Loading...
HomeMy WebLinkAbout0111098-Building (roof)OSHKOSH ON THE WATER ,Job Address 1201 WAUGOO AVE CITY OF OSHKOSH No t1'1098 BUILDING PERMIT - APPLICATION AND RECORD Owner EDSEL M F LABILLOIS/LISA M STE Create Date 10/13/2004 Designer Contractor OWNER Category 141 - Exterior Remodeling Type · Building (~) Sign (~ Canopy (~) Fence (~ Raze Plan Zoning Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation · Poured Concrete (~ Floating Slab (~ Concrete Block (~ Post Occupancy Permit Park Dedication Class of Const: Rooms 0 Height Bedrooms 0 Stories Baths 0 C) Pier (~ Other C) Treated Wood Flood Plain # Dwelling Units 0 0 Ft. Size [] Projection Canopies Signs Height Permit # Structures 0 Use/Nature SFPJ TEAR OFF & REPLACE EXISTING ROOFING ON GARAGE, NO STRUCTURAL CHANGES of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: ./~ /_. ~ $1,500.00 Plan Approval $0.00 Permit Fee Paid [] Permit Voided ~ Plumbing Contractor $26.00 Park Dedication $0.00 Date 10/13/2004 Finat/O.P. 00/00/0000 Parcel Id # 0204830000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restri~ions of which it is not a party, if you perform the work described in this permit ~)~plicetion within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure/'c~y necessary approvals before starting such activity. Signature ~ ~ Date /~/~¢ Agent/Owner Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.