Loading...
HomeMy WebLinkAbout0108767-Building (driveway & parking area)'OSHKOSH ON THE WATER Job Address 3138 COUNTY RD A Designer Category Type Zoning Owner TIM W WENZLAFF CITY OF OSHKOSH No 108767 BUILDING PERMIT - APPLICATION AND RECORD Create Date 06/17/2004 FOX VALLEY ASPHALT ~ Feqc~ (~Raze Class of Const: Contractor 256 - Parking Lots, Driveways ~1 Building (~) ~!_g_n_ O Canopy R-I Unfinished/Basement 0 Sq. Ft. Rooms __ 0 Height __ Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation O Poured Concrete (~ Floating Slab O Pier ~ Other {~) Concrete Block O Post (~ Treated Wood Occupancy Permit Not Required Flood Plain No Park Dedication Not Required # Dwelling Units ..... 0 0 Ft. Plan Size 28' x 22' ~ P~o!¢ction Canopies 0 Signs 0 Height Permit Not Required # Structures 0 Use/Nature of Work IFP,/Construct 28' x 22' paved parking area and a 2nd paved driveway as per plan. - MINIMUM 50 FEET BETWEEN DRIVEWAYS - creening that is present along SE property line to be maintained HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $1,300.00 Plan Approval $0.00 Permit Fee Paid [] Permit Voided $26.00 Park Dedication $0.00 Date 06/17/2004 Final/O.P. 00/00/0000 Parcel Id Cf 1519625000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and t.o-,secure any necessary approvals before starti~.g such activity. Signature ~.J~ IJ'')~0~'~,J~-.~'~ Date (~--1(~ ....... [~-~r~/~)wne, Address 3138 COUNTY ROAD A ~'~ OSHKOSH WI 54e01 - 1411 Telephone Number ~ -TL~ ? To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number, Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: 3//3 ~ ~m',~."~7 ~q~'~,/,~,/ ~/Z ZONING: /~ / PROPERTYOWNE CONT.ACTO.: ! · CONSTRUCTION DATA: [] New Construction [] Addition [] Alteration TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) - /L~r~r~ ,~ -~o?~ ~--~ ~ COMPLIANCE CHECKLIST DEFICIENT DEFICIENT DEFICIENT [] Use [] Lot Width [] Lot Area [] Lot Area Per Family [] Flood Plain [] Front Yard [] Front Yard Side Street [] Rear Yard ['-] Side Yards [] Building Area [] Parking Standards [] Off-Street Loading Standards [] Vision Clearance [] Transitional Yard Standards [] Landscape Standards [] Height [] Conditions of Approval [] Compliance with P.C. or BZA Conditions of Approval [] Signage Standards [] Mechanical Equip. Screening [] Parking Lot Lighting REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is use is proposed. proposed. APPROVED Plan Commission Action Required Variance(s) Required REVIEWED BY: [] DENIED DATE: 2003 3