Loading...
HomeMy WebLinkAbout0110499-BuildingOSHKOSH ON THE WATER Job Address 112 OTTER AVE Designer Category 223 - Alteration Offices, Banks, Prefessional Type · Building (~) Sign CITY OF OSHKOSH No 110499 BUILDING PERMIT - APPLICATION AND RECORD Owner OSHKOSH BGOSH INC Create Date 09/13/2004 Contractor FOX CITIES CONST CORP (~Canopy (~Fence (~Raze Plan Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation (~ Poured Concrete (~ Floating Slab (~) Pier · Other (~) Concrete Block (~ Post (~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Size ~ Projection Canopies Signs Use/Nature Office/First floor, North/Operations room / interior alterations - remove various partitions, install vadous partitions, install new flooring, of Work 2ther activities associated with redecorating. HVAC Contractor Electric Contractor Fees: Valuation Issued By: $31,650.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $150.00 Park Dedication [] Permit Voided Date 09/15/2004 $0.00 Final/O.P. 00/00/0000 Parcel Id # 0200250000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) a,_n.d ~,~¢~LI.,~O any necessary approvals before starting such activity. ~ Signature~'~ % .... Date ~ ~--'-JX ~ Agent/Owner / ' Address 4614 RED FOX RD OSHKOSH WI 54904 - 0000 Telephone Number 235-8008 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.