HomeMy WebLinkAbout0111585-Building (roof)OSHKOSH
ON THE WATER
Job Address 136 JACKSON ST
Designer
Category
Type
Owner PABST LLC
Contractor LAKEWOOD ROOFING
226- Alteration Public Works, Utilities, Municipal
· Building (~) Sign (~) Canopy (~ Fence
CITY OF OSHKOSH No 111585
BUILDING PERMIT - APPLICATION AND RECORD
Create Date 11/11/2004
Plan
Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation (~ Poured Concrete (~ Floating Slab (~ Pier · Other
(~ Concrete Block (~ Post (~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature }ffices/Reroof- Tear off existing, install ISO insulation and rubber membrane roof.
of Work
HVAC Contractor
Electric Contractor
Fees: ~1~ $11,900.00
Valuation
Issued By:
Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided J
Plumbing Contractor
$84.00 Park Dedication $0.00
Date 11/11/2004 Finat/O.P. 00/00/0000
Parcel Id # 0101960000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the Ci[y strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address P.O. BOX 15
Agent/Owner
WINNEBAGO WI 54985 - 0015 Telephone Number 235-1955
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.