Loading...
HomeMy WebLinkAbout0109162-Building (roof)OSHKOSH ON THE WATER Job Address Designer Category Type 1381 WHEATFIELD WAY 141 - Exterior Remodeling CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner WILLIAM SRVENDY HUBBARD Contractor OWNER _~._Building ~_) S!g? __ No 109162 Create Date 07/07/2004 Plan Canopy (~ Fence (~ Raze zoaing Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication Use/Nature of Work 0 Sq. Ft, 0 Sq, Ft. _ ~0 Sq. Ft. 0 Poured Concrete 0 Floating Slab 0 Pier 0 Other (~) Concrete Block (~ Post 0 Treated Wood Not R~e?!_r~.. Flood Plain __ # Dwelling Units 0 Class of Const: Size Rooms 0 Height 0 Ft. [] Projection Bedrooms 0 Stories Canopies Baths 0 Signs Height Permit # Structures 0 ~.d-d ,i:i~y~r e( r0ofin~ to the existing single layer roofing on house & garage due to hail damage.* NO STRUCTURAL WORK. Work ¢~o be done by Bill Jolin HVAC Contractor Electric Contractor Fees: Valuation Issued By: ~' Plumbing Contractor .~$_3_,_0.?0:0~0 Plan Approval $0.00 Permit Fee Paid [] Permit Voided $32.00 Park Dedication $0.00 Date 07/07/2004 FinallO.P. 00/00/0000 Parcelld # 1341070000 In the performance of this work I agree to per[orm all work pursuant to rules governing the described construction, While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement h°lder(s) and t° sequ re a nY n~cess'~qCY aP[:C~ls bf~'orgCtarfing s'a/'~ activity' bD~rt e~__~///~ Signature - ~LLD W~A Agent/Owner Address 1381 WHEATFI Y OSHKOSH WI 54904 - 7421 Telephone Num To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.