Loading...
HomeMy WebLinkAbout0109385-Building (roof)OSHKOSH ON THE WATER ,Job Address 326 W 9TH AVE Designer Category Type Zoning 141 - Exterior Remodelin9 ~ Building (~) Sign Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete 0 Floating Slab (~) Pier O Other O Concrete Block O Post O Treated Wood Occupancy Permit Not Required Flood Plain No Park Dedication Not Required # Dwelling Units 0 ,/ CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner ROBERT BRUEGMANN Create Date Contractor IMPRESSIVE ROOFING AND SIDING INC Plan O Fence O Raze 0 Ft. NO 109385 Size ~] Projection J Canopies Signs 07/19/2004 Height Permit Not Required # Structures 0 Use/Nature SFR/Tear-off roofing, install new sheathing, felt, flashing, vents, and shingles on HOUSE ONLY of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: $5,951.47 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid [] Permit VoidedJ $50.00 Park Dedication $0.00 Date 07/19/2004 Final/O.P. 00/00/0000 Parcelld # 0903140000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 2786 APPLETON WI 54912 - 2786 Telephone Number 232-1669 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.