HomeMy WebLinkAbout0111198-Building (windows)OSHKOSH
ON THE WATER
Job Address 433 W 10TH AVE
Designer
Category 141 - Exterior Remodeling
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner JAMES A/RAE L DRIESSEN JR
Contmctor DRIESSEN CARPENTRY
Type · Building (~ Sign (~ Canopy
Zoning Class of Const:
Unfinished/Basement 0 Sq. Ft. Rooms 0
Finished/Living 0 Sq. Ft. Bedrooms 0
Garage 0 Sq. Ft. Baths 0
Foundation · Poured Concrete (~ Floating Slab O Pier
(~ Concrete Block (~) Post (~ Treated Wood
Occupancy Permit Flood Plain __
Park Dedication # Dwelling Units
Fence O Raze
No 111198
Create Date 10/20/2004
Plan
Height 0 Ft.
Stories
Other
Size
[] Projection I
Canopies 0
Signs 0
Height Permit
# Structures
Use/Nature 3FR, RENTAL / REPLACE 16 WINDOW UNITS, SAME SIZE, SAME LOCATION, NO STRUCTURAL CHANGES
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
$2,300.00 Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid
[] Permit Voided J
$32.00 Park Dedication $0.00
Date 10/20/2004 FinallO.P. 00/00/0000
Parcel Id # 0906370000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to se~7.ut~ny necessary approvals before star~ing such activity. /~/ ~-~-Z~- /~ //~/~/
Signature /~'~ Date
&'"' AgentJOwner ¢/ /
Address 5070 COUNTY ROAD K OSHKOSH WI 54904 - 0000 Telephone Number (920) 231-7145
To schedule inspections please call the Inspection Request line at 236-5f28 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless speCified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.