided by Jim Collins on Jun 30, 2025 13:55:47 Route and system changes were completed and are going well Implement recommendations of current Pedestrian and Bicycle Circulations Plan in order to increase linear footage of bike & pedestrian trails and incorporate “Complete Streets” principles, when and where feasible Owner: Jim Collins Update provided by Jim Collins on Sep 30, 2025 13:34:48 Planning staff has edited and resubmitted the grant paperwork to meet the new federal govt. format. Awaiting word to continue working on the bike and ped. bridge. Bike and pedestrian accommodations are planned with the Jackson Street bridge project in 2028 Complete addition to the downtown transit center with restrooms, climate-controlled waiting area, and second platform Owner: Jim Collins Update provided by Jim Collins on Sep 30, 2025 13:36:12 Project bid was awarded. Contractor is beginning mobilization. Project will be ongoing throughout the end of 2025 and into 2026 Goal 2 Progress 15% Objective: 3 Strategy: 13 Objective 2.1 Progress 33% Strategy: 3 Strategy 2.1.1 Jan 01, 2025 - Ongoing Completed Strategy 2.1.2 Jan 01, 2025 - Ongoing Some Disruption Strategy 2.1.3 Jan 01, 2025 - Ongoing On Track Page 7 Improve Our City Facilities Owner: Jon Urben %# On Track 80 4 Completed 20 1 Implement recommendations of facility plan, including building security and ADA assessment & recommendations Owner: Jon Urben Update provided by Jon Urben on Jun 30, 2025 05:00:01 ADA General Services coordinated meetings with building managers to address the public access ADA Transition Plan and identified deficiencies within our Parks and Public Buildings. This includes General Services Buildings, Public Library, Public Museum and Transit. As a result, the completed, in-progress (anticipated completion in the next quarter) or Planned in Future Funding Projects (e.g. CIP projects) for all projects in the ADA Transition Plan divided into the total project list of 377 is as follows: 1. Completed 178 (47%) 2. In-Progress 19 (5%) 3. Planned in Future Funding Projects 180 (48%) The full breakdown of departmental metrics for these projects can be found on the City website under ADA Transition Plan Progress. Security The Council allocated $150K in the 2022 CIP for City Hall Security Improvements. This project includes office renovations, door security and other technology updates. Renovations began in January 2023. As of 1st quarter 2023 security improvements have been completed to include new counters, glass, card readers, security cameras, strobes, doors and office modifications. This project will also include enhanced security training protocol for employees. Facilities Maintenance CIP Projects Facilities Maintenance has provided a dashboard that highlights Capital Improvement Plan (CIP) and other facility improvement projects coordinated by Facilities Maintenance within the General Services Division of the Administrative Services Department. The General Services Division is directly responsible for CIP and facility improvement projects within the following facilities: City Hall, Convention Center, Fire Stations 15-19, Grand Opera House, Public Library, Public Museum, Field Operations Center, Seniors Center North and South, as well as Parkʼs Department and Police Department buildings. Facilities Maintenance also assists other departments with facility improvement projects. For a list of completed projects and active projects please see the link below. Here is the link to the dashboard. https://oshkosh.maps.arcgis.com/apps/dashboards/fd51df64f06f499db2996451 4bd96768 Improve and expand Wi-Fi into all City buildings Owner: Tony Neumann Update provided by Tony Neumann on Sep 30, 2025 13:52:57 Installed and configured secure wifi access within the newly upgraded safety building training room. Objective 2.2 Progress 20% Strategy: 5 Strategy 2.2.1 Jan 01, 2025 - Ongoing On Track Strategy 2.2.2 Jan 01, 2025 - Ongoing On Track Page 8 Improve Our Public Works and Utilities Owner: Maria Fletcher %# On Track 100 5 Address critical facility issues and continue the transition to centralized facility management Owner: Jon Urben Update provided by Jon Urben on Jul 15, 2025 18:21:25 The Facilities Maintenance office is responsible for the daily management of all facility issues within a variety of municipal buildings, including City Hall, the Safety Building, Convention Center, Grand Opera House, Fire Stations 15-19, Seniors Center North and South, the Public Museum, the Field Operations Facility, the Parks Administration Building and other buildings. The transition to centralizing the facility maintenance oversight continues with regular visits and meetings with on-site facility managers. The development of the Munis FM software has been implemented June 1st. The new software will allow better tracking and monitoring of preventative maintenance tasks, work orders and more. Critical issues addressed in 2nd quarter, 2025 include: Addressed were frozen sprinkler pipe and failed air compressor within the Seniors Center North warehouse during the 1st quarter. Issue was resolved/repaired and will result in building a separate heated room for a new air compressor before the end of 2025. Complete energy efficiency assessment and identify opportunities within City facilities Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 16:28:34 The City of Oshkosh received the Energy Innovation Grant from the Public Service Commission of Wisconsin. Community Development staff, along with the consulting firm paleBLUEdot, developed a Comprehensive Energy Plan. This plan focuses on reducing the cityʼs carbon footprint and operational costs, while guiding proactive energy upgrades in municipal operations. Investigate the addition of more trash receptacles in the downtown area Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 16:31:38 DPW staff is working on the receptacles. Develop Storm Water Management Plans for all CIP projects Owner: Maria Fletcher Update provided by Maria Fletcher on Sep 30, 2025 05:00:01 Watershed modeling continues for several watersheds. State of Wisconsin grant received to assist with modeling previously unstudied watersheds. Strategy 2.2.3 Jan 01, 2025 - Ongoing On Track Strategy 2.2.4 Jan 01, 2025 - Ongoing Completed Strategy 2.2.5 Jan 01, 2025 - Ongoing On Track Objective 2.3 Progress 0% Strategy: 5 Strategy 2.3.1 Jan 01, 2025 - Ongoing On Track Page 9 Complete the design for tertiary filtration facility recommended in Wastewater Treatment Plant Facilities Plan in conformity with the Total Maximum Daily Load (TMDL) Plan Owner: Maria Fletcher Update provided by Maria Fletcher on Sep 30, 2025 05:00:01 Design ongoing, procurement package for electrical components has been bid and awarded. Develop policy for private side inflow and infiltration (I&I) reduction strategies Owner: Maria Fletcher Update provided by Maria Fletcher on Sep 30, 2025 05:00:01 Reviewing information from other communities and state statutes in order to develop preliminary program for review. Continue the development and implementation of public information and engagement initiatives to promote the activities completed by our utilities, including lead water service replacement Owner: Maria Fletcher Update provided by Maria Fletcher on Sep 30, 2025 05:00:01 Coordination with communications consultant ongoing. Regular social media and information campaigns ongoing with regard to construction projects. Conduct Central Garage/fleet staffing study to improve efficiency and lower costs Owner: Maria Fletcher Update provided by Maria Fletcher on Sep 30, 2025 05:00:01 Equipment inventory verification complete; working with consultants to review equipment inventory to staffing ratio. Strategy 2.3.2 Jan 01, 2025 - Ongoing On Track Strategy 2.3.3 Jan 01, 2025 - Ongoing On Track Strategy 2.3.4 Jan 01, 2025 - Ongoing On Track Strategy 2.3.5 Jan 01, 2025 - Ongoing On Track Page 10 SUPPORT ECONOMIC DEVELOPMENT Community Development Department Future State: Be recognized as a premier community in Wisconsin by fostering entrepreneurial activity, developing and retaining a diverse mix of employees & employment opportunities, and revitalizing the central city and waterfront in the greater Oshkosh area. Owner: Kami Zuercher %# On Track 88 14 Some Disruption 13 2 Assist Businesses to Remain in, Expand, or Relocate to Oshkosh Owner: Sara Rutkowski %# On Track 75 3 Some Disruption 25 1 Identify and support solutions to encourage existing business growth and entrepreneurship, including incentives, speculative buildings, incubators, and training opportunities Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 16:59:46 Our team is collaborating with businesses and organizations to support local growth and development. We are promoting a railroad connection to enhance access, submitting an application for a Community Development Investment grant for a local childcare incubator, facilitating land sales for expanding businesses, and using Tax Incremental Financing for economic projects. These initiatives aim to boost community development and economic vitality. Explore options to encourage Disadvantaged Business Enterprise (DBE) growth in the city, including financial and technical assistance Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 21:50:53 On September 30, 2025, the U.S. Department of Transportation announced changes to the Disadvantaged Business Enterprise (DBE) program. Now, all DBE firms need to go through a recertification process. Currently, the City of Oshkosh has no certified DBEs. Review existing City policies and codes to encourage business and entrepreneur growth in the city Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 17:20:28 City staff teamed up with a consultant group to review and assess various processes and municipal codes managed by the Community Development Department. This includes a code audit of Chapters 7 (Building) and 16 (Housing) to identify possible amendments that promote growth while maintaining health and safety standards. The project also reviews the structure and fees of required permits within the Inspections Division. The review is now complete and is being examined by City staff before moving forward with next steps. Collaborate with community partners to help facilitate discussions on an aligned economic development strategy for the City and community partners Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 17:23:07 City staff frequently collaborates with community partners on initiatives like land purchases for large business expansions, assisting in grant application submissions, and supporting the Business Improvement District (BID). Goal 3 Progress 0% Objective: 4 Strategy: 16 Objective 3.1 Progress 0% Strategy: 4 Strategy 3.1.1 May 01, 2025 - Ongoing On Track Strategy 3.1.2 May 01, 2025 - Ongoing Some Disruption Strategy 3.1.3 May 01, 2025 - Ongoing On Track Strategy 3.1.4 May 01, 2025 - Ongoing On Track Page 11 Support Redevelopment Opportunities throughout the City Owner: Sara Rutkowski %# On Track 75 3 Some Disruption 25 1 Develop Infrastructure and Resources Needed to Support Housing and Workforce Development Owner: Sara Rutkowski %# On Track 100 4 Implement at least one recommendation from the Imagine Oshkosh Plan annually Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 18:25:48 No new updates. Implement the Sawdust District Redevelopment Plan through targeted redevelopment in the Sawdust District Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 18:34:36 The Mill on Main development has been progressing and is expected to complete all phases by 2033. Support the development of the Riverwalk along the Fox River and Lake Winnebago, and finalize design plans for the Pioneer Area Riverwalk Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 18:40:14 The signage for the Riverwalk has been completed, and ongoing discussions are focusing on future development opportunities. However, the Pioneer Area Riverwalk project is currently on hold. Market redevelopment sites to private developers by issuing one request for proposal (RFP) annually Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 18:44:02 In early 2025, the City staff issued a Request for Proposals (RFP) for the 700 Block of S Main, but no proposals were submitted. Implement at least one Housing Study recommendation annually to facilitate infill development, new subdivisions, alternative housing options, inclusivity, and stronger neighborhoods Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 18:45:48 The Redevelopment Authority (RDA) approved housing specifications for RDA infill lots, which will also be applied to other housing projects. Objective 3.2 Progress 0% Strategy: 4 Strategy 3.2.1 May 01, 2025 - Ongoing Some Disruption Strategy 3.2.2 May 01, 2025 - Ongoing On Track Strategy 3.2.3 May 01, 2025 - Ongoing On Track Strategy 3.2.4 May 01, 2025 - Ongoing On Track Objective 3.3 Progress 0% Strategy: 4 Strategy 3.3.1 May 01, 2025 - Ongoing On Track Page 12 Provide Consistent Application and Enforcement of Building and Zoning Code Owner: Sara Rutkowski %# On Track 100 4 Support opportunities to financially incentivize residential development when feasible Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 18:52:26 Staff annually issues Pay-As-You-Go (PayGo) payments for eligible projects, including residential developments, and assists with Community Development Block Grant (CDBG) funding for active residential projects. Develop a workforce housing initiative with community partners Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 18:56:42 A workforce housing project was completed in 2025, with additional projects planned for the future. Collaborate with community partners on solutions to barriers preventing citizens from working, including daycare, affordable housing, and available transportation Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 21:49:28 City staff is assisting a community partner with submitting a grant application for a childcare incubator and collaborating with another partner with lots for single-family homes. Continue to streamline the approval and permitting process by providing one process improvement per year for developers while preserving health and safety Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 21:50:10 no new updates. Evaluate and address perceived development concerns to successfully promote building projects in Oshkosh Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 21:52:15 There are no new updates at this time, but staff recognizes the concern and will address it in future discussions. Conduct a survey of post-construction comments and input on experience with the Cityʼs approval and permitting process Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 21:52:41 No updates. Strategy 3.3.2 May 01, 2025 - Ongoing On Track Strategy 3.3.3 May 01, 2025 - Ongoing On Track Strategy 3.3.4 May 01, 2025 - Ongoing On Track Objective 3.4 Progress 0% Strategy: 4 Strategy 3.4.1 May 01, 2025 - Ongoing On Track Strategy 3.4.2 May 01, 2025 - Ongoing On Track Strategy 3.4.3 May 01, 2025 - Ongoing On Track Page 13 Periodically publish a success story via the City Managerʼs newsletter, social media, local news, etc. Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 21:53:51 The latest achievement is the completion of William Waters Plaza Strategy 3.4.4 May 01, 2025 - Ongoing On Track Page 14 STRENGTHEN OUR NEIGHBORHOODS Community Development Department Public Works Department Future State: Neighborhoods throughout the community are attractive, well-maintained, and desirable places to live, inspiring positive social interactions among residents. Owner: Kami Zuercher %# On Track 100 17 Enhance And Promote a Culture of Neighborhood Owner: Sara Rutkowski %# On Track 100 7 Collaborate with community partners in order to support the creation, maintenance, and sustainability of resident-led neighborhood associations Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 21:54:53 City staff collaborates closely with recognized neighborhood associations and Oshkosh Healthy Neighborhoods. Develop one neighborhood plan annually with resident leaders in a recognized neighborhood association and support the implementation of one project annually Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:03:44 No new neighborhood plans but neighborhood projects are ongoing. Continue to implement recommendations from the Housing Study to provide resources for neighborhood development and increase diverse housing options to facilitate long-term growth in the community Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:06:21 City staff is making progress on developing the former Washington school site for single-family residential workforce housing. Collaborate with community partners on resident training opportunities to enhance and sustain leadership development in neighborhood associations Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:07:17 No updates. Goal 4 Progress 0% Objective: 4 Strategy: 17 Objective 4.1 Progress 0% Strategy: 7 Strategy 4.1.1 May 01, 2025 - Ongoing On Track Strategy 4.1.2 May 01, 2025 - Ongoing On Track Strategy 4.1.3 May 01, 2025 - Ongoing On Track Strategy 4.1.4 May 01, 2025 - Ongoing On Track Page 15 Implement Development and Redevelopment in Specific Neighborhoods and Surrounding Commercial Corridors Owner: Sara Rutkowski %# On Track 100 3 Collaborate with the Oshkosh Healthy Neighborhood Alliance (OHNA) to support and advocate for neighborhood-based service delivery and policy development Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:09:25 No updates. Investigate additional strategies for communications with neighborhood associations that can be used to encourage social connectedness Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:09:58 No updates. Develop a city-wide neighborhood strategic plan Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:11:14 Staff recognizes the need, but this is currently on hold. Implement City redevelopment plans and housing plan to facilitate a targeted approach to redevelopment efforts in or near neighborhoods Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:12:51 Housing specifications and plans are available as a result of the housing study. Engage with community partners to explore the feasibility of a partnership to rehabilitate or construct new housing in the city Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:13:55 City staff is collaborating with community partners on multiple housing developments. Strategy 4.1.5 May 01, 2025 - Ongoing On Track Strategy 4.1.6 May 01, 2025 - Ongoing On Track Strategy 4.1.7 May 01, 2025 - Ongoing On Track Objective 4.2 Progress 0% Strategy: 3 Strategy 4.2.1 May 01, 2025 - Ongoing On Track Strategy 4.2.2 May 01, 2025 - Ongoing On Track Page 16 Leverage City Resources and Incentives to Encourage Private Investment and Maintenance in Neighborhoods Owner: Sara Rutkowski %# On Track 100 5 Promote the redevelopment of lots owned by the City and the Cityʼs Redevelopment Authority (RDA) Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:14:58 "For Sale" signs are placed on all Redevelopment Authority (RDA) owned lots. Implement recommendations from the Housing Study to promote neighborhood development and support initiatives to expand and diversify the cityʼs housing supply Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:16:56 Single-family homes and multi-family developments are being constructed to address the gaps identified in the housing study. Market housing development programs to preserve historical properties, provide safe and code-compliant housing, improve the curb appeal, increase home value, and cultivate homeownership Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:17:29 This is an ongoing program. Continue to promote and administer the “Great Neighborhoods Program” by completing two to four projects per year, and track public and private dollars leveraged Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:18:14 This is an ongoing program. Develop a long-term, private side lead service line replacement program to continue beyond the funding available within the Safe Drinking Water Loan Program Owner: Maria Fletcher Update provided by Maria Fletcher on Sep 30, 2025 05:00:01 Continuing to review PSC requirements for rate supported LSLR. Development of long range replacement plan ongoing, regulations require 100% replacement by 2037. Strategy 4.2.3 May 01, 2025 - Ongoing On Track Objective 4.3 Progress 0% Strategy: 5 Strategy 4.3.1 May 01, 2025 - Ongoing On Track Strategy 4.3.2 May 01, 2025 - Ongoing On Track Strategy 4.3.3 May 01, 2025 - Ongoing On Track Strategy 4.3.4 Jan 01, 2025 - Ongoing On Track Page 17 Collaborate with Community Partners to Reduce Housing Instabilities Owner: Sara Rutkowski %# On Track 100 2 Host an annual outreach event to promote neighborhood programs or contractor outreach program Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:19:57 City staff organizes informational meetings for residents and contractors to attend. Coordinate with the Winnebagoland Housing Coalition and other agencies to assist with initiatives to support residents with housing instability Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:20:22 No updates. Leverage public and private funding resources to implement diverse housing options Owner: Sara Rutkowski Update provided by Hannah Schueler on Nov 06, 2025 22:21:19 No updates. Strategy 4.3.5 May 01, 2025 - Ongoing On Track Objective 4.4 Progress 0% Strategy: 2 Strategy 4.4.1 May 01, 2025 - Ongoing On Track Strategy 4.4.2 May 01, 2025 - Ongoing On Track Page 18 PROVIDE A SAFE, SECURE, AND HEALTHY COMMUNITY Fire Department Police Department Transportation Department Future State: Residents and visitors feel that Oshkosh is a safe community. Owner: Kami Zuercher %# On Track 86 18 Some Disruption 5 1 Discontinued 5 1 Completed 5 1 Enhance Community Trust Owner: Tim Heiman %# On Track 50 1 Discontinued 50 1 Update provided by Tim Heiman on Jun 30, 2025 05:00:01 OFD to participate in National Night out Increase presence in the community through outreach efforts to strengthen relationships with neighborhoods and diverse community groups Owner: Jody Fulcher-Salvinski Update provided by Jody Fulcher-Salvinski on Sep 30, 2025 05:00:01 Officers participated in the Annual Police Lights of Christmas campaign at Culver's. This program provides gift cards to community members in need during the Christmas holiday season Officers continued their partnership with the Kiwanis Club Cops and Kids Reading program. An event was held at South Park where families met officers and books were given to the children School Resource Officers held their fourth Youth Leadership Camp for area youth ages 12-15. This camp provides life-enhancing skills with a strong emphasis on family and community National Night Out was held in August hosted by organizers from 15 neighborhoods Officers attended a Sawyer Creek Neighborhood Association meeting at Caramel Residence. They spoke about the department's Field Training process and provided a demonstration on our use of drones An officer attended the Cherith Clothing & Resource Center free sidewalk event for kids. Cherith provides resources for refugee families The 2025 Citizens Police Academy started in September where participants gain hands-on experience in a variety of topics related to law enforcement Officers participated in a breakfast with senior residents hosted by Miravida Living School Resource Officers hosted a "Lemonade With The Law" event at South Park Middle School Coffee With A Cop and (K9) Gema Visits are occurring at Nova House and Tiny Homes. It will expand to include the State Street Center, Shelter Care, Dispatch and the DA's Office in the coming quarters Third shift officers continue to perform community policing efforts in the N. Main Street tavern area and the taverns located near the University of Wisconsin-Oshkosh Campus. The community members that officers have an opportunity to interact with represent a diverse mix of citizens living in the community Goal 5 Progress 5% Objective: 6 Strategy: 21 Objective 5.1 Progress 0% Strategy: 2 Strategy 5.1.1 Jan 01, 2025 - Ongoing On Track Page 19 Enhance Crime Prevention, Fall Reduction, and Safety Strategies Owner: Tim Heiman %# On Track 100 2 Provide Well-Trained, Effective, and Equipped Public Safety Professionals Owner: Jody Fulcher-Salvinski %# On Track 83 5 Completed 17 1 Increase the reliability of resources that respond to fire and emergency medical services incidents by investigating the financial viability of adding a fourth, staffed ambulance unit Owner: Tim Heiman Update provided by Tim Heiman on Sep 30, 2025 13:49:33 Due to changes in service area 4th ambulance has been removed from budget. Additional study of call volume and service delivery time will be needed under new service area prior to making any staffing recommendations. Update provided by Tim Heiman on Jun 30, 2025 05:00:01 Meetings with community partners are in progress to identify future program goals. Stakeholders identified include Senior center and Community health. Provide education to public on crime, fire safety, and traffic safety through education, enforcement efforts, National Night Out, and other engagement opportunities Owner: Jody Fulcher-Salvinski Update provided by Jody Fulcher-Salvinski on Sep 30, 2025 05:00:01 Officers participated in National Night Out hosted by 15 neighborhood organizers Information on a variety of crime prevention/safety topics are posted consistently on our social media accounts Officers continue to assist Martin Luther School with developing and enhancing their safety plans, specific to active threats Officers completed Citizen Response to Active Shooter Events (CRASE) training for several local businesses, churches and other groups Officers are providing CHEERS classes to local bartenders to help combat the underage drinking issues in our city taverns Officers are instructing classes for the 2025 Citizen's Police Academy Monthly crime statistics have been posted to our website and social media accounts during this quarter An officer works closely with World Relief to provide traffic safety education to refugees Enhance and expand fall prevention and reduction programs with community partners Owner: Tim Heiman Update provided by Tim Heiman on Sep 30, 2025 13:31:47 OFD has re-engaged several partner agencies and is currently working with Winnebago Public Health on creating a MOU to share information. We believe having this MOU will provide the groundwork to formulate a more effective fall prevention program. Once the MOU is in place we will begin working on a plan for disseminating the information to the correct agency to ensure those in need are connected to the propper resource. Strategy 5.1.2 Jan 01, 2025 - Ongoing Discontinued Objective 5.2 Progress 0% Strategy: 2 Strategy 5.2.1 Jan 01, 2025 - Ongoing On Track Strategy 5.2.2 Jan 01, 2025 - Ongoing On Track Objective 5.3 Progress 17% Strategy: 6 Page 20 Improve the Community's Ability to Withstand and Recover from Disruptive Event and Reduce Risk Owner: Tim Heiman %# On Track 67 2 Some Disruption 33 1 Continue national- and state-level accreditation efforts Owner: Jody Fulcher-Salvinski Update provided by Jody Fulcher-Salvinski on Sep 30, 2025 05:00:01 The CALEA on-site assessment was conducted in August 2025. During the assessment, over 30 interviews were conducted. The assessor gave some recommendations, and overall had positive remarks about the department. The final accreditation decision will be made at the CALEA Conference, which is scheduled for November 2025. We continue to work towards our WILEAG reaccrediatation. The WILEAG on-site assessment will be conducted in February 2026. Continue annual review on all use of force incidents and provide feedback on trends or areas of concern Owner: Jody Fulcher-Salvinski Update provided by Jody Fulcher-Salvinski on Sep 30, 2025 05:00:01 The annual use of force review was completed in the first quarter with a report compiled for the Chief of Police. The next review will be completed in the first quarter of 2026. Continue to implement recommendations from the staffing study and the space utilization study Owner: Tim Heiman Update provided by Tim Heiman on Sep 30, 2025 13:33:33 CIP requests reflect study recommendations. Support youth programs to enable future recruitment Owner: Tim Heiman Update provided by Tim Heiman on Sep 30, 2025 13:35:43 Explorer program held open house last week. OFD currently has 8 interested students and it actively recruiting additional interested student. OFD has also had interest in "job shadow program" we have created a policy to allow "ride alongs" with OFD and have several scheduled with those interested in emergency services. Construct Fire Department training center Owner: Tim Heiman Update provided by Tim Heiman on Sep 30, 2025 13:36:28 Proposals are currently being reviewed. We hope to select a design firm and site in the near future. Explore the possibility of a future Police Department training center Owner: Jody Fulcher-Salvinski Update provided by Jody Fulcher-Salvinski on Sep 30, 2025 05:00:01 This initiative has been included in the City's Capital Improvement Plan. Update provided by Tim Heiman on Jun 30, 2025 05:00:01 Strategy 5.3.1 Jan 01, 2025 - Ongoing On Track Strategy 5.3.2 Jan 01, 2025 - Ongoing Completed Strategy 5.3.3 Jan 01, 2025 - Ongoing On Track Strategy 5.3.4 Jan 01, 2025 - Ongoing On Track Strategy 5.3.5 Jan 01, 2025 - Ongoing On Track Strategy 5.3.6 Jan 01, 2025 - Ongoing On Track Objective 5.4 Progress 0% Strategy: 3 Page 21 Improve Transportation Safety within Community Owner: Jim Collins %# On Track 100 3 Emergency management training G-402 - ICS Overview for Executives and Senior Officials scheduled for August Identify neighborhood risks and corresponding risk-reduction strategies Owner: Tim Heiman Update provided by Tim Heiman on Sep 30, 2025 13:40:16 OFD utilized NFIRS data to identify neighborhoods with demographics which are associated with higher fire risks. This year we have identified the Sawer Creek Neighborhood and have a targeted "detector trek" where for one week OFD will be going door to door to instal smoke detectors and check batteries. Continue to offer training and exercises to City staff focusing on emergency management Owner: Tim Heiman Update provided by Tim Heiman on Sep 30, 2025 13:41:07 Scheduling of spring training is in progress. OFD is working with Winnebago county E.M to identify courses and grant funding opportunities. Maintain the Continuity of Operations Plan (COOP) and Emergency Operations Plan (EOP) Owner: Tim Heiman Update provided by Tim Heiman on Sep 30, 2025 13:46:12 Review is of plan is currently underway. Winnebago county EM has indicated they will be overhauling the county plan in late 2026. This overhaul will likely have a major impact to the plan as they will be moving away from the ES function to a plan more married with the state. In consultation county EM has suggested on the city holding off on any major changes until the county plan is updated. At that time we will also change the city plan to mirror the county providing a consistent format from state to local. Continue to educate citizens and visitors on traffic safety through education and enforcement efforts Owner: Jody Fulcher-Salvinski Update provided by Jody Fulcher-Salvinski on Sep 30, 2025 05:00:01 Speed boards have been consistently deployed to problem areas throughout the City in response to citizen concerns Directed Traffic Enforcement efforts have been conducted for speeding /traffic issues: Bowen Street, 1600 block of New York Avenue, 1500 block of Kentucky Street, Ruschfield Drive Officers have been presenting at all Transportation Committee Board meetings, offering input/insight from the police department Traffic and pedestrian safety information is posted on our social media accounts Third shift officers are conducting traffic enforcement, paying special attention to impaired driving enforcement Officers routinely conduct enforcement efforts with citizens riding bicycles without proper lighting during hours of darkness to reduce the likelihood of traffic collisions between motorists and bicyclists Officers are conducting traffic safety related to areas of the community with increased foot traffic to assist with pedestrian safety Strategy 5.4.1 Jan 01, 2025 - Ongoing Some Disruption Strategy 5.4.2 Jan 01, 2025 - Ongoing On Track Strategy 5.4.3 Jan 01, 2025 - Ongoing On Track Objective 5.5 Progress 0% Strategy: 3 Strategy 5.5.1 Jan 01, 2025 - Ongoing On Track Page 22 Continue to Improve Strategies to Address Mental Health Crises and Substance Abuse in Community Owner: Jody Fulcher-Salvinski %# On Track 100 5 Continue to provide infant and child car seat checks and installation Owner: Tim Heiman Update provided by Tim Heiman on Sep 30, 2025 13:47:35 OFD and Winnebago county health agreement is going well with county providing several installations. OFD provides location and advertising and the county provides qualified installers Improve transportation safety through interdepartmental communication and assisting with coordination of street closures and detours Owner: Jim Collins Update provided by Jim Collins on Sep 30, 2025 13:37:28 Communicate detours and closures to Transit users through social media. DPW sends out weekly updates. Support local county Crisis Intervention Team (CIT) as well as drug and alcohol task forces and groups Owner: Jody Fulcher-Salvinski Update provided by Jody Fulcher-Salvinski on Sep 30, 2025 05:00:01 Criminal Investigation Division (CID) Lieutenant and Sergeant attend Winnebago County Overdose Fatality Review (OFR) meetings. In September 2025, it was identified that community hotels should have Narcan boxes/kits installed to help prevent overdose deaths. OFR and the police department will be working with those hotels in the upcoming months on this project. Promote the drug addiction prevention initiative within the community, including the education of and engagement with schools, neighborhood associations, and citizens regarding substance abuse Owner: Jody Fulcher-Salvinski Update provided by Jody Fulcher-Salvinski on Sep 30, 2025 05:00:01 A Detective and drug investigator presented on drug investigations during the 2025 Citizen's Police Academy The Criminal Investigation Division (CID) Lieutenant or Sergeant attended monthly Winnebago County Overdose Fatality Review Board meetings No DARE classes were conducted during this quarter due to the start of school. DARE classes will resume in the 4th quarter The police substation "Home Base" has been operational since June. The Community Outreach Sergeant, Behavioral Health Officer, and 2 Co- Responders have been actively engaging with our community members suffering from substance use and mental health issues. They provide education and resources to those in need Strategy 5.5.2 Jan 01, 2025 - Ongoing On Track Strategy 5.5.3 Jan 01, 2025 - Ongoing On Track Objective 5.6 Progress 0% Strategy: 5 Strategy 5.6.1 Jan 01, 2025 - Ongoing On Track Strategy 5.6.2 Jan 01, 2025 - Ongoing On Track Page 23 Expand deployment of the Behavioral Health Team Owner: Jody Fulcher-Salvinski Update provided by Jody Fulcher-Salvinski on Sep 30, 2025 05:00:01 Our Behavioral Health Team has recently started to expand the community outreach to Tiny Homes and NOVA House to reach high-risk individuals in our community. They have also started to assist with Adult Family Homes and Group Homes where there are numerous calls for service. This has included working with Winnebago County Crisis, Winnebago County Adult Protective Services, the proper Adult Family Home staff, numerous Manage Care Organizations, Guardians, and the placing of Countyʼs DHS (Department of Human Services) staff. In these meetings, there are numerous discussions on how to better serve the consumer and support staff, all while reducing calls for service. Increase enforcement of drug trafficking in our community Owner: Jody Fulcher-Salvinski Update provided by Jody Fulcher-Salvinski on Sep 30, 2025 05:00:01 July 2025: OPD Criminal Investigation Division (CID) and Appleton Police investigators conducted surveillance on a wanted subject. He was located and arrested in a vehicle. After a K9 search, numerous drugs were located where he was sitting Due to the recent arrest of an individual at a suspected drug house, a Nuisance abatement is being considered Continue to participate in active efforts to seek new opportunities for reducing overdoses Owner: Jody Fulcher-Salvinski Update provided by Jody Fulcher-Salvinski on Sep 30, 2025 05:00:01 During an Overdose Fatality Review (OFR) meeting held In September 2025, it was identified that community hotels should have Narcan boxes/kits installed to help prevent overdose deaths. OFR and the police department will be working with those hotels in the upcoming months on this project The Vice and Narcotics Unit is actively pursuing all tips involving illegal drugs coming into and being distributed throughout the community Strategy 5.6.3 Jan 01, 2025 - Ongoing On Track Strategy 5.6.4 Jan 01, 2025 - Ongoing On Track Strategy 5.6.5 Jan 01, 2025 - Ongoing On Track Page 24 ENHANCE THE EFFECTIVENESS OF OUR CITY GOVERNMENT Administrative Services Department Finance Department Future State: Organizational efficiency has been maximized by successfully achieving City initiatives. Owner: Kami Zuercher %# On Track 57 8 Upcoming 7 1 Completed 36 5 Build Trust through Communication, Education, Financial Transparency, and Relationship Building Owner: Jon Urben %# On Track 67 2 Completed 33 1 Coordinate public communication and education between departments in order to facilitate public awareness of City services and values Owner: Jon Urben Update provided by Jon Urben on Jul 15, 2025 18:22:11 Explore centralized/coordinated public communications and education. Produced and released State of the City video presentation Produced nine installments of City Manager Minute video series Continued to produce biweekly episodes of City Managerʼs Report Worked with Admin Services and the City Managerʼs office to administer and promote the annual community survey via Polco; also assisted Department of Public Works and GO Transit with their surveys Provided live coverage of Council workshops on Municipal Code Chapter 14, streetlight policy, facilities assessment, the 2026 budget, and Councilʼs meeting with local state representatives Produced new episode of Beyond the Badge highlighting OPDʼs new K9 Gemma Assisted Admin Services in promoting cityʼs new online public meeting calendar Assisted DPW with information about changes to the public drinking water system Assisted Transit, Finance and IT with public info about new Passport parking system Assisted Purchasing with public info about the cityʼs DemandStar procurement platform Assisted HR and OFD with public info about the selection of a new Fire Chief Assisted Parks with public info about 4th of July fireworks and festivities Facilitate public awareness of City services and values. Covered event at Seniors Center for the Directorʼs SilverSneakers Instructor of the Year finalist recognition Produced two episodes of Letʼs Talk Events podcast with Special Events Coordinator Worked with COTS to produce two new episodes of The Place to Be Oshkosh Worked with local branch of Disabled American Veterans to produce a new episode of The Outpost Provided coverage of the cityʼs Memorial Day Procession Covered local Flag Day ceremony at Oshkosh Elks Lodge Continued coverage of various city boards and commissions as well as County Board and School Board Assisted multiple local non-profits with video PSAʼs promoting their events and initiatives Goal 6 Progress 36% Objective: 4 Strategy: 14 Objective 6.1 Progress 33% Strategy: 3 Strategy 6.1.1 Jan 01, 2025 - Ongoing On Track Page 25 Improve Our Performance and Outcome Measures, Including Benchmarks Owner: Kortney Jenks %# On Track 33 2 Upcoming 17 1 Completed 50 3 Facilitate regular communications with, and feedback from, employees in order to maximize organizational improvement and job satisfaction Owner: Kortney Jenks Update provided by Kortney Jenks on Aug 06, 2025 18:26:18 Through work with the Diversity, Equity, and Inclusion (DEI) Employee Committee, Employee Recognition Committee, Wellness Committee, and by utilizing virtual meetings, the Human Resources Division enhanced communication with employees. Examples of this include: City Manager Organizational Update Meeting on July 24, 2025 Ongoing staffing updates Lunch & Learns sessions that are held regularly Clarify the roles of elected officials, boards and commissions, staff & the public Owner: Tashina Weber Update provided by Tashina Weber on Jun 30, 2025 05:00:01 Updated City Council Manual and placed online Continue employee education regarding performance measures / metrics Owner: Kortney Jenks Update provided by Kortney Jenks on Aug 06, 2025 18:26:32 The Human Resources Division continues to integrate education on performance measures and metrics into the onboarding process for new employees, as well as through our revised performance evaluation process. Promote benchmark opportunities functionally, geographically & comparably Owner: Kami Zuercher Update provided by Kami Zuercher on Sep 30, 2025 05:00:01 Staff reviewed metrics for clarity and usefulness at the outset of the plan, and eliminated those that were deemed unhelpful. Staff continues to identify metrics that can be used to help achieve goals and objectives. Utilize the citizen survey as a resource for future strategic planning and metric development Owner: Kami Zuercher Update provided by Kami Zuercher on Sep 30, 2025 05:00:01 Polco was again engaged to administer the National Community Survey (NCS) for 2025. They mailed surveys to a representative sample of Oshkosh households in April, and opened the survey to all for online participation in May. Polco delivered their final report as well as an interactive, online dashboard of results, which have been posted to the City's website. Strategy 6.1.2 Jan 01, 2025 - Ongoing On Track Strategy 6.1.3 Jan 01, 2025 - Ongoing Completed Objective 6.2 Progress 50% Strategy: 6 Strategy 6.2.1 Jan 01, 2025 - Ongoing On Track Strategy 6.2.2 Jan 01, 2025 - Ongoing Completed Strategy 6.2.3 Apr 01, 2025 - Ongoing Completed Page 26 Maximize Our Financial Position Owner: Denise Edwards %# On Track 100 2 Align departmental plans with organization-wide plan Owner: Kami Zuercher Evaluate and modify City employee performance evaluation systems Owner: Kortney Jenks Update provided by Kortney Jenks on Aug 06, 2025 18:26:48 The Human Resources Division is evaluating the current performance evaluation system to identify areas for improvement, while also researching other systems that will enhance both employee and organizational success. Refine connection with “Guiding Principles” in employee evaluation process to improve understanding of employeeʼs role in achieving strategic plan Owner: Kortney Jenks Update provided by Kortney Jenks on Apr 15, 2025 14:39:47 In 2024, the Human Resources division rolled out an updated performance evaluation in which the guiding principles have been better defined to enhance clarity and effectiveness. Update provided by Denise Edwards on Jul 16, 2025 16:30:02 Accomplishments: The unassigned general fund balance as of December 31, 2023, was $17,822,464, representing 31.49% of the 2024 General Fund budgeted expenditures, exceeding the City's minimum policy requirement of 16% and targeted maximum of 30%. Projections for the end of 2024 estimate the General Fund balance at approximately $19,835,029, or 35.83% of General Fund expenditures. The 2025 budget identifies Taxes and Special Assessments (40.6%) and Intergovernmental Revenues (35.6%) as the primary sources, comprising over 75% of General Fund revenues. Next Steps: Review and assess the fund balance policy to determine if adjustments are warranted based on current and projected balances. Consider strategies for optimal use of excess fund balance in alignment with City priorities and fiscal policies. Continue monitoring revenue sources and expenditure trends to ensure ongoing compliance with fund balance requirements. Strategy 6.2.4 Jan 01, 2026 - Ongoing Upcoming Strategy 6.2.5 Jan 01, 2025 - Ongoing On Track Strategy 6.2.6 Jan 01, 2025 - Ongoing Completed Objective 6.3 Progress 0% Strategy: 2 Page 27 Recruit, Retain, Engage, Develop, and Recognize Employees Owner: Kortney Jenks %# On Track 67 2 Completed 33 1 Develop 10-year CIP consistent with Debt Management Policy Owner: Denise Edwards Update provided by Denise Edwards on Jul 16, 2025 16:30:28 Finance Department Update Accomplishments: Development of a 10-year Capital Improvement Plan. Implementation of PlanIt software for tracking capital projects and reporting requests. Alignment of capital project tracking with the Debt Management Policy. Roadblocks: No significant roadblocks reported at this time. Next Steps: Continue monitoring and updating project data within PlanIt. Regularly review and ensure ongoing compliance with the Debt Management Policy. Prepare periodic reports to inform stakeholders of project status and capital needs. Monitor and report on Debt Management Policy progress Owner: Denise Edwards Update provided by Denise Edwards on Jul 16, 2025 16:30:57 Debt Limit Status Update Accomplishments: Maintained outstanding general obligation debt at $125,345,747, representing 43% of the statutory debt limit. Kept debt level below the City's internal threshold of 60% of the maximum allowed by state statutes. Next Steps: Continue monitoring debt issuance to ensure alignment with City goals. Evaluate strategies to further reduce outstanding debt toward the 40% target. Communicate progress and financial status in future comprehensive financial reports. Continue to diversify employee population in order to align with community demographics Owner: Kortney Jenks Update provided by Kortney Jenks on Aug 06, 2025 18:27:02 The Human Resources Division consistently reaches out and advertises with diverse organizations in an effort to engage a wider range of applicants. Additionally, the division continually develops and fosters relationships with local organizations to explore partnership opportunities while actively seeking additional resources to support these initiatives. Provide employee leadership training for supervisors and continued DEI training for all employees Owner: Kortney Jenks Update provided by Kortney Jenks on Aug 06, 2025 18:28:25 In the second quarter of 2025, the Human Resources Division conducted quarterly compliance training sessions through our learning management system for all employees and supervisors, and managers. Additional professional development opportunities are accessible via the League of Wisconsin Municipalities Mutual Insurance online training portal, and local training opportunities are communicated as they arise. Strategy 6.3.1 Jan 01, 2025 - Ongoing On Track Strategy 6.3.2 Jan 01, 2025 - Ongoing On Track Objective 6.4 Progress 33% Strategy: 3 Strategy 6.4.1 Jan 01, 2025 - Ongoing On Track Strategy 6.4.2 Jan 01, 2025 - Ongoing On Track Page 28 Collaborate with other departments to improve onboarding and training for boards, commissions, and Council Owner: Tashina Weber Update provided by Tashina Weber on Jun 30, 2025 05:00:01 Updated City Council Manual Strategy 6.4.3 Jan 01, 2025 - Ongoing Completed D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Downtown plan update B a c k g r o u n dBackground See th e attach m en ts, in clu din g article 2 of th e attach ed City Man ager's n ewsletter from O ctober 1 0 th , for m ore in form ation . A t t a c h m e n t sAttachments Downtown Oshkosh Redevelopment Opportunities Investment Fact Sheet 10.10.25 Newsletter Downtown Oshkosh Redevelopment Opportunities Common Council – October 28, 2025 City of Oshkosh 2000 Downtown Action Plan 2014 Riverfront Visioning Summary Report •Minutes from presentation at 1/13/2015 meeting 2017 Imagine Oshkosh: A Master Plan for our Center City •Video of presentation from Houseal Lavine ; Video of discussion to approve the plan, same meeting •Imagine Oshkosh: Existing Conditions Report 2018 City of Oshkosh Comprehensive Plan Update 2040 ; Future Land Use Map (Draft) •Video of presentation from ECWRPC at 9/25/2018 meeting •2024 Downtown Visualization ; Downtown Visualization Main Image •Downtown Redevelopment Plan Presentation o Common Council May 28, 2024 – video of presentation o Parks Board July 8, 2024 – video of presentation Downtown Plans Across 25 years, five major plans reinforce riverfront property as key redevelopment sites: • 2000: Connectivity & infill • 2014: Activate riverfront • 2017: Mixed-use catalyst site • 2018: Mixed-use/high-density vision • 2024: Concept renderings for cohesive downtown riverfront vision Consistent Vision Across Plans Based on the public process, nine critical focus areas were created: 1.Maximize economic development and land use opportunities within Downtown Oshkosh and along the Fox River 2.Create a special place to celebrate community life 3.Celebrate the city’s cultural heritage and enhance its civic image 4.Provide safe, efficient, and convenient vehicle and pedestrian transportation and circulation throughout the City and make downtown user-friendly 5.Maximize riverfront linkages and pedestrian connectivity to the downtown and surrounding community 6.Create open spaces and recreational activities and promote environmental preservation 7.Enhance and maintain the public realm 8.Increase downtown residential development 9.Establish mechanisms to make plans happen 2000 Action Plan 2017 Imagine Oshkosh 2024 Downtown Redevelopment Plan CITY CENTER REDEVELOPMENT BLOCK DOWNTOWN IMPROVEMENT RECOMMENDATIONS – CATALYST SITE Owned by Bayshore Development II, LLC Address: 101 Commerce Street, Oshkosh Details: •Single structure with frontage on Commerce Street and Pearl Avenue. •Two-story office and retail building •Approximately 100,540 gross square feet (97,260 square feet of rentable area). •First floor is occupied by various retail shops known as the Shops at City Center. •The majority of the building, approximately 86,234 square feet, is occupied by a local corporate headquarters. City Center Properties Unit 1 Unit 2 is owned by City Center Associates, LLC with a mailing address of 201 Pearl Avenue, and consists of a multi-tenant office/retail building with frontage along Pearl Avenue, Division and Jackson Streets. Unit 2 has a gross building area of approximately 357,208 square feet (not including the parking ramp) and is a mix of one and two-story structures. The building is occupied by various tenants, including retail shops, office uses, a daycare, a restaurant and the United States Social Security office. City Center Properties Unit 2 Recent History Date Details Misc 5/28/24 Common Council Presentation – Downtown Redevelopment Plan video of presentation 7/8/24 Parks Board Presentation – Downtown Redevelopment Plan 7/3/24 and 8/27/24 Res 24-469 **Approve General Development Plan and Specific Implementation Plan for a Personal Storage Facility at 400 City Center (Plan Commission Recommends Approval . https://youtu.be/Xg1- wUppzkw?si=MMRfKkWStHycY3p4&t=1291 ; RES 24-469 GDP SIP 400 City Center 7/3/24 and 8/27/24 *Ord 24-438 Approve Zone Change from Central Mixed-Use District with Riverfront Overlay (CMU -RFO) to Central Mixed-Use District with Riverfront and Planned Dev Overlay (CMU-RFO-PD) at 400 City Center (Plan Commission Recommends Approval)Held over until applicant requests reconsideration 10/22/24 City Hall Facilities Study View Agenda Item; Video of presentation ; PDF presentation of City Hall options; Full 2024 facilities study (PDF) 11/12/24 Closed Session (re city hall), Tuesday, November 26th, after Council meeting View Agenda Item 10/14/25 Closed Session (re downtown redevelopment plan)View Agenda Item Questions INVESTING IN OUR FUTURE SCAN TO READ THE DOWNTOWN REDEVELOPMENT PLAN THE DOWNTOWN REDEVELOPMENT PLAN BUILDING A STRONG TAX BASE WHY OSHKOSH BUDGETS FOR STRATEGIC INVESTMENTS Strategic investments in the community are essential to ensure Oshkosh’s vitality, sustainability and fiscal health for generations to come. The proposed 2026 budget funds investments that carry out the vision of the 2024 Downtown Redevelopment Plan and will position the community for needed future growth. In 2024, the Downtown Oshkosh Business Improvement District (BID) created a strategic Downtown Redevelopment Plan to: Reimagine Oshkosh’s downtown and waterfront as a connected, inviting and active district for residents to use and enjoy; Transform underutilized properties into dynamic hubs of activity and culture; and Generate new, sustainable tax revenues. The State of Wisconsin restricts local property tax levy increases based on "net new construction" (the amount of new development in the prior year). Because Oshkosh is a largely developed community with limited opportunities for new construction, the City must be creative and forward-looking in finding opportunities to invest and grow the tax base. With the successful implementation of the Downtown Redevelopment Plan, net new construction will increase and build levy capacity for the future. That will reduce the property tax burden on homeowners while maintaining services and financial stability. TO L E A R N MOR E A BO UT OS HKOS H 'S P L A N S F O R A S T RO N G F I N A N C I A L F UT U R E , V I S I T W W W .O S H KO S H W I .G OV TO L E A R N MOR E A BO UT OS HKOS H 'S P L A N S F O R A S T RO N G F I N A N C I A L F UT U R E , V I S I T W W W .O S H KO S H W I .G OV RECENT CITY INVESTMENTS IN DOWNTOWN REDEVELOPMENT Mill on Main. This housing and commercial project will add about 300 units and 20,000 square feet of commercial space to Oshkosh, transforming the downtown and revitalizing the Sawdust District. Once complete, Mill on Main is expected to bring $47 million in new property value, along with renewed vibrancy to the District. BEFORE AFTER ThedaCare. This new health campus will add jobs and health access opportunities to downtown Oshkosh. Additionally, this project returns access to emergency rooms to downtown for the first time in 25 years. The taxable portion of this project will be about $34 million — a sizable contribution to the property tax base. The City Center properties, originally built as an urban mall in 1970, are a cornerstone in Downtown Oshkosh. The potential purchase of these properties by the City presents a once-in-a-generation opportunity to shape Oshkosh’s riverfront and advance the goals of the Downtown Redevelopment Plan. The redevelopment of this riverfront parcel is anticipated to build on downtown Oshkosh’s current position as a major regional draw. The Grand Oshkosh. Oshkosh’s own opera house — a major tourist draw — will be renovated through a public-private partnership with the City and The Grand Oshkosh, Inc. Once complete, the annual economic benefit from tourists drawn to the downtown for programming at The Grand is estimated to be $3.5 million — nearly double the current impact. WHAT ’S NEXT? SPOTLIGHT ON: THE CITY CENTER MALL : TO: Honorable Mayor and Members of the Common Council FROM: Rebecca Grill, City Manager DATE: October 10, 2025 RE: Weekly Newsletter 1. COUNCIL WILL SEEK APPLICATIONS FOR VACANT SEAT: Next week, the Oshkosh Common Council will open the process to fill a vacant seat on the Council. There is now a seat open due to the resignation of Council Member Kris Larson. “I would like to thank Mr. Larson for his dedicated service to the City of Oshkosh,” said Mayor Matt Mugerauer. “We are, without a doubt, better off because of his service. While he will be missed on Council, I’m confident that Kris will continue to strongly advocate for ways to make Oshkosh a better place to live, work, play, and invest.” In accordance with Wisconsin State Statutes, in the event of a vacancy on the Council, applications are solicited from residents interested in filling the vacant position. Applicants will have 30 days to submit their applications, at which point the Common Council will review the application materials. Applicants will be asked to make a five-minute presentation at the Tuesday, November 25, 2025, meeting of the Oshkosh Common Council, and Council will vote and make an appointment at the meeting that night. More information about the position and the process will be available on the City’s website beginning next week. For questions regarding this process, please contact the Oshkosh City Manager’s office at citymgr@oshkoshwi.gov or (920) 236-5002. 2. MAJOR OPPORTUNITY: CITY CONSIDERS MOVING FORWARD WITH DOWNTOWN REDEVELOPMENT PLAN: The City of Oshkosh has a unique opportunity to acquire the property commonly known as the City Center, a site already fostering a variety of successful businesses that contribute to the area's vitality. This opportunity provides the ability to invest in our community's future and align the area with the Downtown Redevelopment Plan to further enhance its status as a vibrant destination. The October 14, 2025 Council agenda will include the following item for closed session: “potential redevelopment and/or acquisition of property located at 101 Commerce Street and 201 Pearl Avenue in the City of Oshkosh, commonly known as City Center.” Should the Council give direction to explore this opportunity further, the item will appear on future agendas for public input, discussion and consideration. This location is considered a catalyst site in the Downtown Redevelopment Plan, located on the City’s Planning Services page. If the Council eventually decides to move forward with the acquisition of the property, it will be the first step for future redevelopment. This property, with its prime riverfront location, holds even greater potential for transformative growth. Through the initial acquisition of this site, the City of Oshkosh — on behalf of residents — will have a stronger influence on its future and strategically guide Oshkosh’s continued trajectory as a premier destination. This potential purchase is a crucial investment into Oshkosh’s future because it is expected to create a more vibrant destination for both residents and visitors. Creative deliberation and redevelopment of this riverfront parcel are anticipated to build on downtown Oshkosh’s current position as a major regional draw. Furthermore, revitalizing the location is important for our financial success as a community. By redeveloping this key parcel and others, we can build a dependable tax base for years to come, which can help reduce the property tax burden on homeowners. If you wish to share comments or have questions, please contact my office, citymgr@oshkoshwi.gov or (920) 236-5002. 3. TRANSPORTATION COMMITTEE MEETING MOVED TO MONDAY: Due to the City of Oshkosh Common Council budget workshop next week, the Transportation Committee meeting for October has been moved to Monday, October 13th at 4:00pm in Room 404 of City Hall (215 Church Ave). The agenda for the meeting and related materials can be found on the City’s online document center. 4. ROAD CLOSURE OF INTERSECTION OF WEST SOUTH PARK AVENUE AND NEBRASKA STREET: The City of Oshkosh would like to notify residents that the intersection of West South Park Avenue and Nebraska Street will be closed beginning the week of October 13th due to the Nebraska Street Sanitary Interceptor Sewer Construction Project (Project) happening in that area. Construction is expected to take approximately three weeks, with the intersection planned to be open by October 31st. The work for this Project, being conducted by general contractor Advance Construction, consists of the public construction of sanitary sewer, concrete pavement, and sidewalk on Nebraska Street. If you wish to receive e-mailed construction updates for this Project, Contract 25-02, please visit our Public Works Email Distribution Lists page and follow the instructions at the top of the page. If you have any questions, please contact Construction Management Supervisor Craig Ramthun. 5. GET INVOLVED IN A BOARD OR COMMISSION: If you are interested in serving your community, consider becoming a member of one of the City’s citizen advisory boards, commissions, or committees. There are current openings on the following boards and commissions: Board of Review Board of Zoning Appeals Landmarks Commission Long Range Finance Committee Plan Commission Transportation Committee To learn more about the boards and commissions, or to complete an application to serve, visit our boards and commissions webpage. If you have questions about current openings, the process of appointment, or need more information about a particular board, please contact the City Manager’s Executive Assistant, Kami Zuercher, by email (kzuercher@oshkoshwi.gov) or call 920-236-5002. D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Current initiatives A t t a c h m e n t sAttachments 11.11.25 Current Initiatives City of Oshkosh Status of Current Initiatives Date of Initial Request Affected Department(s) (if applicable) Initiative Current Status Next Status Report/Update Other Notes 11/26/2024 Public Works / Finance / Legal Special Assessment Deferral Policy Council discussed recommendation of Long Range Finance Committee and provided direction to staff at their 10/28/2025 meeting. 11/25/2025 Ordinance will be drafted for consideration at an upcoming meeting. 11/11/2025 D A T E :D A T E :November 11, 2025 S U B J E C T :S U B J E C T :Background information for closed session related to City Center B a c k g r o u n dBackground Th e Down town R edev elopm en t Plan , created in May 2 0 2 4 , ou tlin es h ow im portan t th e dev elopm en t of O sh k osh 's Dow n tow n area is to th e fu tu re of O sh k osh . Th e plan specifically em ph asizes th e n eed for m ore in v estm en t in th e dow n tow n reg ion . By in v estin g in u n deru tilized or v acan t properties, th e city can stim u late econ om ic growth , im prov e in frastru ctu re, an d attract n ew bu sin esses an d residen ts. Th is n ot on ly rev italizes areas in n eed bu t also in creases property v alu es, leadin g to h ig h er tax rev en u es ov er tim e. City staff h av e been h av in g in form al con v ersation s with th e own ers of th e City Cen ter property for th e last few years abou t possible acqu isition an d poten tial redev elopm en t of th e property. Th e own ers, Bay Sh ore Dev elopm en t II, LLC an d City Cen ter Associates, LLC, h av e n ow approach ed th e City abou t acqu irin g an d redev elopin g th e City Cen ter properties. Staff is seek in g Cou n cil g u idan ce an d direction in order to proceed. Th e City Cen ter property is a form er u rban m all property con stru cted in 1 9 7 0 an d con sistin g of sev eral bu ildin gs, com m on areas an d park in g facilities bou n ded by Com m erce Street on th e east, Jack son an d Div ision Streets on th e west, Pearl Av en u e on th e n orth an d th e Fox R iv er on th e sou th . Th e parcel is cu rren tly u n der a con dom in iu m form of ow n ersh ip with 2 u n its. Un it 1 is own ed by Baysh ore Dev elopm en t II, LLC w ith a m ailin g address of 1 0 1 Com m erce Street, O sh k osh an d con sists of a sin gle stru ctu re w ith fron tage alon g Com m erce Street an d Pearl Av en u e. Un it 1 is a tw o-story office an d retail bu ildin g w ith approxim ately 1 0 0 ,5 4 0 g ross squ are feet (9 7 ,2 6 0 squ are feet of ren table area). Th e first floor is occu pied by v ariou s retail sh ops k n ow n as th e Sh ops at City Cen ter. Th e m ajority of th e bu ildin g, approxim ately 8 6 ,2 3 4 squ are feet, is occu pied by a local corporate h eadqu arters. Un it 2 is own ed by City Cen ter Associates, LLC with a m ailin g address of 2 0 1 Pearl Av en u e, an d con sists of a m u lti-ten an t office/retail bu ildin g with fron tag e alon g Pearl Av en u e, Div ision an d Jack son Streets. Un it 2 h as a g ross bu ildin g area of approxim ately 3 5 7 ,2 0 8 squ are feet (n ot in clu din g th e park in g ram p) an d is a m ix of on e an d tw o-story stru ctu res. Th e bu ildin g is occu pied by v ariou s ten an ts, in clu din g retail sh ops, office u ses, a daycare, a restau ran t an d th e Un ited States Social Secu rity office. Th e pu rpose of th e closed session is to discu ss bargain in g option s, strategy, param eters an d term s related to th e poten tial redev elopm en t an d/or acqu isition of th e City Cen ter property.