Loading...
HomeMy WebLinkAbout0112422 VOID No112422 CITY OF OSHKOSH V O I D OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD ON THE WATER CHA VANG/YE YANG Job Address1014 OAK STOwnerCreate Date01/25/2005 DesignerContractorSHAMROCK CONSTRUCTION INC Category141 - Exterior RemodelingPlan TypeBuildingSignCanopyFenceRaze ZoningClass of Const:Size Sq. Ft.Projection Unfinished/Basement0Rooms0Height0Ft. Finished/Living 0Sq. Ft.Bedrooms0StoriesCanopies0 Garage0Sq. Ft.Baths0Signs0 Poured ConcreteFloating SlabPierOther Foundation Concrete BlockPostTreated Wood Occupancy PermitNot RequiredFlood PlainHeight Permit Park Dedication# Dwelling Units0# Structures0 RES/ Repair fire damage. Replace/repair damaged walls, roof system, siding, windows, doors, wall surfaces and other misc. features. See Use/Nature Contract for list of work. of Work HVAC ContractorPlumbing Contractor Electric Contractor Fees: Valuation$22,360.00Plan Approval$0.00Permit Fee Paid$133.00Park Dedication$0.00 01/25/200500/00/0000 Issued By:DateFinal/O.P. üü Permit Voided wrong contractorParcel Id #1110040000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. SignatureDate Agent/Owner N5964 COUNTY RD DNEW LONDONWI549610000920-982-0194 Address-Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. e OSHKOSH ON THE WATER Job Address 1014 OAK ST CITY OF OSHKOSH No 112422 BUILDING PERMIT - APPLICATION AND RECORD Owner CHA VANG/YE YANG Create Date 01/25/2005 Designer Contractor SHAMROCK CONSTRUCTION INC Category 141 - Exterior Remodeling Plan Type 18 Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. Rooms 0 Height 0 Ft. U Projection 1 Finished/Living Bedrooms 0 Stories Canopies 0 Garage ~ Sq. Ft. Baths 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 8 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 RES/ Repair fire damage. Replace/repair damaged walls, roof system, siding, windows, doors, wall surfaces and other misc. features. See Contract for list of work. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $22,360.00 Plan Approval $0.00 Permit Fee Paid $133.00 Park Dedication $0.00 Issued By: Date 01/25/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 111 0040000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address N5964 COUNTY RD D Agent/Owner NEW LONDON WI 54961 - 0000 Telephone Number 920-982-0194 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.