Loading...
HomeMy WebLinkAbout0110401-Building (roof)OSHKOSH ON THE WATER ,Job Addrees 1246 WHEATFIELD WAY Designer Category 141 - Exterior Remodeling Type · Building (~ Sign CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner MARKW/TAMMY RUMLOW Contractor OWNER No Create Date Plan (~) Canopy (~) Fence (~) Raze 110401 07/15/2004 Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete (~) Floating Slab (~ Pier (~) Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Not Required Flood Plain __ Height Permit Park Dedication # Dwelling Units 0 # Structures Size ~.P__rojection Canopies Signs Use/Nature ~FPJ LATE PERMIT/Re-rcofed a portion of the house (Tracy Weeks Construction did the work.) of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: d ~ $1,000.00 Plan Approval $0.00 Permit Fee Paid [] Permit_V_o.?~d~i Plumbing Contractor $20.00 Park Dedication $0.00 Date 09/09/2004 Final/O.P. 00/00/0000 Parcel Id # 1340430000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to seca re~a~r.n),/.~/~ssa~ appr, pv~¥~ before starting such activity. Address ~246 WHEATFIELD WAY OSHKOSH WI 54904 - 7400 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.