Loading...
HomeMy WebLinkAbout0110017-Building (roof)OSHKOSH ON THE WATER Jeb Address 662 W 5TH AVE Designer Category 141 - Exterior Remodeling Type · Building (~ Sign CITY OF OSHKOSH No 1100'17 BUILDING PERMIT -APPLICATION AND RECORD Owner MICHAEL L/CARLA DREDSKE Create Date 06/16/2004 Contractor OWNER Plan Canopy (~) Fence (~ Raze Zoning Unfinished/Basement Finished/Living Garage Foundation 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. · Poured Concrete O Floating Slab (~) Concrete Block (~) Post Occupancy Permit Park Dedication Class of Const: Size Rooms 0 Height 0 Ft. [] Projection Bedrooms 0 Stories Canopies Baths 0 Signs (~) Pier (~ Other O Treated Wood Flood Plain __ Height Permit # Dwelling Units 0 # Structures 0 Use/Nature ~FR/TEAR OFF AND REPALCE EXISTING ROOFING ON HOUSE, INSTALL SIDING ON HOUSE. NO STRUCTURAL CHANGES, NC of Work :)UTSIDE LIGHTS. HVAC Contractor Electric Contractor Fees: Valuation $9,100.00 Issued By: ~'~ ~ -~ Plan Approval $0.00 Permit Fee Paid [] Permit Voided J Plumbing Contractor $74.00 Park Dedication $0.00 Date 08/16/2004 Final/O.P. 06/00/0000 Parcel Id # 0603230000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the C ty strong y urges the permit applicant to contact the easement holder(s) and to se~l~e ahy nec~sa~/~gt;~rovals before starting such activity. ~ k) '-- Agent/Owner Address Oshkosh Wl 54901-0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.