HomeMy WebLinkAbout0109320-Building (window)OSHKOSH
ON THE WATER
Job Address 1607 N MAiN ST
Designer
Category
Type
Zoning
CITY OF OSHKOSH No 109320
BUILDING PERMIT - APPLICATION AND RECORD
Owner THOMAS G PUTZER Create Date 07/14/2004
Contractor OWNER
141 - Exterior Remodeling Plan
· Building (~) Sign O Canopy (~ Fence O Raze
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. Ft.
Garage 0 Sq. Ft.
Foundation (~ Poured Concrete O Floating Slab
0 Concrete Block (~ Post
Occupancy Permit Not Required
Park Dedication
Class of Const: Size
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
(~) Pier · Other
(~) Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures
[] Projection [
Canopies
Signs
0
0
0
Use/Nature {ES/Remove a rear exit door, install a double hung window in this opening.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ._~
$400.00 Plan Approval
$0.00 Permit Fee Paid
[] Permit VoidedI
$20.00 Park Dedication $0.00
Date 07/14/2004 Final/O.P. 00/00/0000
Parcel Id # 1502580000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has~uthority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit epCn within an ea~g~n~..,Che City strongly urges the permit applicant to contact the easement
holder(s) and to sec,~ure~C'necessary app_6o~e~e~f'e starting such activity. ~ ~
~,,/~,,~, ~, ~,/-,~.,~ v Agent/Owner
AddCess 628 CEAPE AVE ~ OSHKOSH WI 54901 - 5211 Telephone Number ~'~--~.~ ~'~'~
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.