Loading...
HomeMy WebLinkAbout0112269 BOSHKOSH ON THE WATER .lob Address 1018 VAN BUREN AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner LANA J SIEBERS Contractor SURE-DRY-BASEMENT SYSTEMS INC Category 141 - Exterior Remodeling No 112269 Create Date 01/03/2005 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/LATE PERMIT/Repaired a section of foundation wall, installed 4 foundation anchors drain tile and a sump crock. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $4,293.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $144.00 Park Dedication $0.00 Date 01/07/2005 Final/O.P. 00/00/0000 Parcel Id # 1607630000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 230 N DIVISION APPLETON WI 54911 - 4609 Telephone Number 920-830-9655 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.