Loading...
HomeMy WebLinkAbout0111198-Building (windows)OSHKOSH ON THE WATER Job Address 433 W 10TH AVE Designer Category 141 - Exterior Remodeling CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner JAMES A/RAE L DRIESSEN JR Contmctor DRIESSEN CARPENTRY Type · Building (~ Sign (~ Canopy Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Finished/Living 0 Sq. Ft. Bedrooms 0 Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete (~ Floating Slab O Pier (~ Concrete Block (~) Post (~ Treated Wood Occupancy Permit Flood Plain __ Park Dedication # Dwelling Units Fence O Raze No 111198 Create Date 10/20/2004 Plan Height 0 Ft. Stories Other Size [] Projection I Canopies 0 Signs 0 Height Permit # Structures Use/Nature 3FR, RENTAL / REPLACE 16 WINDOW UNITS, SAME SIZE, SAME LOCATION, NO STRUCTURAL CHANGES of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: $2,300.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid [] Permit Voided J $32.00 Park Dedication $0.00 Date 10/20/2004 FinallO.P. 00/00/0000 Parcel Id # 0906370000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to se~7.ut~ny necessary approvals before star~ing such activity. /~/ ~-~-Z~- /~ //~/~/ Signature /~'~ Date  &'"' AgentJOwner ¢/ / Address 5070 COUNTY ROAD K OSHKOSH WI 54904 - 0000 Telephone Number (920) 231-7145 To schedule inspections please call the Inspection Request line at 236-5f28 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless speCified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.