Loading...
HomeMy WebLinkAbout0112284-BuildingOSHKOSH ON THE WATER .lob .Address 303 PEARL AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner LANDMARK DEV CO LTD PTNSHP Contractor R J ALBRIGHT INC. Category 223 - Alteration Offices, Banks, Professional No 112284 Create Date 01/10/2005 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation (~) Poured Concrete (~) Floating Slab (~) Pier O Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature NW Office Suite / Alterations to create larger reception/waiting area - Remove and reinstall various partition walls. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: SOLAR ELECTRIC SERVICES INC Plumbing Contractor $10,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $74.00 Park Dedication $0.00 Date 01/10/2005 Final/O.P. 00/00/0000 Parcel Id # 0101580000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 5711 GREEN VALLEY RD OSHKOSH WI 54904 - 0000 Telephone Number 231-8635 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.