HomeMy WebLinkAbout0109162-Building (roof)OSHKOSH
ON THE WATER
Job Address
Designer
Category
Type
1381 WHEATFIELD WAY
141 - Exterior Remodeling
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner WILLIAM SRVENDY HUBBARD
Contractor OWNER
_~._Building ~_) S!g? __
No 109162
Create Date 07/07/2004
Plan
Canopy (~ Fence (~ Raze
zoaing
Unfinished/Basement
Finished/Living
Garage
Foundation
Occupancy Permit
Park Dedication
Use/Nature
of Work
0 Sq. Ft,
0 Sq, Ft.
_ ~0 Sq. Ft.
0 Poured Concrete 0 Floating Slab 0 Pier 0 Other
(~) Concrete Block (~ Post 0 Treated Wood
Not R~e?!_r~.. Flood Plain __
# Dwelling Units 0
Class of Const: Size
Rooms 0 Height 0 Ft. [] Projection
Bedrooms 0 Stories Canopies
Baths 0 Signs
Height Permit
# Structures 0
~.d-d ,i:i~y~r e( r0ofin~ to the existing single layer roofing on house & garage due to hail damage.* NO STRUCTURAL WORK. Work
¢~o be done by Bill Jolin
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: ~'
Plumbing Contractor
.~$_3_,_0.?0:0~0 Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided
$32.00 Park Dedication $0.00
Date 07/07/2004 FinallO.P. 00/00/0000
Parcelld # 1341070000
In the performance of this work I agree to per[orm all work pursuant to rules governing the described construction,
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
h°lder(s) and t° sequ re a nY n~cess'~qCY aP[:C~ls bf~'orgCtarfing s'a/'~ activity' bD~rt e~__~///~
Signature
- ~LLD W~A Agent/Owner
Address 1381 WHEATFI Y OSHKOSH WI 54904 - 7421 Telephone Num
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.