Loading...
HomeMy WebLinkAbout0110025-Building (windows)OSHKOSH ON THE WATER Job Address 1726 DOEMEL ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner EDWARD J BINNER JR Designer Contractor WRIGHTWAY INC Category No 110025 Create Date 08/17/2004 141 - Extedor Remodeling Type ~1 Building (~) Sign _~. Canopy ~_ Fence (~ Raze Zoning Class of Const: Plan Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 0 Ft. Canopies ...... 0 Signs 0 Foundation · Poured Concrete (~ Floating Slab O Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Replace 10 windows in the existing openings. No structural work. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: (~ $6,423.00 Plan Approval $0.00 Permit Fee Paid [] Permit Voided J $56.00 Park Dedication $0.00 Date 08/17/2004 Final/O.P. 00/00/0000 Parcel Id # 1514300000 In the performance of this work I agree to perform all work pursuant to rules governing the described construc[ion. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to sec, j~ce..a~y ne~;es~ry appCo_vals before starting such activity. Signature ~ ~'% '"~ '~,.~ Date .~.\¢~[¢~4.~ ( -' ~ ' Agent/Owner ' Address 1726 DOEMEL ST OSHKOSH WI 54901 - 3173 Telephone Number To schedule inspections please call the inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.