HomeMy WebLinkAbout0110305-Building (foundation)OSHKOSH
ON THE WATER
216 E IRVING AVE
Job Address
Designer
Category 141 - Exterior Remodeling Plan
Type · Building (~ Sign (~) Canopy (~) Fence (~ Raze
Zoning Class of Const:
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories
Garage 0 Sq. Ft. Baths 0
Foundation · Poured Concrete (~) Floating Slab (~ Pier (~ Other
(~) Concrete Block (~ Post (~ Treated Wood
Occupancy Permit Not Required Flood Plain No
Park Dedication Not Required # Dwelling Units 0
CITY OF OSHKOSH No 110305
BUILDING PERMIT - APPLICATION AND RECORD
Owner THOMAS N/JANE E NINTZEL Create Date 09/02/2004
Contractor OWNER
0 Ft.
Size
[] Projection
Canopies
Signs
Height Permit Not Required
# Structures 0
Use/Nature SFR/ Construct foundation as per plans under existing kitahen and bathroom. AIIIoadsmusttrensferproperly.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valu~O00.O0
issued By.~~
Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided~
$56.00 Park Dedication $0.00
Date 09/02/2004 FinallO.P. 00/00/0000
Parcel Id # 1000390000
in the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals befo£e starting such activity.
Signatu re ~.~.~* ,~'¢~"~/ Date ~
Agent/Owner
Address 216 E IRVING AVE OSHKOSH WI 54901 - 4515 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.