HomeMy WebLinkAbout0112378-BuildingOSHKOSH
ON THE WATER
.lob ,Address 337 W 16TH AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner JAMES I/CINDY S MATHE
Contractor OWNER
Category 140 - Interior Remodeling
No 112378
Create Date 01/20/2005
Plan
Type IO Building (~ Sign (~ Canopy (~ Fence ~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Finishing the unfinished 2nd flood attic. The area will be used as one room with no partition walls. Natural light shall be provided and a
of Work minimum ceiling height shall be provided. A patio door will be installed.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$4,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$38.00 Park Dedication $0.00
Date 01/20/2005 Final/O.P. 00/00/0000
Parcel Id # 0904890000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 337W 16TH AVE
Agent/Owner
OSHKOSH
WI 54902 - 6801 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.