HomeMy WebLinkAbout2005-Building
e
OSHKOSH
ON THE WATER
Job Address 927 WASHINGTON AVE
CITY OF OSHKOSH
No
112427
BUILDING PERMIT - APPLICATION AND RECORD
Owner
JESSE D/TORI SLAIN
Create Date
01/25/2005
Designer
Contractor
LAIB RESTORATION INC
Category
140 - Interior Remodeling
Plan
Type
18 Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
0 Sq.Ft.
~ Sq. Ft.
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
U Projection 1
Finished/Living
Canopies
0
Garage
~ Sq. Ft.
Signs
0
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
8 Other
Occupancy Permit
Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
0
# Structures
0
Res/ Open dining area to adjacent room by removing wall and install posts and beam in its place. Replace 8 windows (6 windows will be
elongate, reducing sill height) Add 8' of handrail with intermediate rails on open side of stairs, install a 8' patio door.
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$25,000.00
Plan Approval
$0.00 Permit Fee Paid
$139.00 Park Dedication
$0.00
Issued By:
Date 01/25/2005
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 0203220000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
21 W NEW YORK AVE
Agent/Owner
OSHKOSH
WI 54901 - 3757 Telephone Number
233-7026
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.