HomeMy WebLinkAboutItem 9 PLAN COMMISSION STAFF REPORT DECEMBER 2, 2025 ITEM 9: Architectural Building Plan Review for New Wastewater Treatment Buildings at 233 North Campbell Road Applicant: Stephen Matthias Owner: City of Oshkosh Action Requested: The applicant is requesting an architectural building plan review for a new tertiary filtration building and UV disinfectant building. Applicable Ordinance: State Statute 62.23(5) requires the Plan Commission review the “location and architectural design of any public building”. Property Location and Background Information: The subject site is an 11.42-acre property with frontage on North Campbell Road, Dempsey Trail, Knapp Street, and Campbell Creek. The site is used as the City’s wastewater treatment plant and includes several structures and associated paved areas. The surrounding area consists of University athletic fields and vacant land to the north, institutional and multi-family residential uses to the east, and a mixture of industrial and commercial uses to the south and west. The 2040 Comprehensive Land Use Plan recommends Community Facility use for the subject site. Existing Land Use Zoning Waste Water Treatment Plan I Recognized Neighborhood Organizations Marina District Adjacent Land Use and Zoning Existing Uses Zoning North University & Vacant I & I-PD South Commercial & Industrial I & UI East Institutional & multi-family residential I & RMU West Commercial & Industrial UI, UI-PD & MR-12 The City has identified the need for two additional buildings on the existing waste water treatment site to aid in impending treatment limits of the plant and upgrade existing treatment operations. The first proposed building is on the northwest portion of the site adjacent to Campbell creek and will contain new tertiary filtration units and other ancillary equipment. The second proposed building will contain new UV disinfection treatment equipment. This building will be constructed over an existing tank (reusing the existing foundation). Page 1 Item 9 – 233 N Campbell Rd. – Arch. Building Review Architectural building plan review is required for the two new buildings. According to the applicant, the new building walls will consist of tilt-up precast panels with a brick form liner finish on the exterior. The existing buildings have block walls with brick exterior. The brick form liner pattern of the proposed precast panels is intended to match the face brick on the existing buildings and will be stained to match the color of the existing buildings. There will be a white band around the top of the walls similar to some of the other buildings at the wastewater treatment site. The applicant has noted that on past projects this approach has produced building facades that look very similar to adjacent buildings with genuine brick and block walls. Page 2 Item 9 – 233 N Campbell Rd. – Arch. Building Review Staff has determined that the proposed building designs will not have a negative impact on the surrounding area as the structures will be harmonious with the intended character of the large- scale public utility site. Although the site’s existing buildings have a brick exterior, the proposed pre-cast panels with brick form liner will provide a consistent appearance with other existing buildings on the site. The City’s zoning ordinance does not have design standard requirements for institutional buildings. Tertiary Filtration Building Elevations Page 3 Item 9 – 233 N Campbell Rd. – Arch. Building Review UV Building Elevations Recommendation: Staff recommends approval of the architectural design of the proposed tertiary filtration building and UV disinfectant building. Page 4 Page 5 Page 6 Supplemental Information to Application City of Oshkosh General Application (Oct 20, 2025) Revised 11/3/2025 Narrative of the proposed request – Oshkosh WWTP Tertiary Filtration and UV Disinfection The City of Oshkosh (City) owns and operates a wastewater treatment plant (WWTP) which resides on an existing 30.01-acre City-owned property at the intersection of N Campbell Creek Road and Dempsey Trail. The treatment plant treats incoming wastewater and discharges treated effluent to the Fox River and Campbell Creek. The City has identified the need for two additional buildings on the existing WWTP site to aid in impending treatment limits of the plant and upgrade existing treatment operations. The WWTP also is also upgrading their service entrance equipment and replacing existing generators. The first proposed building is planned for on the northwest portion of the site adjacent to Campbell creek and will contain new tertiary filtration units and other ancillary equipment. The new building will require routine chemical deliveries (once every 2-3 weeks) by semi-trucks that will enter the site off of N Campbell Road. The new building will be joined to the existing north parking lot by a new access road. The truck deliveries are expected to cause only a minimal increase in truck traffic, as the WWTP already receives several chemical deliveries. The second proposed building will contain new UV disinfection treatment equipment. This building will be constructed over an existing tank (reusing the existing foundation), causing a minimal impact to the existing landscape. The new equipment in this building will eliminate the need for the WWTP to receive chlorine gas cylinders will reduce truck traffic to the site. Figure 1 and Figure 2 shows preliminary exterior renderings of the two new buildings with their relation to the existing site features. The new building walls will consist of tilt-up precast panels with a brick formliner finish on the exterior. The brick pattern will match the face brick on the existing buildings and will get stained to match the color of the existing buildings. There will be a white band around the top of the walls similar to some of the other buildings at the WWTP site. On past projects, this approach has produced building facades that look very similar to adjacent buildings with genuine brick and block walls. Both new buildings will include exterior HVAC equipment that is not expected to increase noise levels above the required ordinance levels at the site. No other impacts to adjoining properties are expected. There will be no change to the existing parking at the site. The site’s impervious surface Page 7 ratio with the proposed improvements will increase to 35%, which is still below the allowable 60% threshold. The entrance service electrical equipment replacement will require the removal of two trees along Demsey Trail. New trees will be planted in-kind on the north end of the plant. The new generator equipment will require one additional wall louver on the front of the generator building (see Figure 3), one additional HVAC intake hood on the roof, and an exterior generator fuel tank. The intake hood on the roof will be similar in size to the other two existing units, which are not visible from the road. No other impacts to adjoining properties are expected. Figure 1 - Proposed WWTP Building Renderings Looking Approx. Northeast from Demsey Tr New UV Disinfection Building New Tertiary Filtration Building Existing Control Building Existing Tanks 偡来‸ Figure 2 – Tertiary Filtration Building Rendering, Approximately Looking North Figure 3 – Existing Generator Building Looking North Showing Proposed Wall Louver Location Proposed wall louver on Existing Generator Building New Tertiary Filtration Building New Access Road Page 9 X X X XX X XX XXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X HHHH 100-YR 100-YR 100 - Y R 100-Y R 100-YR 100-YR 100-YR 100-YR 100-YR 100-YR 10 0 - Y R 100-YR 100-YR 100-YR 100-YR 100-YR 100- Y R 100-YR 100-YR DEMPSEY TRAIL N C A M P B E L L R O A D CAMPBELL CREEK UP UP 0 50' Drawing No. Designed By Checked By Filename Approved By Project No. Drawn By Re v i s i o n Nu m b e r Re v i s i o n D e s c r i p t i o n Dr a w n By Da t e Ch e c k e d By Sheet No. Project Date QC R E V I E W CI T Y O F O S H K O S H WA S T E W A T E R T R E A T M E N T P L A N T TE R T I A R Y T R E A T M E N T AN D U V D I S I N F E C T I O N C O N S T R U C T I O N 14556-T SEP 2025 440 TERTIARY FILTRATION BUILDING FFE: 753.00 110 100 120 140 150 200 700 300 301303 302304 410 310 411 412 421 422 420 430 424 423 491 492 600 800 550 500 BUILDING LEGEND 100 - HEADWORKS BUILDING 110 - ADMINISTRATION BUILDING 120 - MAINTENANCE BUILDING 140 - DAFT BUILDING 150 - CHEMICAL BUILDING 200 - GRIT TANKS 300 - PRIMARY TREATMENT 310 - ELECTRICAL CONTROL BUILDING "A" 301-304 - PRIMARY CLARIFIERS NO. 1-4 410 - AERATION TANKS 411-412 - AERATION TANKS NO. 1-2 420 - SECONDARY TREATMENT 421-424 - SECONDARY CLARIFIERS NO. 1-4 430 - ELECTRICAL CONTROL BUILDING "B" 440 - TERTIARY FILTRATION BUILDING 490 - DISINFECTION FACILITY 491-492 - CHLORINE CONTACT TANKS NO. 1-2 500 - DIGESTER COMPLEX 550 - WASTE GAS BURNER 600 - SOLIDS BUILDING 700 - GENERATOR BUILDING 800 - TUNNEL ORDINARY HIGH WATER MARK 100-YR FLOOD HAZARD 002-CR-1 002-CF-1 002-CP-1 002-CG-1 002-EP-1 002-CR-2 002-CF-2 002-CP-2 002-CG-2 002-EP-2 002-CR-3 002-CF-3 002-CP-3 002-CG-3 490 DISINFECTION FACILITY FFE: 754.65 GENERAL NOTES: 1.SEE GENERAL NOTES ON 999-G SERIES DRAWINGS FOR ADDITIONAL NOTES AFFECTING WORK ON THIS DRAWING. 2.WORK DENOTED AS FUTURE IS TO BE PERFORMED BY ANOTHER CONTRACTOR UNDER THE ELECTRICAL SERVICE AND GENERATORS CONTRACT. CONSTRUCTION MAY COINCIDE WITH WORK UNDER THIS CONTRACT. FUTURE ELECTRICAL SERVICE EQUIPMENT SI T E D E V E L O P M E N T KE Y P L A N 002-CK-1 8 NMS NMS BEG SAM 002CK1.DWG SEE 490 DRAWINGS SEE 430 DRAWINGS Page 10 THRU-WALL SCUPPER,TYP. SEE A781 OVERFLOW SCUPPER CONDUCTOR HEADAND DOWNSPOUT. SEE A781 AIR TERMINAL, TYP GALVANNEALEDHOLLOW METAL DOORAND FRAME W/INSULATED GLASS CONCRETE SPLASH BLOCK, TYP. SEE A932 24' - 11/2" 1'- 10 1/2" 16' -11/2" 1' - 10 1/2" PRECAST CONCRETEWALL PANEL (FINISH 2)PRECAST CONCRETEWALL PANEL (FINISH 1)GUARDRAIL WALL MOUNTED LADDER PREFINISHED METALCOPING INFILL PANEL EXHAUST FANSEE H DRAWINGS OVERHEAD COILINGDOOR, TYP. SEE A802 GALVANNEALED HOLLOWMETAL DOOR AND FRAME W/ INSULATED GLASS, TYP. SEE A825 Drawing No. Designed By Checked By Approved By Drawn By Revision Number RevisionDescription Drawn By Date Checked By Sheet No. Project No. Project Date Filename 14556_440.RVT SAM CLS SDR SDR 81 440-AS-7 14556-T SEP 2025 ELEVATIONS TERTIARY FILTRATION BUILDING CITY OF OSHKOSH WASTEWATER TREATMENT PLANT TERTIARY TREATMENT AND UV DISINFECTION CONSTRUCTION GENERAL NOTES: 1.SEE GENERAL NOTES ON 999-G SERIES DRAWINGSFOR ADDITIONAL NOTES AFFECTING WORK ON THISDRAWING. 1'8'0 NORTH ELEVATION 1'8'0 SOUTH ELEVATION QC RE V I E W TERTIARY FILTRATION BUILDING ELEVATIONS Page 11 AIR TERMINAL, TYP. PRECAST CONCRETEWALL PANEL (FINISH 2) PRECAST CONCRETEWALL PANEL (FINISH 1) CONC FILL IN SEWETWELL, SLOPE1/4"/FT TOWARDSPUMPS. CONC FILL THICKNESS AT LP=2" WALL MOUNTED LADDER GUARDRAIL INFILL PANEL OVERHEADCOILING DOOR GALVANNEALED HOLLOWMETAL DOOR AND FRAMEW/ INSULATED GLASS, TYP. SEE A825 Drawing No. Designed By Checked By Approved By Drawn By Revision Number RevisionDescription Drawn By Date Checked By Sheet No. Project No. Project Date Filename 14556_440.RVT SAM CLS SDR SDR 82 440-AS-8 14556-T SEP 2025 ELEVATIONS TERTIARY FILTRATION BUILDING CITY OF OSHKOSH WASTEWATER TREATMENT PLANT TERTIARY TREATMENT AND UV DISINFECTION CONSTRUCTION GENERAL NOTES: 1.SEE GENERAL NOTES ON 999-G SERIES DRAWINGSFOR ADDITIONAL NOTES AFFECTING WORK ON THISDRAWING. 1'8'0 WEST ELEVATION 1'8'0 EAST ELEVATION QC RE V I E W TERTIARY FILTRATION BUILDING ELEVATIONS Page 12 ROOFTOP UNIT PRECAST CONCRETEWALL PANEL (FINISH 2) PRECAST CONCRETEWALL PANEL (FINISH 1) WALL MOUNTED LADDER GUARDRAIL AIR TERMINAL GALVANNEALED HOLLOWMETAL DOOR AND FRAMEW/ INSULATED GLASS, TYP. SEE A825 OVERFLOW SCUPPER,TYP. SEEA785 THRU-WALL SCUPPER, TYP. SEE A781 WALL MOUNTED LADDER GUARDRAIL CONDUCTOR HEADAND DOWNSPOUT.SEE A781CONCRETE SPLASHBLOCK. SEE A932 Drawing No. Designed By Checked By Approved By Drawn By Revision Number RevisionDescription Drawn By Date Checked By Sheet No. QC RE V I E W Project No. Project Date Filename 14556_420.RVT SAM CLS SDR SDR 125 490-AS-7 14556-T SEP 2025 ELEVATIONS DISINFECTION FACILITY CITY OF OSHKOSH WASTEWATER TREATMENT PLANT TERTIARY TREATMENT AND UV DISINFECTION CONSTRUCTION GENERAL NOTES: 1.SEE GENERAL NOTES ON 999-G SERIES DRAWINGSFOR ADDITIONAL NOTES AFFECTING WORK ON THISDRAWING. 1'8'0 NORTH ELEVATION 1'8'0 SOUTH ELEVATION 1'8'0 EAST ELEVATION 1'8'0 WEST ELEVATION UV BUILDING ELEVATIONS Page 13 N C A M PB ELL R D DURFEE AV IDAHO ST W 3RDAVFOSTER ST KNAPP ST D E M P S E Y T R KNAPP ST WITZEL AV FVTCAthleticField Seniors Center Boat Launch U W - O Riv erfro nt/J a c o b S h a piro P a J:\GIS\Planning\Plan Commission Site Plan Map Template\2023 Plan Commission Site Plan Map Template.mxd User: katrinam Prepared by: City of Oshkosh, WI Printing Date: 10/29/2025 1 in = 360 ft1 in = 0.07 mi¯233 N CAMPBELL RDNOTICE MAP City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer Page 14 N C A M P B E L L R D KNAPP ST DE M PSEY TR WITZEL AV IDAHO ST KNAPP ST D E M P S E Y T R N CAMPBELL RD N C A MPBELL RD WITZEL AV KNAPP ST I I-PD I-PD MR-12 RMU SR-9 UI UI UI-PD UMU UMU J:\GIS\Planning\Plan Commission Site Plan Map Template\2023 Plan Commission Site Plan Map Template.mxd User: katrinam Prepared by: City of Oshkosh, WI Printing Date: 10/29/2025 1 in = 260 ft1 in = 0.05 mi¯233 N CAMPBELL RDZoning & Aerial Map City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer Page 15