Loading...
HomeMy WebLinkAbout0111197-Building (windows)OSHKOSH ON THE WATER Job Address 1337 OTTER AVE Designer Category 141 - Exterior Remodeling CITY OF OSHKOSH No 111197 BUILDING PERMIT - APPLICATION AND RECORD Owner JAMES A/RAE L DRIESSEN ETAL Create Date 10/20/2004 Contractor Type · Building (~) Sign ~) Canopy Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Finished/Living 0 Sq. Ft. Bedrooms 0 Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete (~ Floating Slab (~ Pier (~ Concrete Block (~ Post O Treated Wood Occupancy Permit Flood Plain Park Dedication # Dwelling Units DRIESSEN CARPENTRY Fence (~ Raze Plan Height Stories O Other 0 Ft. Size [] Projection Canopies Signs Height Permit 0 # Structures 0 Use/Nature 3FR, RENTAL / REPLACE 10 WINDOW UNITS, SAME SIZE SAME LOCATION, NO STRUCTURAL CHANGES of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: $1,500.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid [] Permit Voided $26.00 Park Dedication $0.00 Date 10/20/2004 Final/O.P. 00/00/0000 Parcelld # 0802930000 In the performance of this work I agree to perform all work pursuant to rules goveming the described censtru~on. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement Signatureh°lder(s) and to secu?.~a~y necessary approvals before starting such activity. /~--~ ~"¢¢'~'-- Date ·~/~/~/~ ~ ~0~70 C Ty R~/OA Agent/Owner Address OUN D K OSHKOSH WI 54904 - 0000 Telephone Number (920) 23%7145 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.