Loading...
HomeMy WebLinkAbout0111585-Building (roof)OSHKOSH ON THE WATER Job Address 136 JACKSON ST Designer Category Type Owner PABST LLC Contractor LAKEWOOD ROOFING 226- Alteration Public Works, Utilities, Municipal · Building (~) Sign (~) Canopy (~ Fence CITY OF OSHKOSH No 111585 BUILDING PERMIT - APPLICATION AND RECORD Create Date 11/11/2004 Plan Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation (~ Poured Concrete (~ Floating Slab (~ Pier · Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature }ffices/Reroof- Tear off existing, install ISO insulation and rubber membrane roof. of Work HVAC Contractor Electric Contractor Fees: ~1~ $11,900.00 Valuation Issued By: Plan Approval $0.00 Permit Fee Paid [] Permit Voided J Plumbing Contractor $84.00 Park Dedication $0.00 Date 11/11/2004 Finat/O.P. 00/00/0000 Parcel Id # 0101960000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the Ci[y strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address P.O. BOX 15 Agent/Owner WINNEBAGO WI 54985 - 0015 Telephone Number 235-1955 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.