Loading...
HomeMy WebLinkAbout0112413 H 112413 CITY OF OSHKOSH No OSHKOSHHVAC PERMIT - APPLICATION AND RECORD ON THE WATER HENRY WEITZ JR Job AddressOwner 345 S OAKWOOD RD Create Date01/25/2005 ContractorAIR TECH HEATING INCCategory500 - Residential-Heating & VentilatingPlan OilElectric üü GasSolarSolid Fuel New üü ReplaceOther System üü Forced AirRadiantSteamA/CVent ElectricHot WaterSuppl.Con. Burner Chimney TypeChimney AChimney BDirect VentNot Applicable Heat LossAs ApprovedExistingNot ApplicableValue0 As Per PlanVariableOther BTU RateValue Use/Nature SFR/ Replace furnce -SFR/ Replace furnace. No Chimney lineer being installed. of Work No EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED FOR CONNECTION OF THIS APPLIANCE Where an appliance is permanently disconnected from an existing chimney or vent (C/V), the C/V shall be resized as necessary to control flue gas condensation in the interior of the C/V and to provide the appliance or appliances served with the req. draft. Plan Approval$0.00 Fees: Valuation$2,500.00Permit Fee Paid$42.50 Issued By:Date01/25/2005 Permit Voided Parcel Id #0654260000 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. SignatureDate Agent/Owner Address1305A INDUSTRIAL PKWYFOND DU LACTelephone Number920-924-6742 WI54937-0 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.