Loading...
HomeMy WebLinkAbout0111205-Building (windows)OSHKOSH ON THE WATER ,lob Address 2353 COMET ST Designer Category 141 - Exterior Remodeling CITY OF OSHKOSH No 111205 BUILDING PERMIT - APPLICATION AND RECORD Owner DEANNE BRENNAND Create Date 10/20/2004 Contractor OWNER Type · Building (~) Sign © Canopy (~ Fence 0 Raze Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 · Poured Concrete (~) Floating Slab (~) Pier (~ Other (~) Concrete Block (~) Post (~) Treated Wood Flood Plain # Dwelling Units 0 Foundation Occupancy Permit Park Dedication Plan 0 Ft. Height Permit # Structures Size [] ProjectionI Canopies 0 Signs 0 0 Use/Nature ~FR, RENTAL / JAMES BORCHARDT CONSTRUCTION REPLACED 11 WINDOWS WITHOUT A PERMIT, SAME SIZE SAME of Work .OCATION, NO STRUCTURAL CHANGES HVAC Contractor Electric Contractor Fees: Valuation Issued By: $2,510.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid [] Permit VoidedI $32.00 Park Dedication $0.00 Date 10/20/2004 Final/O.P. 00/00/0000 Parcelld # 1518120000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) ar~'d~ s~e,c~m~ any necessary app~ls before starting such activity, j Signaturel_.~.[~ /~d~.~0~_.. ~_~/~_q~ ,~ Date / AgentJOwner .,~ ¢~ Address Oshkosh WI 54901 - 0000 Telephone Numbs, ~ ~ To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.