HomeMy WebLinkAbout0112216 B(~ CITY OF OSHKOSH
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1285 PHEASANT CREEK DR Owner DANIEL J/DEBORA GOERTZEN
Designer Contractor PORTSIDE PROPERTIES INC
Category 140 - Interior Remodeling
No 112216
Create Date 01/04/2005
Plan
Type 10 Building ~ Sign ~ Canopy ~ Fence ~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Finsihing a portion of the basement to include an office, 1/2 bath and living area. The beam shall be sized to carry imposed loads after
of Work lhe column post is moved.
HVAC Contractor MCM AIR INC Plumbing Contractor PLUFF PLUMBING
Electric Contractor ZIMMER ELECTRIC LLC
Fees: Valuation $14,000.00 Plan Approval $0.00 Permit Fee Paid $94.00 Park Dedication $0.00
Issued By: Date 01/05/2005 Final/O.P. 00/00/0000
Permit Voided
Parcel Id # 1342503300
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 923 S MAIN ST OSHKOSH WI 54902 - 0000 Telephone Number 426-1544
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.