HomeMy WebLinkAbout24-15 CO 1 (FINAL)_11-16-25TO: ADVANCE CONSTRUCTION CHANGE ORDER #1 (FINAL)
2141 WOODALE AVE
GREEN BAY, WI 54241
Your present contract with the City of Oshkosh, Contract No. 24-15, awarded December 12, 2023, is hereby amended
and changed as follows:
NET DECREASE TO SECTION I: ($312,121.21)
NET INCREASE TO ADDITIONAL WORK:$124,760.50
NET DECREASE TO CONTRACT ($187,360.71)
SECTION I TOTALS
BID TOTAL $6,342,602.42 $6,342,602.42
CO #1 ($187,360.71)($187,360.71)
CONTRACT TOTAL $6,155,241.71 $6,155,241.71
CITY OF OSHKOSH
BY:
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Approved as to form:
City Attorney
DATE: NOVEMBER 18, 2025
______________________________
Comptroller
______________________________
Contractor
______________________________
Approved and accepted:
______________________________
City Manager
City Clerk
______________________________
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B
Contract 24-15 Change Order #1 (Final)
24-15
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1011
Clearing; complete as
specified
Inch
Diameter 92.00 92.00 $50.00
1012
Limbing existing trees;
complete as specified Each 1.00 1.00 $2,200.00
1021
Grubbing; complete as
specified
Inch
Diameter 92.00 92.00 $30.00
1050
Mobilization; complete as
specified
Lump
Sum 1.00 1.00 $299,450.00
1100
Removing pavement;
complete as specified
Square
Yards 8,200.00 10,942.85 2,742.85 $5.50 $15,085.68
1110
Removing curb and gutter;
complete as specified
Linear
Feet 24.00 24.00 $12.00
1120
Removing concrete and
asphalt sidewalk and
driveway; complete as
specified
Square
Feet 34,500.00 34,411.58 -88.42 $1.00 ($88.42)
1200
Unclassified excavation;
complete as specified
Cubic
Yards 3,500.00 3,401.50 -98.50 $12.50 ($1,231.25)
1220
Excavation special (paving);
complete as specified Tons 520.00 0.00 -520.00 $14.50 ($7,540.00)
1301
7" concrete pavement; with
5" CABC and grading;
complete as specified
Square
Yards 8,800.00 9,263.85 463.85 $50.37 $23,364.12
1303
7" concrete pavement HES;
with 5" CABC and grading;
complete as specified
Square
Yards 2,000.00 1,080.08 -919.92 $54.37 ($50,016.05)
1334
Concrete pavement gaps;
complete as specified Each 2.00 1.00 -1.00 $1,000.00 ($1,000.00)
1340
Crushed aggregate base
course; complete as
specified Tons 1,370.00 88.33 -1,281.67 $13.25 ($16,982.13)
1350
Pavement ties; complete as
specified Each 40.00 24.00 -16.00 $10.00 ($160.00)
1352
Drilled dowel bars; 1";
complete as specified Each 175.00 127.00 -48.00 $16.50 ($792.00)
1360
Adjust manholes and inlets;
complete as specified Each 88.00 89.00 1.00 $450.00 $450.00
1370
Turf restoration; complete as
specified
Square
Yards 5,900.00 6,285.07 385.07 $7.70 $2,965.04
1372
Restore gravel driveway/
apron; complete as specified
Square
Yards 75.00 60.92 -14.08 $6.00 ($84.48)
1380
Cold weather covering
(concrete pavement) - single
visquine; complete as
specified
Square
Yards 1,610.00 0.00 -1,610.00 $0.01 ($16.10)
Page 2 of 14
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B
Contract 24-15 Change Order #1 (Final)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1382
Cold weather covering
(concrete pavement) -
double visquine; complete
as specified
Square
Yards 1,610.00 0.00 -1,610.00 $0.01 ($16.10)
1390
Up-charge for late season
cold weather concrete
pavement; complete as
specified
Cubic
Yards 315.00 0.00 -315.00 $0.01 ($3.15)
1410
12" radius curb with 6"
CABC and grading;
complete as specified
Linear
Feet 610.00 526.70 -83.30 $16.50 ($1,374.45)
1440
30" curb and gutter; 7"; with
5" CABC and grading;
complete as specified
Linear
Feet 110.00 6.00 -104.00 $53.50 ($5,564.00)
1460
Sidewalk curb; complete as
specified
Linear
Feet 320.00 169.24 -150.76 $35.00 ($5,276.60)
1500
4" concrete sidewalk with 3"
CABC and grading;
complete as specified
Square
Feet 19,600.00 19,660.44 60.44 $6.25 $377.75
1510
6" concrete
sidewalk/driveway/ ramp
with 3" CABC and grading;
complete as specified
Square
Feet 13,600.00 16,575.98 2,975.98 $7.30 $21,724.65
1514
6" concrete sidewalk/
driveway/ramp (HES) with 3"
CABC and grading;
complete as specified
Square
Feet 3,700.00 465.54 -3,234.46 $7.65 ($24,743.62)
1530
6" concrete step; complete
as specified
Square
Feet 170.00 138.70 -31.30 $66.00 ($2,065.80)
1540
Curb ramp detectable
warning field (natural/non-
painted); complete as
specified
Square
Feet 390.00 340.00 -50.00 $35.00 ($1,750.00)
1550
No. 4 reinforcing rods -
deformed; epoxy-coated;
complete as specified
Linear
Feet 3,200.00 3,000.00 -200.00 $2.00 ($400.00)
1560
Drilled No. 4 sidewalk tie
bars - deformed; epoxy-
coated; complete as
specified Each 370.00 259.00 -111.00 $4.00 ($444.00)
1580
Cold weather covering
(sidewalk) - single visquine;
complete as specified
Square
Feet 4,510.00 0.00 -4,510.00 $0.01 ($45.10)
1582
Cold weather covering
(sidewalk) - double visquine;
complete as specified
Square
Feet 4,510.00 0.00 -4,510.00 $0.01 ($45.10)
1590
Up-charge for late season
cold weather concrete
sidewalk; complete as
specified
Cubic
Yards 70.00 0.00 -70.00 $0.01 ($0.70)
1600
Furnish and install tree;
complete as specified Each 3.00 2.50 -0.50 $600.00 ($300.00)
Page 3 of 14
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B
Contract 24-15 Change Order #1 (Final)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1650
Locate existing property
monuments; complete as
specified Each 55.00 33.00 -22.00 $38.21 ($840.63)
1652
Replace existing property
monuments; complete as
specified Each 55.00 22.00 -33.00 $39.13 ($1,291.29)
1700
Sawing existing pavement;
complete as specified
Linear
Feet 970.00 936.72 -33.28 $2.65 ($88.19)
1710
Sawing concrete pavement
full depth; complete as
specified
Linear
Feet 320.00 322.10 2.10 $2.65 $5.57
1900
Tack coat; complete as
specified Gallons 35.00 23.00 -12.00 $11.90 ($142.80)
1911
4" asphaltic transition LT
with 10" CABC and grading;
complete as specified
Square
Yards 400.00 390.97 -9.03 $82.95 ($749.04)
1916
4" asphaltic surface LT with
6" CABC and grading;
complete as specified
Square
Yards 70.00 106.58 36.58 $76.95 $2,814.83
1917
2" asphaltic surface LT with
6" CABC and grading;
complete as specified
Square
Yards 250.00 273.56 23.56 $49.95 $1,176.82
1918
Asphaltic cold weather
paving; complete as
specified
Square
Yards 70.00 0.00 -70.00 $0.01 ($0.70)
2003
Furnish and install 12" storm
sewer; complete as specified
Linear
Feet 700.00 729.00 29.00 $99.00 $2,871.00
2006
Furnish and install 15" storm
sewer; complete as specified
Linear
Feet 625.00 490.50 -134.50 $103.00 ($13,853.50)
2009
Furnish and install 18" storm
sewer; complete as specified
Linear
Feet 650.00 625.50 -24.50 $107.00 ($2,621.50)
2015
Furnish and install 24" storm
sewer; complete as specified
Linear
Feet 60.00 63.50 3.50 $131.00 $458.50
2021
Furnish and install 30" storm
sewer; complete as specified
Linear
Feet 10.00 0.00 -10.00 $197.00 ($1,970.00)
2024
Furnish and install 36" storm
sewer; complete as specified
Linear
Feet 40.00 34.50 -5.50 $220.00 ($1,210.00)
2045
Furnish and install 14" x 23"
HERCP Class III storm
sewer; complete as specified
Linear
Feet 20.00 0.00 -20.00 $176.50 ($3,530.00)
2088
Furnish and install 6' x 12'
box culvert storm sewer;
complete as specified
Linear
Feet 1,200.00 1,183.00 -17.00 $1,274.00 ($21,658.00)
Page 4 of 14
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B
Contract 24-15 Change Order #1 (Final)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
2115
Temporary storm sewer
bypass; complete as
specified
Lump
Sum 1.00 1.00 $225,000.00
2201
Furnish and install standard
storm sewer manhole (4'
diameter); complete as
specified
Vertical
Feet 69.00 64.72 -4.28 $688.00 ($2,944.64)
2202
Furnish and install standard
storm sewer manhole (5'
diameter); complete as
specified
Vertical
Feet 6.25 6.34 0.09 $887.00 $79.83
2203
Furnish and install standard
storm sewer manhole (6'
diameter); complete as
specified
Vertical
Feet 7.00 6.96 -0.04 $1,086.00 ($43.44)
2213
Furnish and install standard
storm sewer inlet manhole
(4' diameter); complete as
specified
Vertical
Feet 4.00 3.43 -0.57 $989.00 ($563.74)
2225A
Furnish and install storm
sewer junction chamber N-
13; complete as specified Each 1.00 1.00 $89,734.00
2225B
Furnish and install storm
sewer junction chamber O-
10; complete as specified Each 1.00 1.00 $86,000.00
2225C
Furnish and install storm
sewer junction chamber W-
10; complete as specified Each 1.00 1.00 $18,625.00
2225D
Furnish and install storm
sewer junction chamber W-
12; complete as specified Each 1.00 1.00 $89,734.00
2225E
Furniish and install storm
sewer junction chamber W-
21; complete as specified Each 1.00 1.00 $75,234.00
2225F
Furnish and install storm
sewer junction chamber O-
11 and connection; complete
as specified
Lump
Sum 1.00 1.00 $85,000.00
2227
Furnish and install standard
storm sewer manhole riser
(4' diameter); complete as
specified
Vertical
Feet 12.50 6.53 -5.97 $341.00 ($2,035.77)
2230
Furnish and install standard
storm sewer inlet manhole
riser (4' diameter); complete
as specified
Vertical
Feet 25.00 11.98 -13.02 $532.00 ($6,926.64)
2235
Furnish and install Type 1
inlet (with 18" sump);
complete as specified Each 1.00 0.00 -1.00 $3,052.00 ($3,052.00)
2237
Furnish and install Type 3
inlet (with 18" sump);
complete as specified Each 38.00 35.00 -3.00 $3,548.00 ($10,644.00)
Page 5 of 14
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B
Contract 24-15 Change Order #1 (Final)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
2400
Furnish and install 6" storm
sewer lateral; complete as
specified
Linear
Feet 1,500.00 1,312.50 -187.50 $54.00 ($10,125.00)
2402
Furnish and install 8" storm
sewer lateral; complete as
specified
Linear
Feet 50.00 38.00 -12.00 $61.00 ($732.00)
2404
Furnish and install storm
sewer marker balls;
complete as specified Each 100.00 91.00 -9.00 $50.00 ($450.00)
2406
Furnish and install storm
sewer clay dams; complete
as specified Each 24.00 16.00 -8.00 $150.00 ($1,200.00)
2408
Furnish and install storm
sewer lateral inlet; complete
as specified Each 36.00 34.00 -2.00 $1,275.00 ($2,550.00)
2414
Storm lateral inlet
adjustments; complete as
specified Each 36.00 4.00 -32.00 $50.00 ($1,600.00)
2508
Furnish; install; maintain;
and remove Type D modified
inlet protection; complete as
specified Each 100.00 28.00 -72.00 $120.00 ($8,640.00)
2510
Sediment removal - Type D
modified inlet protection;
complete as specified Each 100.00 28.00 -72.00 $8.00 ($576.00)
2512
Furnish; install; maintain;
and remove stone tracking
pad; complete as specified Each 4.00 0.00 -4.00 $1,200.00 ($4,800.00)
2516
Furnish; install; maintain;
and remove stone bag;
complete as specified Each 100.00 0.00 -100.00 $10.00 ($1,000.00)
2518
Furnish; install; maintain;
and remove 12" diameter
sediment logs; complete as
specified
Linear
Feet 200.00 0.00 -200.00 $8.00 ($1,600.00)
2524
Furnish; install; maintain;
and remove dewatering tank
system; complete as
specified Each 4.00 0.00 -4.00 $2,000.00 ($8,000.00)
2800
Abandon 8" - 12" storm
sewer; complete as specified
Linear
Feet 200.00 162.90 -37.10 $5.00 ($185.50)
2804
Remove 30" and smaller
storm sewer; complete as
specified
Linear
Feet 2,500.00 1,734.20 -765.80 $33.00 ($25,271.40)
2808
Remove 66" and larger
storm sewer; complete as
specified
Linear
Feet 1,300.00 1,260.80 -39.20 $38.00 ($1,489.60)
2810
Abandon storm sewer
manholes and inlets;
complete as specified Each 15.00 8.00 -7.00 $700.00 ($4,900.00)
Page 6 of 14
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B
Contract 24-15 Change Order #1 (Final)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
2812
Remove storm sewer
manholes and inlets;
complete as specified Each 35.00 37.00 2.00 $700.00 $1,400.00
2850
Connect to existing storm
sewer main; complete as
specified Each 10.00 9.00 -1.00 $2,750.00 ($2,750.00)
2852
Connect to existing storm
sewer lateral; complete as
specified Each 15.00 10.00 -5.00 $50.00 ($250.00)
2856
Connect to existing storm
sewer manhole; complete as
specified Each 1.00 0.00 -1.00 $1,500.00 ($1,500.00)
2858
Connect to existing storm
sewer inlet; complete as
specified Each 1.00 0.00 -1.00 $1,000.00 ($1,000.00)
2914
Storm sewer utility line
opening (ULO); complete as
specified Each 5.00 2.00 -3.00 $750.00 ($2,250.00)
2950
Excavation special (storm);
complete as specified Tons 500.00 0.00 -500.00 $14.50 ($7,250.00)
2952
Bentonite slurry dam (storm);
complete as specified Each 35.00 30.00 -5.00 $1,000.00 ($5,000.00)
3000
Furnish and install 8"
sanitary sewer (relay);
complete as specified
Linear
Feet 290.00 236.50 -53.50 $204.00 ($10,914.00)
3002
Furnish and install 10"
sanitary sewer (relay);
complete as specified
Linear
Feet 970.00 957.50 -12.50 $170.00 ($2,125.00)
3006
Furnish and install 15"
sanitary sewer (relay);
complete as specified
Linear
Feet 660.00 657.50 -2.50 $195.00 ($487.50)
3060
Furnish and install 8"
sanitary sewer drop;
complete as specified
Vertical
Feet 12.50 12.10 -0.40 $459.00 ($183.60)
3100
Furnish and install standard
sanitary sewer manhole (4'
diameter); complete as
specified
Vertical
Feet 167.00 164.39 -2.61 $459.00 ($1,197.99)
3114
Furnish and install sanitary
sewer external manhole
chimney seal; complete as
specified Each 15.00 18.00 3.00 $550.00 $1,650.00
3116
Furnish and install sanitary
sewer external manhole
chimney seal extension;
complete as specified Each 2.00 0.00 -2.00 $500.00 ($1,000.00)
3202
Furnish and install 10" x 4"
sanitary sewer factory wyes
or tees; complete as
specified Each 1.00 1.00 $245.00
Page 7 of 14
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B
Contract 24-15 Change Order #1 (Final)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
3206
Furnish and install 15" x 4"
sanitary sewer factory wyes
or tees; complete as
specified Each 2.00 1.00 -1.00 $561.00 ($561.00)
3210
Furnish and install 8" x 6"
sanitary sewer factory wyes
or tees; complete as
specified Each 5.00 5.00 $146.00
3212
Furnish and install 10" x 6"
sanitary sewer factory wyes
or tees; complete as
specified Each 22.00 22.00 $275.00
3216
Furnish and install 15" x 6"
sanitary sewer factory wyes
or tees; complete as
specified Each 20.00 19.00 -1.00 $687.00 ($687.00)
3230
Furnish and install 4"
sanitary sewer laterals
(new); complete as specified
Linear
Feet 110.00 35.00 -75.00 $119.00 ($8,925.00)
3231
Furnish and install 4"
sanitary sewer riser (new);
complete as specified
Linear
Feet 15.00 6.50 -8.50 $119.00 ($1,011.50)
3234
Furnish and install 4"/6"
sanitary sewer lateral (relay);
complete as specified
Linear
Feet 1,660.00 1,586.00 -74.00 $123.00 ($9,102.00)
3235
Furnish and install 4"/6"
sanitary sewer riser (relay);
complete as specified
Linear
Feet 202.00 103.80 -98.20 $123.00 ($12,078.60)
3236
Furnish and install sanitary
sewer lateral marker balls;
complete as specified Each 97.00 101.00 4.00 $50.00 $200.00
3238
Furnish and install clay
dams; complete as specified Each 25.00 18.00 -7.00 $150.00 ($1,050.00)
3300
Furnish and install
connection to existing 8"
sanitary sewer mains;
complete as specified Each 5.00 5.00 $1,000.00
3302
Furnish and install
connection to existing 10"
sanitary sewer mains;
complete as specified Each 1.00 1.00 $1,200.00
3306
Furnish and install
connection to existing 15"
sanitary sewer mains;
complete as specified Each 2.00 1.00 -1.00 $1,000.00 ($1,000.00)
3330
Furnish and install sanitary
sewer concrete collars;
complete as specified Each 3.00 0.00 -3.00 $500.00 ($1,500.00)
3332
Core into existing manhole;
complete as specified Each 1.00 1.00 $2,000.00
Page 8 of 14
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B
Contract 24-15 Change Order #1 (Final)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
3404
Furnish and install 10"
sanitary sewer open cut
casing pipes; complete as
specified
Linear
Feet 240.00 200.00 -40.00 $67.00 ($2,680.00)
3410
Furnish and install 18"
sanitary sewer open cut
casing pipes; complete as
specified
Linear
Feet 20.00 25.00 5.00 $127.00 $635.00
3600
Rock excavation; complete
as specified
Cubic
Yards 25.00 0.00 -25.00 $150.00 ($3,750.00)
3700
Closed circuit televising;
complete as specified
Linear
Feet 1,920.00 1,851.50 -68.50 $2.75 ($188.38)
3710
Closed circuit televising -
using push camera;
complete as specified Each 4.00 0.00 -4.00 $250.00 ($1,000.00)
3800
Abandon sanitary sewer
manholes; complete as
specified Each 2.00 2.00 $500.00
3802
Abandon 8" sanitary sewer;
complete as specified
Linear
Feet 28.00 28.00 $5.00
3804
Abandon 10" sanitary sewer;
complete as specified
Linear
Feet 563.00 563.00 $2.00
3818
Abandon 30" sanitary sewer;
complete as specified
Linear
Feet 571.00 407.00 -164.00 $32.00 ($5,248.00)
3852
Remove sanitary sewer
manholes; complete as
specified Each 3.00 4.00 1.00 $500.00 $500.00
3854
Remove sanitary sewer;
complete as specified
Linear
Feet 211.00 282.00 71.00 $39.00 $2,769.00
3890
Sanitary sewer utility line
opening (ULO); complete as
specified Each 2.00 1.00 -1.00 $800.00 ($800.00)
3892
Excavation special
(sanitary); complete as
specified Tons 60.00 0.00 -60.00 $14.50 ($870.00)
3894
Bentonite slurry dam
(sanitary); complete as
specified Each 28.00 30.00 2.00 $1,400.00 $2,800.00
4000
Furnish and install 4" ductile
iron water main (relay) with
polywrap; complete as
specified
Linear
Feet 2.00 1.00 -1.00 $200.00 ($200.00)
4002
Furnish and install 6" ductile
iron water main (relay) with
polywrap; complete as
specified
Linear
Feet 250.00 231.00 -19.00 $106.00 ($2,014.00)
4004
Furnish and install 8" ductile
iron water main (relay) with
polywrap; complete as
specified
Linear
Feet 2,040.00 2,012.00 -28.00 $155.00 ($4,340.00)
Page 9 of 14
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B
Contract 24-15 Change Order #1 (Final)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
4006
Furnish and install 10"
ductile iron water main
(relay) with polywrap;
complete as specified
Linear
Feet 150.00 142.50 -7.50 $258.00 ($1,935.00)
4008
Furnish and install 12"
ductile iron wtaer main
(relay) with polywrap;
complete as specified
Linear
Feet 600.00 507.00 -93.00 $178.00 ($16,554.00)
4036
Furnish and install 1" water
service (relay); complete as
specified
Linear
Feet 1,453.00 1,509.00 56.00 $90.00 $5,040.00
4042
Furnish and install 1" water
service (new); complete as
specified
Linear
Feet 125.00 47.00 -78.00 $90.00 ($7,020.00)
4048
Furnish and install 1"
corporation and stop box;
complete as specified Each 44.00 43.00 -1.00 $669.00 ($669.00)
4055
Furnish and install water
service clay dams; complete
as specified Each 23.00 20.00 -3.00 $150.00 ($450.00)
4056
Furnish and install
connections to existing 4"
water main; complete as
specified Each 1.00 1.00 $2,207.00
4058
Furnish and install
connections to existing 6"
water main; complete as
specified Each 4.00 6.00 2.00 $2,288.00 $4,576.00
4060
Furnish and install
connections to existing 8"
water main; complete as
specified Each 5.00 4.00 -1.00 $2,870.00 ($2,870.00)
4062
Furnish and install
connections to existing 10"
water main; complete as
specified Each 1.00 1.00 $3,116.00
4064
Furnish and install
connections to existing 12"
water main; complete as
specified Each 1.00 1.00 $3,727.00
4101
Furnish and install 6" x 6"
water main tee; complete as
specified Each 1.00 1.00 $514.00
4110
Furnish and install 8" x 6"
water main tee; complete as
specified Each 6.00 5.00 -1.00 $677.00 ($677.00)
4111
Furnish and install 8" x 8"
water main tee; complete as
specified Each 4.00 4.00 $785.00
4119
Furnish and install 10" x 6"
water main tee; complete as
specified Each 1.00 1.00 $975.00
Page 10 of 14
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B
Contract 24-15 Change Order #1 (Final)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
4190
Furnish and install 8" x 10"
water main cross; complete
as specified Each 1.00 1.00 $1,272.00
4191
Furnish and install 8" x 12"
water main cross; complete
as specified Each 1.00 1.00 $1,337.00
4197
Furnish and install 10" x 12"
water main cross; complete
as specified Each 1.00 1.00 $1,707.00
4229
Furnish and install 10" 22 1/2
degree water main bend;
complete as specified Each 2.00 2.00 $652.00
4235
Furnish and install 4" 45
degree water main bend;
complete as specified Each 2.00 0.00 -2.00 $225.00 ($450.00)
4236
Furnish and install 6" 45
degree water main bend;
complete as specified Each 28.00 17.00 -11.00 $318.00 ($3,498.00)
4237
Furnish and install 8" 45
degree water main bend;
complete as specified Each 8.00 11.00 3.00 $416.00 $1,248.00
4238
Furnish and install 10" 45
degree water main bend;
complete as specified Each 4.00 4.00 $662.00
4239
Furnish and install 12" 45
degree water main bend;
complete as specified Each 8.00 8.00 $889.00
4262
Furnish and install 6" x 4"
water main reducer;
complete as specified Each 1.00 1.00 $250.00
4264
Furnish and install 8" x 6"
water main reducer;
complete as specified Each 2.00 3.00 1.00 $359.00 $359.00
4266
Furnish and install 10" x 6"
water main reducer;
complete as specified Each 3.00 3.00 $486.00
4270
Furnish and install 12" x 8"
water main reducer;
complete as specified Each 1.00 1.00 $209.00
4309
Furnish and install 8" water
main plug; complete as
specified Each 1.00 1.00 $2,159.00
4350
Cut and cap existing 4"
water main; complete as
specified Each 1.00 0.00 -1.00 $156.00 ($156.00)
4352
Cut and cap existing 6"
water main; complete as
specified Each 2.00 2.00 $208.00
4354
Cut and cap existing 8"
water main; complete as
specified Each 2.00 1.00 -1.00 $327.00 ($327.00)
Page 11 of 14
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B
Contract 24-15 Change Order #1 (Final)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
4356
Cut and cap existing 10"
water main; complete as
specified Each 2.00 1.00 -1.00 $421.00 ($421.00)
4358
Cut and cap existing 12"
water main; complete as
specified Each 2.00 1.00 -1.00 $1,500.00 ($1,500.00)
4400
Furnish and install 4" water
main gate valve; complete
as specified Each 1.00 0.00 -1.00 $1,517.00 ($1,517.00)
4401
Furnish and install 6" water
main gate valve; complete
as specified Each 10.00 6.00 -4.00 $1,792.00 ($7,168.00)
4402
Furnish and install 8" water
main gate valve; complete
as specified Each 25.00 26.00 1.00 $2,500.00 $2,500.00
4403
Furnish and install 10" water
main gate valve; complete
as specified Each 6.00 6.00 $3,639.00
4404
Furnish and install 12" water
main gate valve; complete
as specified Each 5.00 4.00 -1.00 $4,397.00 ($4,397.00)
4500
Furnish and install hydrant;
complete as specified Each 7.00 7.00 $5,845.00
4712
Furnish and install 2" water
main casing pipe; complete
as specified
Linear
Feet 200.00 180.00 -20.00 $8.00 ($160.00)
4726
Furnish and install 18" water
main casing pipe; complete
as specified
Linear
Feet 60.00 60.00 $129.00
4730
Furnish and install 24" water
main casing pipe; complete
as specified
Linear
Feet 50.00 50.00 $149.00
4800
Rock excavation; complete
as specified
Cubic
Yards 20.00 0.00 -20.00 $100.00 ($2,000.00)
4900
Abandon water main on
STREET NAME; complete
as specified
Lump
Sum 1.00 1.00 $2,500.00
4902
Abandon water main on
STREET NAME; complete
as specified
Lump
Sum 1.00 1.00 $2,500.00
4904
Abandon water main on
STREET NAME; complete
as specified
Lump
Sum 1.00 1.00 $2,500.00
4906
Abandon water main on
Michigan Street; complete
as specified
Lump
Sum 1.00 1.00 $2,500.00
4920
Remove water main;
complete as specified
Linear
Feet 631.00 741.50 110.50 $30.00 $3,315.00
4990
Excavation special (water);
complete as specified Tons 40.00 0.00 -40.00 $14.50 ($580.00)
Page 12 of 14
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B
Contract 24-15 Change Order #1 (Final)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
4992
Bentonite slurry dam (water);
complete as specified Each 25.00 27.00 2.00 $1,000.00 $2,000.00
SECTION I (BID ITEMS 1011 - 4992) - SUBTOTAL: $100,365.79 ($412,487.00)
NET DECREASE TO SECTION I: ($312,121.21)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1-2802
Abandon 15" and larger
storm sewer; complete as
specified
Linear
Feet 0.00 0.00 $40.00
1-3806
Abandon 12" sanitary
sewer; complete as specified
Linear
Feet 0.00 238.00 238.00 $28.00 $6,664.00
1-10000
Remobilize and remove tree
at 357 Iowa Street; complete
as specified
Lump
Sum 0.00 1.00 1.00 $3,388.00 $3,388.00
1-10001
Profile sawcut @ 458
Michigan Street; complete
as specified
Lump
Sum 0.00 1.00 1.00 $1,500.00 $1,500.00
1-20000
Modify base and walls on
junction chamber N-13;
complete as specified
Lump
Sum 0.00 1.00 1.00 $7,300.00 $7,300.00
1-20001
Abandon 30" storm sewer;
complete as specified
Linear
Feet 0.00 731.20 731.20 $40.00 $29,248.00
1-20002
Install gel curtain and pump
down box; complete as
specified
Lump
Sum 0.00 1.00 1.00 $56,317.00 $56,317.00
1-20003
Excavate, modify and
backfill structure W-10;
complete as specified
Lump
Sum 0.00 1.00 1.00 $5,100.00 $5,100.00
1-30000
Repair sanitary main drop
tee at Michigan & 6th;
complete as specified
Lump
Sum 0.00 1.00 1.00 $6,141.50 $6,141.50
1-40000
Over excavate trench due to
poor soils with additionals
stone bedding 12"; complete
as specified
Linear
Feet 0.00 125.00 125.00 $8.00 $1,000.00
1-40001
Over excavate trench due to
poor soils with additionals
stone bedding 24"; complete
as specified
Linear
Feet 0.00 347.00 347.00 $16.00 $5,552.00
ADDITIONAL WORK REQUIRED: FUTURE CO #1
Page 13 of 14
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B
Contract 24-15 Change Order #1 (Final)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1-40002
Over excavate trench due to
poor soils with additionals
stone bedding 30"; complete
as specified
Linear
Feet 0.00 127.50 127.50 $20.00 $2,550.00
$124,760.50 $0.00
$124,760.50
($312,121.21)
$124,760.50
NET DECREASE TO CONTRACT: ($187,360.71)
ADDITIONAL WORK (ITEMS 1-2802 - 1-40002) SUBTOTAL:
NET INCREASE:
NET INCREASE TO ADDITIONAL WORK:
NET DECREASE TO SECTION I:
Page 14 of 14
Docusign Envelope ID: 4B78F7F1-5005-4BEB-8102-6B5F2876000B