HomeMy WebLinkAbout0112349 POSHKOSH
ON THE WATER
.lob Address 1705 1707 TAFT AVE
Contractor KOCH PLUMBING
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Lndry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 1 Sump Pump
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner CHARLES A/MARIL PERRY LIVING TRUST
Category 441 - Industrial-Water Heaters
No 112349
Create Date 01/17/2005
Plan
0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0
0 WaterSoffner 0 DrinkFtn 0 ServSink 0 SodaDisp 0
0 Local Waste 0 Wait. St. 0 ShampSink 0 Coffee Maker 0
0 ClothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0
0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0
0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye WashStatn 0
0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature
of Work
REPLACENGWTRHTR *EIVCUMINGSELEC
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0
0
Valuation $5,000.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided
Issued By
Parcel Id #
1608701000
Date 01/17/2005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 2005 DOTY ST OSHKOSH WI 54902 - 0000 Telephone Number
920-231-6661 or 235-
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.