HomeMy WebLinkAbout2004-Building (windows)OSHKOSH
ON THE WATER
,Job Address 1218 LIBERTY ST
Designer
Category
Type
Zoning
141 - Exterior Remodeling
CITY OF OSHKOSH No '1'11045
BUILDING PERMIT - APPLICATION AND RECORD
Owner SETH A I MCDONALD/JESSICA S H Create Date 10/12/2004
Contractor SEARS HOME IMPROVEMENTS
· Building O Sign O Canopy (~ Fence (~) Raze
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. Ft.
Garage 0 Sq. Ft.
Foundation · Poured Concrete (~ Floating Slab
(~) Concrete Block (~ Post
Occupancy Permit
Park Dedication
Plan
Class of Const:
Rooms 0 Height
Bedrooms 0 Stories
Baths 0
(~ Pier O Other
(~ Treated Wood
Flood Plain
# Dwelling Units 0
0 Ft.
Size
[] Projection
Canopies
Signs
Height Permit
# Structures 0
Use/Nature SFR / REPLACE 5 WINDOWS SAME SIZE SAME LOCATION, NO STRUCTURAL CHANGES
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation $5,000.00
Issued By: ~ ~_~
Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided ~
Plumbing Contractor
$44.00 Park Dedication $0.00
Date 10/12/2004 FinallO. P. 00/00/0000
Parcel id # 1203600000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction,
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicent to contact the easement
holder(s) and to secure a~c~ry approvals ~:~re starting such activity.
Signature ~/~--~--- ~._~_----. Date //'~ -/~-
~ Agent/Owner
Address 13040 W LISBON RD BROOKFIELD WI 53005 - 0000 Telephone Number 630-832-4049
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.