Loading...
HomeMy WebLinkAbout0108773-Building (driveway)OSHKOSH ON THE WATER Job Address 556 MADISON ST Designer Category Type Zoning Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication CITY OF OSHKOSH No 108773 BUILDING PERMIT - APPLICATION AND RECORD Owner MICHELLE KLUG Create Date 06/17/2004 Contractor OWNER 256 - Parking Lots, Driveways · Building (~ S~ig? ~-~ Canopy Class of Const: 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. · Poured Concrete (~) Floating Slab (~ Concrete Block (~ Post Not Required Not Required O Fence (~ Raze Rooms 0 Height Bedrooms 0 Stories Baths 0 (~) Pier (~ Other (~ Treated Wood Flood Plain No # Dwelling Units 0 0 Ft. Plan Size ~ P[oJe¢!o~n Canopies 0 Signs 0 Height Permit Not Required # Structures 0 Use/Nature ~FR/New concrete driveway the width of the garage as per site plan. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation~_~/~00.00 Issued By: /(-/' ~'"~/-,--.---~ Plan Approval $0.00 Permit Fee Paid [] Permit V~id¢.j $20.00 Park Dedication $0.00 Date 08/17/2004 Final/O.P. 00/00/0000 Parcel Id # 0402810000 In the performance of this work I agree to perform ail work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure a~y ne_.c,~_~ary appr0v.al~before starting such activity. Signature t.~h~;t~k.~h_~---~' ~ Date ~--1~'~--~'¢ Akg-eff~Owner Address 556 MADISON ST OSHKOSH WI 54901 - 4914 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.