Loading...
HomeMy WebLinkAbout0112342-Building (3-seasons room)OSHKOSH ON THE WATER .lob.Address 2355 PATRIOT LN Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner EMIL C/AUDREY M REICHOW Contractor OWNER Category 141 - Exterior Remodeling No 112342 Create Date 01/11/2005 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SIDE BY SIDE DUPLEX/LATE PERMIT/Enclosed the rear deck to create a 3 seasons room. The roof and floor system were existing. Code of Work =ompliant exits required off the patio doors. (late fee waived) HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $4,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $38.00 Park Dedication $0.00 Date 01/17/2005 Final/O.P. 00/00/0000 Parcel Id # 1621641100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2355 PATRIOT LN OSHKOSH WI 54904 - 6928 Telephone Number CONDO To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.