Loading...
HomeMy WebLinkAbout0110305-Building (foundation)OSHKOSH ON THE WATER 216 E IRVING AVE Job Address Designer Category 141 - Exterior Remodeling Plan Type · Building (~ Sign (~) Canopy (~) Fence (~ Raze Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete (~) Floating Slab (~ Pier (~ Other (~) Concrete Block (~ Post (~ Treated Wood Occupancy Permit Not Required Flood Plain No Park Dedication Not Required # Dwelling Units 0 CITY OF OSHKOSH No 110305 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS N/JANE E NINTZEL Create Date 09/02/2004 Contractor OWNER 0 Ft. Size [] Projection Canopies Signs Height Permit Not Required # Structures 0 Use/Nature SFR/ Construct foundation as per plans under existing kitahen and bathroom. AIIIoadsmusttrensferproperly. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valu~O00.O0 issued By.~~ Plan Approval $0.00 Permit Fee Paid [] Permit Voided~ $56.00 Park Dedication $0.00 Date 09/02/2004 FinallO.P. 00/00/0000 Parcel Id # 1000390000 in the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals befo£e starting such activity. Signatu re ~.~.~* ,~'¢~"~/ Date ~ Agent/Owner Address 216 E IRVING AVE OSHKOSH WI 54901 - 4515 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.