Loading...
HomeMy WebLinkAbout0112283-Building (signs) e OSHKOSH ON THE WATER Job Address 2120HIOST CITY OF OSHKOSH No 112283 BUILDING PERMIT - APPLICATION AND RECORD Owner JOHN F E RICHARDSON/JACQUELIN Create Date 01/10/2005 Designer Contractor FLYWAY INC Category 254 - Signs Plan Type 10 Building . Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths 0 U Projection I Canopies 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Office/ Install non-ilium. wall sign, 12" letters. Install new face on existing sign cabinet. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,500.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: Date 01/10/2005 Final/O.P. 00/00/0000 U Permit Voided I Parcelld # 0600020100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address N 5528 MIRANDA WAY Agent/Owner FOND DU LAC WI 54937 - 0000 Telephone Number 920-921-7181 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. <to Z . ~ ~ 3 ~~~!; ~æ¡;¡~", zii!1E":Í'3 Ui;1 8~g",~ i;U~ ~~~U ~§~Ë~ [¡¡~:;;~:;; ¡i~g~~ ii~~~ ~~B~~ ¡¡~êjU §~~~~ ;;;g""=tij ~æg¡g~