Loading...
HomeMy WebLinkAbout0112378-BuildingOSHKOSH ON THE WATER .lob ,Address 337 W 16TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner JAMES I/CINDY S MATHE Contractor OWNER Category 140 - Interior Remodeling No 112378 Create Date 01/20/2005 Plan Type IO Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Finishing the unfinished 2nd flood attic. The area will be used as one room with no partition walls. Natural light shall be provided and a of Work minimum ceiling height shall be provided. A patio door will be installed. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $4,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $38.00 Park Dedication $0.00 Date 01/20/2005 Final/O.P. 00/00/0000 Parcel Id # 0904890000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 337W 16TH AVE Agent/Owner OSHKOSH WI 54902 - 6801 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.