Loading...
HomeMy WebLinkAbout0111186-Building (foundation only)OSHKOSH or-,I THE WATER Job Address 2743 MINERVA ST Designer Category 112 - Foundation Permit Single Family Type · Building ~) Sign CITY OF OSHKOSH No BUILDING PERMIT - APPLICATION AND RECORD Owner DEWEY HOMES INC Create Date Contractor DEWEY HOMES INC (~)Canopy (~) Fence (~ Raze 111186 10/18/2004 Plan F1-112-1004R Zoning R-2 Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation · Poured Concrete ~) Floating Slab (~ Concrete Block (~ Post Occupancy Permit Not Required Park Dedication Class of Const: VB Rooms 0 Bedrooms 0 Baths 0 (~ Pier (~ Other C) Treated Wood Flood Plain # Dwelling Units 0 Height Stories 0 Ft. Height Permit # Structures Size [] Projection Canopies 0 Signs 0 Use/Nature qSFPJ FOUNDATION ONLY- New single family of Work HVAC Contractor Electric Contractor Fees: Valuation $10,000.00 Plan Approval Issued By: ~ 4.,~.~ $0.00 Permit Fee Paid [] Permit Voided J Plumbing Contractor $149.00 Park Dedication $0.00 Date 10/19/2004 Final/O.P. 00/00/0000 Parcel Id # 1230160000 in the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and te~cure any neces~.~r~ aJ~provals before starting such activity. Signat~J~'~/~/~' Date ,j~'~--~' '~ ' J~ Agent/Owner Address 1941 BEECI~S,T~'~'/ OSHKOSH WI 54901 - 0000 Telephone Number 920-231-3389 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is' received. Work may continue if the inspection is not performed within two business days from the time the project is ready.