Loading...
HomeMy WebLinkAbout0108777 BOSHKOSH ON THE WATER ,Job Address 700 N WESTHAVEN DR Designer Chris Korth CITY OF OSHKOSH No 108777 BUILDING PERMIT - APPLICATION AND RECORD Owner WESTHAVEN OFFICE LLC Create Date 06/07/2004 Contractor AHERN FIRE PROTECTION Category 223 - Alteration Offices, Banks, Professional Type · Bui]ding (~ Sign (~) Canopy (~) Fence Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height Finished/Living 0 Sq, Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete O Floating Slab (~ Pier (~) Other (~) Concrete Block (~) Post (~ Treated Wood Occupancy Permit Not Required Flood Plain No Park Dedication Not Required # Dwelling Units 0 Plan L2-22-0404 (~) Raze 0 Ft. Size _~... pr._ojection canopies Signs Height Permit Not Required # Structures 0 Use/Nature 3ffice Bldg / Install Automatic Fire Suppression System as per plans of Work HVAC Contractor Electric Contractor Fees: Valuation issued By: Plumbing Contractor $42,000.00 Plan Approval. $0,00 Permit Fee Paid $190.00 Park Dedication $0.00 Date 06/17/2004 Final/O.P. 08/05/2004 [] Permit Voided J Parcel Id # in the performance of this work I agree to perform ail work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 201 Morris Court Fond du Lac WI 54936 - 0000 Telephone Number 920-921-9020 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.