HomeMy WebLinkAbout0112269 BOSHKOSH
ON THE WATER
.lob Address 1018 VAN BUREN AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner LANA J SIEBERS
Contractor SURE-DRY-BASEMENT SYSTEMS INC
Category 141 - Exterior Remodeling
No 112269
Create Date 01/03/2005
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/LATE PERMIT/Repaired a section of foundation wall, installed 4 foundation anchors drain tile and a sump crock.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$4,293.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$144.00 Park Dedication $0.00
Date 01/07/2005 Final/O.P. 00/00/0000
Parcel Id # 1607630000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 230 N DIVISION APPLETON WI 54911 - 4609 Telephone Number
920-830-9655
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.