HomeMy WebLinkAbout0108773-Building (driveway)OSHKOSH
ON THE WATER
Job Address 556 MADISON ST
Designer
Category
Type
Zoning
Unfinished/Basement
Finished/Living
Garage
Foundation
Occupancy Permit
Park Dedication
CITY OF OSHKOSH No 108773
BUILDING PERMIT - APPLICATION AND RECORD
Owner MICHELLE KLUG Create Date 06/17/2004
Contractor OWNER
256 - Parking Lots, Driveways
· Building (~ S~ig? ~-~ Canopy
Class of Const:
0 Sq. Ft.
0 Sq. Ft.
0 Sq. Ft.
· Poured Concrete (~) Floating Slab
(~ Concrete Block (~ Post
Not Required
Not Required
O Fence (~ Raze
Rooms 0 Height
Bedrooms 0 Stories
Baths 0
(~) Pier (~ Other
(~ Treated Wood
Flood Plain No
# Dwelling Units 0
0 Ft.
Plan
Size
~ P[oJe¢!o~n
Canopies 0
Signs 0
Height Permit Not Required
# Structures 0
Use/Nature ~FR/New concrete driveway the width of the garage as per site plan.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation~_~/~00.00
Issued By: /(-/' ~'"~/-,--.---~
Plan Approval
$0.00 Permit Fee Paid
[] Permit V~id¢.j
$20.00 Park Dedication $0.00
Date 08/17/2004 Final/O.P. 00/00/0000
Parcel Id # 0402810000
In the performance of this work I agree to perform ail work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure a~y ne_.c,~_~ary appr0v.al~before starting such activity.
Signature t.~h~;t~k.~h_~---~' ~ Date ~--1~'~--~'¢
Akg-eff~Owner
Address 556 MADISON ST OSHKOSH WI 54901 - 4914 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.