HomeMy WebLinkAbout0108777 BOSHKOSH
ON THE WATER
,Job Address 700 N WESTHAVEN DR
Designer Chris Korth
CITY OF OSHKOSH No 108777
BUILDING PERMIT - APPLICATION AND RECORD
Owner WESTHAVEN OFFICE LLC Create Date 06/07/2004
Contractor AHERN FIRE PROTECTION
Category 223 - Alteration Offices, Banks, Professional
Type · Bui]ding (~ Sign (~) Canopy (~) Fence
Zoning Class of Const:
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height
Finished/Living 0 Sq, Ft. Bedrooms 0 Stories
Garage 0 Sq. Ft. Baths 0
Foundation · Poured Concrete O Floating Slab (~ Pier (~) Other
(~) Concrete Block (~) Post (~ Treated Wood
Occupancy Permit Not Required Flood Plain No
Park Dedication Not Required # Dwelling Units 0
Plan L2-22-0404
(~) Raze
0 Ft.
Size
_~... pr._ojection
canopies
Signs
Height Permit Not Required
# Structures 0
Use/Nature 3ffice Bldg / Install Automatic Fire Suppression System as per plans
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
issued By:
Plumbing Contractor
$42,000.00 Plan Approval.
$0,00 Permit Fee Paid
$190.00 Park Dedication $0.00
Date 06/17/2004 Final/O.P. 08/05/2004
[] Permit Voided J Parcel Id #
in the performance of this work I agree to perform ail work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 201 Morris Court Fond du Lac WI 54936 - 0000 Telephone Number 920-921-9020
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.