HomeMy WebLinkAbout0112347-Plumbing (shower & kitchen sink)OSHKOSH
ON THE WATER
.lob Address 211 HIGH AVE
Contractor KOCH PLUMBING
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 1
Bar Sink 0
Water Heater 0
Site Drain 0
Roof Drain 0
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner NORMAN R BOCK
Category 440- Industrial-Interior
No 112347
Create Date 01/17/2005
Plan
Shower 1 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0
Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
Lndry Stndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0
Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature
of Work
INSTALL SHOWER & KIT SNKAND ELIMINATE 2 SHAMPOO BOWLS
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0
0
Valuation $1,500.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided
Issued By
Parcel Id #
0101410000
Date 01/17/2005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 2005 DOTY ST OSHKOSH WI 54902 - 0000 Telephone Number
920-231-6661 or 235-
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.