HomeMy WebLinkAbout2005-BuildingOSHKOSH
ON THE WATER
.lob Address 3114 ALGOMA BLVD
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner SAMMONSPLUMBINGOSHKOSHINC
Designer Contractor
No 112323
Create Date 01/14/2005
JIM BAUER CARPENTRY AND CONSTRUCTIOI
Category 223 - Alteration Offices, Banks, Professional Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature Office/Repair south wall damaged by vehicle. Reframe.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$4,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$38.00 Park Dedication $0.00
Date 01/14/2005 Final/O.P. 00/00/0000
Parcel Id # 1225050000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522W MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.