HomeMy WebLinkAbout0112338-Plumbing (water heater)OSHKOSH
ON THE WATER
.lob Address 1046 GREENWOOD CT
Contractor BARTELT PLUMBING
Bathtub 0 Shower 0
Whirlpool 0 Floor Drain 0
Lavatory 0 Lndry Tray 0
Toilet 0 Lndry Stndp 0
Res. Sink 0 Disposal 0
Bar Sink 0 Dishwasher 0
Water Heater 1 Sump Pump 0
Site Drain 0 Classrm Sink 0
Roof Drain 0 Breakrm Sink 0
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner M J C MOKLER PROPERTIES LL
Category 441 - Industrial-Water Heaters
No 112338
Create Date 01/14/2005
Plan
Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0
Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0
Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0
Lab Sink 0 Plaster Sink 0 Standp Rec 0
Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature
of Work
INSTALL ELEC WTR HTR *EIV???
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0
0
Valuation $550.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided
Issued By
Parcel Id #
1522640000
Date 01/14/2005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1420 FAIRFAX ST Oshkosh WI 54904 - 0000 Telephone Number
233-1670
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.