HomeMy WebLinkAbout0111204-Building (windows)OSHKOSH
ON THE WATER
Job Address 421 W 15TH AVE
Designer
Category
Type
Zoning
141 - Exterior Remodeling
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner PATRICK J/DEANN BRENNAND
Contractor OWNER
· Building (~ Sign C) canopy (~ Fence (~ Raze
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. Ft.
Garage 0 Sq. Ft.
Foundation · Poured Concrete (~ Floating Slab
(~ Concrete Block (~ Post
Occupancy Permit
Park Dedication
No 111204
Create Date 10/20/2004
Class of Coast:
Rooms 0
Bedrooms 0
Baths 0
C) Pier
(~ Treated Wood
Flood Plain
# Dwelling Units
Height 0 Ft.
Stories
Other
Plan
Size
[] Projection I
Canopies 0
Signs 0
Height Permit
0 # Structures 0
Use/Nature ~ENTAL DUPLEX / JAMES BORCHARDT CONSTRUCTION REPLACED 9 WINDOWS WITHOUT A PERMIT, SAME SIZE SAME
of Work _OCATION, NO STRUCTURAL CHANGES
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
$2,000.00 Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid
[] Permit Voided J
$26.00 Park Dedication $0.00
Date 10/20/2004 FinallO.P. 00/00/0000
Parcelld # 0907560000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s)('~d to severe any necgss~ry approvals before starting..s..~ch activity. ,
Signatui~X~¢ (!~ ~ L~.~ 0 .~ ~"~('"'~ ~ Date !0*-(~*C'*~
Address Oshkosh WI 54901-0000 Telephone Number ~
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.