HomeMy WebLinkAbout0111451-Building (roof)OSHKOSH
ON THE WATER
.Job Address 761 FLORIDA AVE
Designer
Category 141 - Extedor Remodeling
Type · Building (~ Sign
CITY OF OSHKOSH No 111451
BUILDING PERMIT - APPLICATION AND RECORD
Owner WESLEY METHODIST CHURCH Create Date 11/02/2004
Contractor W J WOODRUFF ROOFING CONTRACTORS II
Plan
(~ Canopy O Fence (~ Raze
Zoning
Unfinished/Basement
Finished/Living
Garage
Foundation
0 Sq. Ft.
0 Sq. Ft.
0 Sq. Ft.
· Poured Concrete (~ Floating Slab
(~ Concrete Block (~ Post
Occupancy Permit
Park Dedication
Class of Const: Size
Rooms 0 Height 0 Ft. [] Projection J
Bedrooms 0 Stories Canopies
Baths 0 Signs
(~ Pier (~) Other
(~ Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures 0
Use/Nature commercial / tear off and replace existing roofing on fellowship wing, no structural changes
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation $32,292.00
Issued By:
Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided~
Plumbing Contractor
$163.00 Park Dedication $0.00
Date 11/02/2004 Final/O.P. 00/00/0000
Parcel Id # 1302110000
in the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to sec~ur~.'~_.e~'sary approvals before
Signature ~ ~ Date
s p/~OBO Agee~rC~rwner
Addres X 763 FOND DU LAC Wi 54936 - 0763 Telephone Number 920-922-3110
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.